Difference between revisions of "DEV Domain F2F Apr 21-24, 2020 Webex"

From IHE Wiki
Jump to navigation Jump to search
m (get rid of pcd meeting category)
 
(82 intermediate revisions by 6 users not shown)
Line 1: Line 1:
  
 
[[Patient Care Device | PCD Home]]
 
[[Patient Care Device | PCD Home]]
[[Category:PCD Meeting]]
+
 
  
 
{{TOCright}}
 
{{TOCright}}
Line 7: Line 7:
 
'''Please NOTE:  Agenda created March 16 - still being edited.'''
 
'''Please NOTE:  Agenda created March 16 - still being edited.'''
  
Paul Sherman, PCD TPM
+
Michael J. Kirwan, DEV TPM
  
 
== Meeting Objectives ==
 
== Meeting Objectives ==
Line 13: Line 13:
 
: These face-to-face meetings have a number of objectives depending on the committees involved:
 
: These face-to-face meetings have a number of objectives depending on the committees involved:
 
:* '''Planning Committee''':  Review, plan and initiate PCD activities; contribute to planning of the HIMSS Interoperability Showcase and other Showcases and events; recruit vendors and users.
 
:* '''Planning Committee''':  Review, plan and initiate PCD activities; contribute to planning of the HIMSS Interoperability Showcase and other Showcases and events; recruit vendors and users.
:* '''Technical Committee''':  Review and adopt brief profile proposals; contribute to Connectathon test tools, tests, and procedures.
+
:* '''Technical Committee''':  Review and adopt brief profile proposals; Adjourn Joint PC&TC meeting. contribute to Connectathon test tools, tests, and procedures.
  
  
Line 25: Line 25:
  
 
:- To assist European participants, all meetings will be morning meetings, with a meeting on Friday.
 
:- To assist European participants, all meetings will be morning meetings, with a meeting on Friday.
:: the times will be 8AM EDT - 1PM EDT
+
:: the times will be 9AM EDT - 1PM EDT
  
 
::: Tuesday April 21:  Pump Working Group  
 
::: Tuesday April 21:  Pump Working Group  
Line 34: Line 34:
 
:: The schedule is proposed; actual meeting times may change during the week.
 
:: The schedule is proposed; actual meeting times may change during the week.
  
: '''Daily Schedule''' -  
+
: '''Daily Schedule''' - All times Eastern Daylight Time (US)
  
:* 08:00 - 10:15    Session #1
+
:* 09:00 - 11:15    Session #1
  
:* 10:30 - 13:00    Session #2
+
:* 11:30 - 14:00    Session #2
  
 
== Agenda Suggestions ==
 
== Agenda Suggestions ==
Line 46: Line 46:
 
From the PC Action Items [[PCD Planning Committee Action Items]]:
 
From the PC Action Items [[PCD Planning Committee Action Items]]:
  
:168 Execute Stakeholder Survey
+
: 172 DEV Domain Implementation
 +
: 173  Update TF for DEV Domain
  
 
From the TC Action Items: [[PCD Technical Committee Action Items]]:
 
From the TC Action Items: [[PCD Technical Committee Action Items]]:
Line 53: Line 54:
 
: 201  Pump utilization - publicizing
 
: 201  Pump utilization - publicizing
 
: 202  MEMDMC CP to make PID and PV1 segments optional
 
: 202  MEMDMC CP to make PID and PV1 segments optional
: 204  Gazelle and Proxy and NIST Tool improvements
 
  
 
== Webex Support==
 
== Webex Support==
Line 61: Line 61:
 
Reminders: the IP agreement is in force, and participation counts toward voting rights.
 
Reminders: the IP agreement is in force, and participation counts toward voting rights.
  
Please note: the log in and phone number for each meeting is the same as for our WG meetings. The password is different, and has been included in the email sent to participants.  These are not provided here for security reasons (this is a public Wiki page).
+
Please note: the log in and phone number for each meeting is the same as for our WG meetings. The password is included in the email sent to participants.  These are not provided here for security reasons (this is a public Wiki page).
  
 
The HIMSS Webex page is [[https://himss.webex.com/ HIMSS Webex]]
 
The HIMSS Webex page is [[https://himss.webex.com/ HIMSS Webex]]
  
Tuesday morning, April 21: Pump WG: Meeting Number:  
+
:PCD Meetings
 +
 
 +
:- Tuesday, April 21: Pump WG: Meeting Number: 922 682 629
 +
 
 +
:- Wednesday April 22: DEV joint and PC: Meeting Number: 922 036 096
 +
 
 +
:- Thursday April 23: Joint PC&TC and TC: Meeting Number: 921 597 565
 +
 
 +
:- Friday, April 24: TC: Meeting Number:  929 476 319
  
Tuesday afternoon, April 21: Pump WG: Meeting Number:  
+
: PCH Meetings:
  
Wednesday morning, April 22: PC: Meeting Number:  
+
:- Wednesday morning, April 22: Meeting Number:  
  
Thursday morning April 23: PC&TC: Meeting Number:  
+
:- Thursday morning April 23: Meeting Number:  
  
Friday morning, April 24: TC: Meeting Number:  
+
:- Friday morning, April 24: Meeting Number:
  
 
== Attachments / Materials ==
 
== Attachments / Materials ==
  
Documents related to the meeting '''when available '''will be found at the [[ftp://ftp.ihe.net/Patient_Care_Devices/Meetings/Face%20to%20Face%20Meetings/2020-April-Virtual/ ftp site]] unless otherwise noted. Documents are available without a password.
+
Documents related to the meeting '''when available '''will be found at the [[https://drive.google.com/drive/folders/1rYUd1gk-IP2I93DSFMGeKr-lLQgWKLMS New Devices Google Drive]] unless otherwise noted. Documents are available without a password.
  
