Difference between revisions of "IHE Testing and Tools Committee 2009-03-23 Teleconference Minutes"

From IHE Wiki
Jump to navigation Jump to search
Line 10: Line 10:
  
 
==Minutes==
 
==Minutes==
* [ftp://ftp.ihe.net/Testing_and_Tools/Quality_Assurance_IHE_Connectathon_v2.doc Connectathon Process Guidelines]: Chris Carr
+
1) Connectathon Process Guidelines
* [http://product-registry.ihe.net/ Registry] Update: Eric Poiseau
+
* Reviewed draft posted by Chris Carr and incorporated comments into a [ftp://ftp.ihe.net/Testing_and_Tools/Quality_Assurance_IHE_Connectathon_v3.doc new draft of Connectathon Process Guidelines document]
* Gazelle Update: Steve Moore/Eric Poiseau
+
:* May be advisable to split Cor's original detailed material on Connectathon QC processes into a separate document
 +
:* Add more detail about the process for approval/sanctioning of events
 +
:* Include more descriptive information on the link between using tools and contributing to their development
 +
:* Steve Moore to review sections on project manager responsibilities and training requirements
 +
:* '''Action Item:''' Chris Carr and Steve Moore to refine draft and submit for review on Monday, March 30 tcon
 +
 
 +
2) [http://product-registry.ihe.net/ Product Registry] Development and Rollout
 +
* Eric displayed the current development version of the Product Registry, which is ready for user testing on both the vendor and user sides
 +
:* Need to develop hierarchy of system categories for simple search functionality: market categories rather than IHE actors
 +
:* Target group of vendors to enter integration statement data and provide feedback
 +
::* Allow two weeks for them to play with system and provide feedback
 +
::* Candidate participants: George Cole, Bob Barker, Bruno Laffin, Tone Southerland, Manfred Oberfell, Hitachi, Kevin O'Donnell, device area (IDCO profile?)
 +
::* Link on bottom of registry page to bug tracking system where they can provide comments
 +
::* One contact in Eric's lab to be assigned to manage feedback
 +
:* Second pilot with group of users to spend one week searching the data entered and providing input on functionality and GUI
 +
::* Chris Carr to find user/reviewers: six-eight people (Europe, Asia and NA)
 +
 
 +
3) Gazelle Update
 +
* Steve Moore and Eric Poiseau discussed their strategy for Gazelle development over the next 6 months
 +
:*
 +
 
 
* Connectathon Monitor/Project Manager Training: Steve Moore/Eric Poiseau
 
* Connectathon Monitor/Project Manager Training: Steve Moore/Eric Poiseau
  

Revision as of 11:57, 23 March 2009

Attendees

  • Charles Parisot - GE
  • Cor Loef - Philips
  • Eric Poiseau - INRIA
  • Steve Moore - MIR
  • Bill Majurski - NIST
  • Nichole Drye-Mayo - RSNA
  • Joan McMillen - RSNA
  • Chris Carr - RSNA

Minutes

1) Connectathon Process Guidelines

  • May be advisable to split Cor's original detailed material on Connectathon QC processes into a separate document
  • Add more detail about the process for approval/sanctioning of events
  • Include more descriptive information on the link between using tools and contributing to their development
  • Steve Moore to review sections on project manager responsibilities and training requirements
  • Action Item: Chris Carr and Steve Moore to refine draft and submit for review on Monday, March 30 tcon

2) Product Registry Development and Rollout

  • Eric displayed the current development version of the Product Registry, which is ready for user testing on both the vendor and user sides
  • Need to develop hierarchy of system categories for simple search functionality: market categories rather than IHE actors
  • Target group of vendors to enter integration statement data and provide feedback
  • Allow two weeks for them to play with system and provide feedback
  • Candidate participants: George Cole, Bob Barker, Bruno Laffin, Tone Southerland, Manfred Oberfell, Hitachi, Kevin O'Donnell, device area (IDCO profile?)
  • Link on bottom of registry page to bug tracking system where they can provide comments
  • One contact in Eric's lab to be assigned to manage feedback
  • Second pilot with group of users to spend one week searching the data entered and providing input on functionality and GUI
  • Chris Carr to find user/reviewers: six-eight people (Europe, Asia and NA)

3) Gazelle Update

  • Steve Moore and Eric Poiseau discussed their strategy for Gazelle development over the next 6 months
  • Connectathon Monitor/Project Manager Training: Steve Moore/Eric Poiseau


Testing and Tools Committee