 
Schedule/Deadlines: [[Patient Care Device]] and [[Domain Milestones]]
 
Schedule/Deadlines: [[Patient Care Device]] and [[Domain Milestones]]
Line 101: Line 109:
 
|-
 
|-
 
| align="center" | '''Tuesday'''
 
| align="center" | '''Tuesday'''
| align="center" | 08:30 - 4:15
+
| align="center" | 09:00 - 2:00
 
| align="center" | Pump workgroup
 
| align="center" | Pump workgroup
 
|
 
|
 
::
 
::
:* Morning (08:30-12:00)
+
:* Morning (09:00-2:00)
 
::* Introductions - Kurt
 
::* Introductions - Kurt
 
::* Agenda review - Kurt
 
::* Agenda review - Kurt
 
::* [[Patent_Disclosure_Process | IHE IP Management Process]] - Kurt
 
::* [[Patent_Disclosure_Process | IHE IP Management Process]] - Kurt
 
:::
 
:::
::* 8:45
+
::* 9:15
:::CPs for Channel Relay - 1hr
+
:::MEMDMC terms for pumps - 30 min
 +
::::2020-02-24.DMC.1d.2020-03-30T16.IPv4-IPv6.xls
 +
:::::https://drive.google.com/open?id=1DTGH766Q5dOoeL2kM3JRjbjkH9KE9Gup
 +
:::MEMDMC Battery status - 30 min
 +
::::2020-02-24.DMC.1d.2020-03-30T16.IPv4-IPv6.xls
 +
:::::https://drive.google.com/open?id=1DTGH766Q5dOoeL2kM3JRjbjkH9KE9Gup
 +
::
 +
:::Bolus from existing Infusion - 30 min
 +
::
 +
::* Break (10:55-11:05)
 
:::
 
:::
::* Break (10:15-10:30)
+
:::Pump Terms containment model update - 1.5hr
 
:::
 
:::
:::CP for TCI - 30 min
 
:::MEMDMC terms for pumps - 30 min
 
:::Status update on Multi-step -  30 min
 
:::Status update on program specific drug library limits -  30 min
 
 
:::
 
:::
:* Lunch (12:00-1:00)
+
::* Break (12:10-12:30)
:
+
:::Pump alert/alarm events - 30 min
:* Afternoon (1:00-4:00)
+
:::ACM state changes - 30 min
:::Pump Terms containment model update - 1hr
+
:::Mapping of detailed pump events to broader 11073 terms - 30 min
:::Use of Systematic names - 1hr
+
:::
::::
 
::* Break (3:00-3:15)
 
:::TBD    - 1 hr
 
 
::::
 
::::
 
::::
 
::::
  
:* 4:15 > Meeting Adjournment
+
:* 2:00 > Meeting Adjournment
 
|-
 
|-
 
|-
 
|-
Line 150: Line 160:
 
|-
 
|-
 
| align="center" | '''Wednesday Pt. 1'''
 
| align="center" | '''Wednesday Pt. 1'''
| align="center" | 08:00 - 10:15
+
| align="center" | 09:00 - 11:15
| Joint PCD/PCHA Meeting
+
| Joint IHE Devices Meeting
 
|
 
|
:* 08:00 > [[Patent_Disclosure_Process | IHE IP Management Process]] (Kurt)
+
:* 09:00 > [[Patent_Disclosure_Process | IHE IP Management Process]] (Kurt)
:* 08:05 > Introductions and Agenda Review (Kurt and Thom)
+
:* 09:05 > Introductions and Agenda Review (Kurt and Thom)
 
+
:* 09:20 > Welcome (15 minutes)
:: IHE & PCD Overview (10 minutes)
+
:* 10:35 > Subdomain Reports (20 minutes each)
:: PCHA & Continua Overview (10 minutes)
+
:: PCD
:: Joint Exploration Committee Overview & Status (20 minutes) (Thom and Todd)
+
:: PCH
::- Market Opportunity Analysis
+
:: DPI
::- Domain / Subdomain Scoping & Mapping
+
:* 10:35 > DEV Domain Guidance and AOB (15 minutes)
::- Test Process & Tooling
+
:: Feedback from Kevin O'Donnell
::- MARCOM
+
:: IEEE P2733 Overview
:: Domain status
+
:: Move future DEV meeting to end of F2F?
::- Charter
+
:* 10:50 > Next steps and wrap up
::- Goals & Objectives
+
:* 11:00 > Adjourn Joint DEV Meeting
::- Organization
 
::- Work Groups
 
::- Roadmap
 
:* 10:00 > Adjourn Joint PCD/PCHA Meeting
 
  
 
|-
 
|-
 
| align="center" | '''Break'''  
 
| align="center" | '''Break'''  
| align="center" | 10:15 - 10:30 AM
+
| align="center" | 11:00 - 11:15 AM
 
|
 
|
 
|  
 
|  
Line 179: Line 185:
 
|-
 
|-
 
| align="center" | '''Wednesday Pt. 2'''
 
| align="center" | '''Wednesday Pt. 2'''
| align="center" | 10:30 AM - 1:00 PM
+
| align="center" | 11:15 AM - 2:00 PM
 
| PCD Planning Committee (PC)
 
| PCD Planning Committee (PC)
 
|
 
|
  
:* 10:30 > Start PC meeting  
+
:* 11:15 > Start PC meeting  
 
:* Introduction
 
:* Introduction
 
::- [[Patent_Disclosure_Process | IHE IP Management Process]] (5 minutes)(Kurt)
 
::- [[Patent_Disclosure_Process | IHE IP Management Process]] (5 minutes)(Kurt)
Line 199: Line 205:
 
::- Pump (Kurt, Jeff R.)
 
::- Pump (Kurt, Jeff R.)
 
::- IPEC (Kurt)
 
::- IPEC (Kurt)
::- RDQ (John R) - Suspended per April F2F.
 
 
::- PCIM (John R)
 
::- PCIM (John R)
 
::- Physio monitor (John R)
 
::- Physio monitor (John R)
Line 210: Line 215:
  
 
:- Review current Action Item: [[PCD Planning Committee Action Items]]:
 
:- Review current Action Item: [[PCD Planning Committee Action Items]]:
:: 168 Execute Stakeholder Survey
+
::  172 DEV Domain Implementation
 +
::  173 Update TF for DEV Domain
  
: 1:00 > Adjourn Planning Committee meeting
+
: 2:00 > Adjourn Planning Committee meeting
  
  
Line 230: Line 236:
 
|-
 
|-
 
| align="center" | '''Thursday Pt. 1'''
 
| align="center" | '''Thursday Pt. 1'''
| align="center" | 08:00 - 10:15 AM
+
| align="center" | 09:00 - 11:15 AM
 
|  
 
|  
 
|
 
|
  
:* 08:00 > Joint PC/TC meeting
+
:* 09:00 > Joint PC/TC meeting
  
 
:* Introduction
 
:* Introduction
Line 243: Line 249:
 
:* '''IHE International Board - Update & Feedback''' (Todd)
 
:* '''IHE International Board - Update & Feedback''' (Todd)
  
:* Review 2019 Milestones - [http://wiki.ihe.net/index.php?title=Domain_Milestone_Dates]
+
:* Review 2020 Milestones - [http://wiki.ihe.net/index.php?title=Domain_Milestone_Dates]
  
 
:* '''Five year plan'''  
 
:* '''Five year plan'''  
Line 258: Line 264:
 
|-
 
|-
 
| align="center" | '''Break'''  
 
| align="center" | '''Break'''  
| align="center" | 10:15 - 10:30 AM
+
| align="center" | 11:15 - 11:30 AM
 
|
 
|
 
|  
 
|  
 
|-
 
|-
 
| align="center" | '''Thursday Pt. 2'''  
 
| align="center" | '''Thursday Pt. 2'''  
| align="center" | 10:30 AM - 1:00 PM
+
| align="center" | 11:30 AM - 2:00 PM
 
| PCD Technical Committee (TC)
 
| PCD Technical Committee (TC)
 
|  
 
|  
  
: 10:30 > Open PCD Technical Committee (TC)
+
: 11:30 > Open PCD Technical Committee (TC)
 
:: TC Welcome and Agenda Review (Tom Kowalczyk)
 
:: TC Welcome and Agenda Review (Tom Kowalczyk)
 
:: Announcement – Decision Making meeting (TC Co-Chairs)
 
:: Announcement – Decision Making meeting (TC Co-Chairs)
Line 299: Line 305:
  
 
|}
 
|}
 
 
  
 
=== Friday, April 24, 2020 ===
 
=== Friday, April 24, 2020 ===
Line 314: Line 318:
 
|-
 
|-
 
| align="center" | '''Friday Pt. 1'''
 
| align="center" | '''Friday Pt. 1'''
| align="center" | 08:00 - 10:15 AM
+
| align="center" | 09:00 - 11:15 AM
 
|  
 
|  
 
|
 
|
  
:* 08:00 > Continue TC Meeting
+
:* 09:00 > Continue TC Meeting
  
 
: TC Action item review
 
: TC Action item review
Line 328: Line 332:
 
:: 201  Pump utilization - publicizing
 
:: 201  Pump utilization - publicizing
 
:: 202  MEMDMC CP to make PID and PV1 segments optional
 
:: 202  MEMDMC CP to make PID and PV1 segments optional
:: 204 Gazelle and Proxy and NIST Tool improvements
+
 
 +
:* 09:45 > RTM and IEEE P11073-10101b draft standard (Paul Schluter)
 +
:: Overview of where we are and process to begin “ballot group formation” for IEEE P11073-10101b
 +
 
 +
:* 10:45 > Containment modeling  (Paul Schluter)
 +
:: Key items needed for more rigorous message definition and validation, focusing on containment trees and essential next steps to improve IHE PCD DEC HL7 V2 message conformance testing.
  
  
 
|-
 
|-
 
| align="center" | '''Break'''  
 
| align="center" | '''Break'''  
| align="center" | 10:15 - 10:30 AM
+
| align="center" | 11:15 - 11:30 AM
 
|
 
|
 
|  
 
|  
 
|-
 
|-
 
| align="center" | '''Friday, Pt. 2'''  
 
| align="center" | '''Friday, Pt. 2'''  
| align="center" | 10:30 AM - 1:00 PM
+
| align="center" | 11:30 AM - 2:00 PM
 
| PCD Technical Committee (TC)
 
| PCD Technical Committee (TC)
 
|  
 
|  
  
::> Continued topic discussions
+
:*11:30 > Continued topic discussions
 +
 
 +
:: RTMMS update given by NIST contractor Michael Faughn
  
 
: F2F Action Review (from this week)
 
: F2F Action Review (from this week)
 +
 +
:- '''DEV'''
 +
:: Proposed agendas for Fall F2F
 +
 +
::- If Virtual
 +
::: Tuesday AM Pump WG
 +
::: Wed AM PC and Joint PC/TC
 +
::: Thurs AM TC
 +
::: Friday AM Joint DEV
 +
 +
::- If Live
 +
::: Tuesday Pump WG
 +
::: Wed AM PC and Joint PC/TC
 +
::: Wed PM and Thurs AM TC
 +
::: Thurs PM Joint DEV
  
 
:: '''PC'''
 
:: '''PC'''
Line 350: Line 376:
  
 
:: '''PC&TC'''
 
:: '''PC&TC'''
::
 
  
 
:: '''TC'''
 
:: '''TC'''
Line 369: Line 394:
  
  
'''Tuesday, October 15'''
+
'''Tuesday, April 21'''
 
+
: Kurt Elliason(Smiths Medical), Al Engelbert (BBraun), Andrea Robertson (Smiths Medical), Bill Haralson(Smiths Medical), Brian Witkowski (BBraun), Christophe Fournier (Fresenius), Jeff Rinda (ICU Medical), Marufur Rahmen (ICU), Nathan Berg (Smiths Medical), Paul Schluter (CMI), Tom Kowalczyk (BBraun), Michael Faughn(Prometheus), Dalibor Pokrajac(GuardRFID), John Krupka
On Site: '' Morning: Al Engelbert (BBraun), Brian Witkowski (BBraun), Christophe Fournier (Fresenius),  Dan Kernan (Epic), Jeff Rinda (ICU Medical), Ray Kan (Baxter), Tom Kowalczyk (BBraun), Todd Cooper '''' 
 
 
 
''Afternoon: Al Engelbert (BBraun), Brian Witkowski (BBraun), Christophe Fournier (Fresenius), Dan Kernan (Epic), Jeff Rinda (ICU Medical), Paul Schluter (CMI), Ray Kan (Baxter), Tom Kowalczyk (BBraun), Todd Cooper, John Garguilo '''' 
 
  
  
Remote: "Ali Nakoulima(Cerner), Monroe Pattillo "
+
'''Wednesday, April 22'''
 +
Todd Cooper, Kurt Elliason, Al Engelbert, Thom Erickson, Javier Espina, Michael Faughn, Christophe Fournier, Ken Fuchs, John Garguilo, Bill Harrelson, Dan Kernan, Tom Kowalczyk, Monroe Pattillo, Marufur Rahman, John Rhoads, Paul Schluter, Paul Sherman, Kumi Terai, Rob Wilder, Brian Witkowski
  
  
'''Wednesday, October 16'''
+
'''Thursday, April 23'''
 +
Todd Cooper, Kurt Elliason, Al Engelbert, Thom Erickson, Javier Espina, Michael Faughn, Christophe Fournier, Ken Fuchs, John Garguilo, Bill Harrelson, Dan Kernan, Tom Kowalczyk, Monroe Pattillo, Marufur Rahman, John Rhoads, Paul Schluter, Paul Sherman, Kumi Terai, Rob Wilder, Brian Witkowski
  
On Site: ''Brian Witkowski (BBraun), Christophe Fournier (Fresenius), Dan Kernan (Epic), Jeff Rinda (ICU Medical), Paul Schluter (CMI), Ray Kan (Baxter), Tom Kowalczyk (BBraun), Todd Cooper, John Garguilo, Thom Erickson, Kurt Elliason (Smiths), Rob Wilder (Spok), Paul Sherman, John Rhoads (Philips), John Donnelly, Amit Trivedi, Ken Fuchs (Draeger) ''
+
'''Friday, April 24'''
 
+
Nicholas Crouzier, Kurt Elliason, Javier Espina, Michael Faughn, Christophe Fournier, Ken Fuchs, John Garguilo, Bill Harrelson, Dan Kernan, Tom Kowalczyk, Monroe Pattillo, Dalibor Pokrajac, Marufur Rahman, John Rhoads, Paul Schluter, Paul Sherman, Rob Wilder, Brian Witkowski
 
 
Remote: ''Ali Nakoulima(Cerner), Monroe Pattillo ''
 
 
 
 
 
 
 
'''Thursday, October 17'''
 
 
 
On Site:
 
 
 
 
 
 
 
Remote:
 
  
 
== Discussion ==
 
== Discussion ==
Line 422: Line 434:
 
|-
 
|-
 
| align="center" | 2
 
| align="center" | 2
| '''CPs for Channel Relay and TCI''' <br>  
+
| '''MEMDMC terms for pumps and MEMDMC Battery status''' <br>  
 
| '''Status/Discussion:'''
 
| '''Status/Discussion:'''
:Reviewed content of CP for channel relay
+
:Added MDS terms to VMD as optional if there multiple modules.
:: - add diagrams to CP and TF
+
:MDC_ATTR_ID_SOFT term needs to be checked.  Looked in 10201 for definition. 
:: - changes based on IPEC supplement, will follow up with John R to incorporate into TF
+
:From 10201 "Soft-Id. MDC_ATTR_ID_SOFT. OCTET STRING. Settable, e.g., hospital inventory number."
 
:
 
:
:Reviewed content of CP for TCI
+
:Discussion of battery terms, Dalibor expressed need for Low battery indication.  We have terms for Battery charge level and time remaining.  Also have events for battery low and depleted that could be used.
:: - changes based on IPEC supplement, will follow up with John R to incorporate into TF
 
  
  
 
|-
 
|-
 
| align="center" | 3
 
| align="center" | 3
| '''MEMDMC terms for pumps''' <br>  
+
| '''Bolus from existing Infusion''' <br>  
 
| '''Status/Discussion:'''
 
| '''Status/Discussion:'''
: - Need to CP profile to clarify from specific to generic.
+
:Given Clinician Bolus (CH)
: - New event MDCX_EVT_DEVICE_MANAGEMENT replaces other trigger events in existing OBR-4, Trigger events move to an OBX
+
::Need clarification on whether the ‘O’ on Bolus from existing infusion table should really be ‘X’
:ftp://ftp.ihe.net/Patient_Care_Devices/Devices/InfusionPumps/CommonTerms/New_MEM_terms15OCT19.xlsx
+
:::Should be 'O', since some EMR vendors always send TQ1. 
 +
::Confirm: MDCX_INFUSION_PROGRAM_TYPE to be used to signify type, while RXG-15/16, TQ1, and MDC_FLOW_FLUID_PUMP to define values
 +
::Need clarification on what MDCX_INFUSION_PROGRAM_TYPE “continuous” is expected to be used for -- Need CP  Should be OBX-3  with enumeration of "clinician dose"
 +
:Titration (XO)
 +
::Remove “not valid for PCA”  means not valid for PCA device type, revisit in the future if it should be for PCA Basal rate only. Need input from EMR vendors. Typically a change to a PCA pump would be a new order.
 +
 
 +
:Intermittent Bolus
 +
::Need these segments available for PCD-03
 +
:::              MDC_TIME_PD_DOSE_START_INTERVAL
 +
:::              MDCX_TIME_PROG_NEXT_DOSE
 +
:::              MDCX_TIME_REMAIN_NEXT_DOSE
 +
:::              Need clarification on whether “MDC_TIME_PD_PROG” is needed
 +
:defer to pump terms discussion later today
 +
 
  
 
|-
 
|-
 
| align="center" | 4
 
| align="center" | 4
| '''Ststus updates''' <br>  
+
| '''Pump Terms containment model update''' <br>  
 
| '''Status/Discussion:'''
 
| '''Status/Discussion:'''
:Status update on Multi-step
+
:Brian working with a MongoDB.  Created a pump MDS containment generator  supports 01, 10, need to add 03.  Could support others
:: CPs have been done for TF, waiting for EMR and pump vendors to implement.
+
:could put it on a website so the group can review and comment
  
:Status update on program specific drug library limits
 
:: tabled for now.
 
  
 +
|-
 +
| align="center" | 5
 +
| '''Pump alert/alarm events and Mapping of detailed pump events to broader 11073 terms''' <br>
 +
| '''Status/Discussion:'''
 +
: Reviewed content of ListParSrcEvt.3o.x3u.2020-04-20T16.P3-expanded-displayText.xls
 +
: Targeting August to start ballot process
 +
:Would like description of infusion pump for standard.  Dialysis has 8 page description
  
 
|-
 
|-
| align="center" | 5
+
| align="center" | 6
| '''Pump Terms/RTMMS''' <br>  
+
| '''ACM state changes''' <br>  
 
| '''Status/Discussion:'''
 
| '''Status/Discussion:'''
:Pump Terms containment model update
+
:Need to make sure REFIDs work well with state machines
:: Demonstration of new graphical view
 
  
:Use of Systematic names
 
:: - Will not use for pump terms. Will make sure we have a revised preamble that takes common terms and has good definition up front.
 
  
  
Line 492: Line 518:
 
| '''Status/Discussion:'''  
 
| '''Status/Discussion:'''  
  
: N/A
+
: DEV Domain Mar 25, 2020  [[DEV Joint 2020-03-25 Webex]]
  
 
'''Decisions/Issues:'''
 
'''Decisions/Issues:'''
Line 506: Line 532:
  
 
:* 08:05 > Introductions and Agenda Review (Kurt and Thom)
 
:* 08:05 > Introductions and Agenda Review (Kurt and Thom)
:: (Slides will be available on the PCD ftp site)
 
:: IHE & PCD Overview (10 minutes) (Todd)
 
::- Todd - 15 years of work.  How to ensure cooperation and clear delineation of responsibilities.  At the time, most devices were regulated, so was clearer.  Went through slides showing PCD process.  Described Domains, Deployment Committees and sponsoring organizations.  Discussed Plug-a-thons vs. Connectathons and Conformity Assessment.
 
:: PCHA & Continua Overview (10 minutes) (Thom)
 
::- Explained why we’re here.  Provided PCHA and Continua difference info; Continua is the engineering side.  Provides design Guidelines for manufacturers, etc.  Reviewed Implementation Framework.  Working to minimize field confusion about who does what and the appearance of conflicting standards.  Went over pain points.  Reviewed progress to date, determined PCD best landing spot.  Will integrate Continua Test Tool into Gazelle.  Press release went out yesterday.  Reviewed mapping Continua into IHE, fair amount of work to be done.  Concern:  Many Domains in PCHA could disappear in IHE.  This should be discussed and resolved.  SDO relationships need to stay well defined.  That will be maintained and the relationships emphasized.
 
::- Reviewed New Devices Domain and three “subdomains”.  Subdomains are new, we may redefine it as needed going forward.  Reviewed their foci.  Sponsorship overview – new sponsors; OR.net and PCHA.
 
:::  Thom reviewed PCH subdomain.  Slides available.
 
:: Joint Exploration Committee Overview & Status (20 minutes) (Thom and Todd)
 
::- Market Opportunity Analysis
 
::- Domain / Subdomain Scoping & Mapping
 
::- Test Process & Tooling
 
::- MARCOM
 
:: Vote on Proposal for PCD 2.0 Domain Reorganization -
 
:::- Rename PCD Domain to "Devices (DEV)" domain  (Board endorsed)
 
:::: How does this affect naming documents and transactions? 
 
:::- and Create (3) DEV Subdomains: 
 
::::* Device Point-of-care Interoperability (DPI) - device-to-device Plug-and-play interoperability around bedside
 
::::* Patient Care Devices (PCD) - enterprise integration
 
::::* Personal Connected Health (PCH) - PCHAlliance "Continua"
 
:::: Vote – Approved unanimously with two abstentions.
 
:::- Create Joint domain-wide coordination committees:  Joint Planning Committee, Joint Technical Committee, Domain Coordination Committee
 
:: Launch Personal Connected Health Subdomain (60 minutes) (PCD and PCH)
 
::- Charter
 
::- Goals & Objectives
 
::- Organization
 
::- Work Groups
 
::- Roadmap (2019-2020)
 
  
 +
:* Subdomain Reports
 +
:: Presentations will be on the ftp site.
 +
:: PCD -
 +
::- Many products using DEC profile.  IPEC moved into FT.  Provided summary of Profile’s progress.  Discussing sterilizer Profile.  10101B – terms under review for update and balloting.  Working a lot on Quiet Hospital, had planned demos at HIMSS2020.  SDPi and Quiet Hospital groups merged, this is going very well.  Looking for regulatory and clinical input.  Discussed ECRI participation.  MEM – looking at remote command/control.  Will update our report for DEV – Need to meet and discuss how to proceed
 +
:: PCH
 +
::- POU
 +
::: TF published, wiki launched.
 +
::- Paul Sherman and Mary are working on DEV page redirects as needed.
 +
::-  Working on Direct to Cloud operation, lightweight DIM. 
 +
::- Reviewed Direct to Cloud; stack, simplified DIM and prototype protocol stack. 
 +
::: Simplified DIM: looking to simplify for personal health devices, could move beyond to D2C and Bluetooth LE.  Hope to have best of both worlds.  Currently under Board of Directors review.  IEEE group discussed this on Monday, will want to review/change model title.  Still looking at how to change it in official PAR.  Will need to review and discuss further. 
 +
::: Mobile Health apps – Not yet launched and working on the charter.  Looking to involve new participants (Apple, etc.)
 +
::- Test and Tools
 +
::: Maintenance release in May,  Gazelle integration complete.  Some other items pending funding.
 +
::- Marcom review.  Developed common message, feel free to use or share it. Wrote a number of blogs, ID markets, ID’d vendors to represent, collaborate with Global eHealth Consortium..  Discussed comms strategy.  Discussed reporting this to Board.
 +
:: DPI
 +
::- Rebranding HL7 to HL7 Device Workgroup.  Balklot closes 4/26.
 +
::- Launched WP last April, finished Oct.  Ken summarized history and flow.  Question on using going forward, more of a living document.
 +
::- Reviewed ISO/IEEE 11073 SDC
 +
::- Reviewed/highlighted Use Cases.  In process is Remote Monitoring during COVID-!9 response. (FDA initiated).
 +
::- SDPi Supplement – Developing 4 profiles, include TF 1, 2, and 3 material and testing at Korean CN.  Profiles are Plug and Play, Repoorting, Alerting, External Control.
 +
::- Reviewed Supplement Developement.  Will build on existing momentum, SDPi 1.0 foundation, work streams/teams, then white papers.
 +
::- Presented/recorded HIMSS presentation, will share link when it’s available.
 +
::- Proposed Joint Joint HL7-IHE Gemini Program.  Deliverables – SDPi Supplement, HL7 DoF IG, and joint white papers.  Goal – Leverage the resources to create deployable products that are regulatory compliant.
 +
::- Create a set of Collaboration Tooling.
 +
::- Question about Military/Disaster casualty care.  How to decide where to evacuate to?  That is part of  this process, but not the main focus.
 +
::  Link to [[https://ainq.com/ai-launches-the-saner-project/ Saner Project]]  as discussed.
 +
:*  DEV Domain Guidance and AOB (15 minutes)
 +
:: Feedback from Kevin O'Donnell
 +
::- He’s voiced some concerns on how we’re organizing,, but has no specific info on what we’re violating.  Todd has asked for specifics, no response.  He’ll ask again.  Could be sour grapes or fear of change.  We should proceed.
 +
::- Ballot – Create Tiger Team to address remaining items finalizing DEV structure.  Passed unanimously.  Todd will convene the group
 +
:: IEEE P2733 Overview
 +
::- View unavailable, Ken reviewing verbally.  Slides will be available.  Group struggling to find its way forward. 
 +
:: Move future DEV meeting to end of F2F?
 +
::- Some discussion, will bear in mind
  
Adjourn Joint PCD/PCHA Committee (PC)
+
:*  Next steps and wrap up
 +
::  DEV Tiger Team – Todd will start that.
 +
 
 +
Adjourn Joint DEV Committee (PC)
  
  
 
'''Decisions/Issues:'''
 
'''Decisions/Issues:'''
  
: Voted: Rename PCD Domain to "Devices (DEV)and create (3) DEV Subdomains.
 
 
:- Unanimous approval with two abstentions.
 
  
 
'''Action(s):'''
 
'''Action(s):'''
Line 584: Line 618:
 
| '''Status/Discussion:'''
 
| '''Status/Discussion:'''
  
 
+
:: '''General PCD Work Program Review''' (statuses, plans only, details during TC sessions):
Reviewed current PCD programs
 
 
::- ACM (Rob W for Monroe P)
 
::- ACM (Rob W for Monroe P)
::: Slides on ftp site
+
::: Current status; In FT, 19 vendors at Connectathon, Showcase cancelled.
::: PCD 06 and 07 tested? Yes, with multiple participants05 has not.  Other Domains may need to change how they deliver messages to accommodate these notifications.  Concerns for alert/alarm notifications, not really useful for patient safety issues.  Has mACM been well tested?  Not really, just a couple of data accumulators.  No delivery expertise.  Can’t really tell how they would use it.  Monroe provided mACM background.  ACM can add all the capabilities needed easily to PALM and Radiology; the vendors are about 10 years behind us.
+
::: Quiet Hospital and SPDi merged, 34 members 10 organizations.   
 +
::: Lab results and Rad Workflow pushed to 2021
 
::- MEM DMC (Rob W for Monroe P)
 
::- MEM DMC (Rob W for Monroe P)
::: Slides on ftp site
+
::: TI, in Connectatrhons No updates planned this cycle
 
::- MEM LS (Rob W for Monroe P)
 
::- MEM LS (Rob W for Monroe P)
::: Slides on ftp site
+
::: TI, in Connectatrhons No updates planned this cycle
::: Found ways to implement finding external locationsTeletracking is also involved.  Waiting critical mass to bring others on board. It’s getting close
+
::- RDC – still out thereNot much work, but white paper is available.
::- MEM RDC –
 
:::  Slides on ftp site
 
 
::- WCM (Paul Schluter)
 
::- WCM (Paul Schluter)
::: Pretty stable, promoting its use.
+
::: Not a lot of news, vendors have implemented.  Nomenclature will be able to support vent info.
 
::- IDCO (Paul Schluter)
 
::- IDCO (Paul Schluter)
:- Work continuing on, providing new termsMay be close to CN participation.
+
::: Meeting each Friday and updating.  Working with Heart Rhythm Society EMR vendorsHope to be at Connectathon, will work with Paul Sherman to prep.
 
::- RTM (Paul Schluter)
 
::- RTM (Paul Schluter)
:- Michael Faughn working on itPaul’s been working on 10101b.  10101r is in IEEE publicationAlso working on event and alert terms, collaborating with StefanIncluding about 7000 new terms.  May be able to provide medical and technical alert numeric codes, will do it if there is a clear need to do so for Connectathon and Pre-CNPut event codes in a separate ‘bucket’Monday discussion at PHD vent meetingPost meeting comment by Ken “They should at least include some waveforms”.  Deeply concerned that they can’t use 90% of existing work.
+
::: Summary, more detail at TCSignificant 10101b update, everything not in gray will have codesAsked vendors to supply event stringsThree vendors contributed so far, helpful info.  Working with Dialysis vendors to get terms into 10101bFormalized MEM DMC terms.  Nurse call and beds are moving along, but not ready to add to the list.
::- Vent (Paul Schluter)
+
::: 10101b – Talked to IEEE Steering Committee and staffHope to have ballot ready late AugustHope we can join and participateAn invitation will go out late summer, please join.
::- PIV (Jeff R)
+
::- Vent (Paul Schluter) – Keep adding terms, hoping to get more and add them to the terms.
:- Two CPs approved earlier this year, will be in
+
::- PIV (Kurt, for Jeff R) – Not a lot going on.  Have some minor tweaks due.  1 or 2 CPs
::- Pump (Al E, Jeff R.)
+
::- Pump (Kurt, Jeff R.) - A lot of MEMDMC terms, most not pump specific.  Collecting a lot of alarm events, some specific ones.
::: Met yesterday, have two CPs underway, will review them tomorrow
+
::- IPEC (Kurt) – Final Text, in Technical Framework.  Can work on other Profiles.
::- IPEC (Al E)
+
::- PCIM (John R) – On hold, limited resources right nowDiscussing, possible that HL7 v2 won’t quite address needs.  FHIR may be a better fit. Some work by Ioana, but doesn’t quite fit our needs.
::: In FT, it can changed in Gazelle as soon as published
+
::- Physio monitor (John R) – Continual flow of input capabilities, managed in terminology managementWill want to look at it as we rethink TF organizationMay want to enrich physio monitoring terms.
::- RDQ (John R) - Suspended per April 2019 F2F.
 
::: Can we show it’s suspended? No, nor much need to do soMay have new life in FHIR.
 
::- PCIM (John R)
 
::: Percolating in the background, not much work lately.
 
::- Physio monitor (John R)
 
::: Not much changeGood exemplar in Vol 3Not much demand yet.
 
 
::- DEC  
 
::- DEC  
::: General update PCD TF) (John R)
+
:::* General update PCD TF) (John R) – Pretty stable, new capabilities pretty well coveredExercised well in Connectathons.
:::- Well established, very open, easily added to.  Some TF additions Added semantics, no triggering requirementGood add to MDS attributes following DIM.  Have a TC Action Item underway, hope to work on it this year.
+
:::* DEC OPTION:  FHIR  (Todd C) – A lot of advances, in good position to leverage that work into FHIR implementation.  Planning Korean Connectathon, will work with them for a CP to implement itNot a lot of work, will be able to claim FHIR implementation across whole Domain.
::: DEC OPTION:  FHIR  (Todd C)
+
::- EC (John R) - ‘Parent’ of IPEC.   
:::- Came from Korea CN.  They plan on including SDPi.  Held the CN at a hospital.  Asked to include this in DECAsked about difference between FOU and this.  Next formal step – PCD Planning Committee approval to go forth.
 
:::: Motion:  Start a DEC CP to include an option for HL7 FHIR transport.  John Rhoads seconds.  Discussion – Another appendix, make sure they are not interoperable.  10 approve, 5 abstain.  Passes.
 
::- EC (John R)
 
::: Theoretical except for IPEC.  Expresses what it would look at. 
 
:::-Table for future (remove from future agendas.
 
 
::- DCM Pulse Oximetry
 
::- DCM Pulse Oximetry
::: Currently waiting for someone to take it to FT.  
+
::: Currently waiting for someone to take it to FT. Needs formatting.  Developers don’t wish to move it into FT.  John is willing to help when he has the time.
:::- Table for future (remove from future agendas.
 
  
 
:- Review current Action Item: [[PCD Planning Committee Action Items]]:
 
:- Review current Action Item: [[PCD Planning Committee Action Items]]:
:: 168 Execute Stakeholder Survey
+
::  172 DEV Domain Implementation
::- Manny’s current survey underway and worksCan revisit when MARCOM. Close it.
+
::- Close this and create an Action Item for PCD Coordination with the Tiger Team.  Let Todd know of any questionsReport at next DEV meeting.
 +
::  173 Update TF for DEV Domain
 +
::- Close this and create an Action Item for PCD Coordination with the Tiger Team.  Let Todd know of any questions. Report at next DEV meeting.
  
:: '''"Quiet Hospital" Initiative''' (30 minutes)
+
: Further topics Todd)
:::- Overview / Update
 
:::- Approach for QH support in IHE DEV
 
:::- Roadmap for 2020
 
::*  Discussion of Showcase deployment.  Likely multiple vignettes, but Phil and Bronwen believe it focusses on one vignette.  Alarms will apply across many vignettes anyway.  This will be getting ‘ahead of the game’.  This work closes the loop, which require work on the device mftcr part.  Some regulatory concerns.  Will depend on company policies and FDA rulings.  The FDA may rule before HIMSS.  Todd: In the process, part of a national movement. Many pieces are moving toward it.  Can discuss during SPDi session this afternoon. 
 
::* Marketing – Prep a 30 sec or so blurb saying this is on the way.  This is a significant part of it – need a multi-vendor group to take this.  We need help to prepare it, not getting much yet.  Many Showcase vignettes this could apply to.  May just need to change the way we talk to them about it.  Todd will see if Bronwen is on site, maybe we can meet with her and hammer it out.
 
::*  Since Monroe diagrammed the process, it’s much easier to explain it to others.  The pieces are available and being tied together.  We need to let clinicians know it’s available.  HIMSS is the place to do it.  The message needs to come from outside the vendor community (FDA, HIMSS, others).  Todd has an HIMSS session approved.
 
 
:: Dinner tonight at Trillium Brewing – How many and what time?
 
::* 10 at 6PM
 
  
::  PCD 2.0 (Todd) (45 Minutes)
+
:- Virtual Connectathons – Is the PC part of this discussionWe haven’t discussed itWould be very challenging. Gazelle is the easiest partsTheoretically could use a 4G router to divorce from corporate IT limitationsEpic has a HIMSS system separate from their own regular systems.
:* Much detail is in the slides for this session.
 
::* Reviewed timeline.  Don’t need to solve everything today, but we should get this started.  Bring both global promotion info together.
 
::: Specific topics
 
:::* What is a Device? – No regulatory science for Software as a Medical Device (SaMD). Looked at how things changed in the last 15 years, discussed at 11073 meetingsHow can we summarize in 1-2 bullet points what we’re trying to achieve?  Trying to make our data more accessible? The enterprise piece is well integrated.  Need to expand beyond the enterprise, which PCH can address.   
 
:::*  Subdomains and Governance – How to manage decision making.  A lot needs to be addressedWhat are the problems?  All votes happen at the Domain level, not sub-domain level.  Concerns over one sub-domain dominating the overall domain, especially with patient safety awareness or knowledge.
 
::* Meetings?
 
:::  Meet once a year at least.  Different meeting cadences.  When to meet next.
 
::* Single TF or multiple
 
::* Device use case compendium.
 
::* Transaction labels.
 
::* Testing and tooling.
 
  
Adjourn PCD Planning Committee (PC)
+
:- How to officially add a sponsor to an existing Domain.  IHE has no process separate from Domain creation.  Domain management should have a way to vet sponsors.  Make this a Domain Action Item.
  
  
'''Decisions/Issues:'''
 
  
 +
Adjourn PCD Planning Committee (PC)
  
'''Action(s):'''
 
 
:- Close Action Item 168 - Execute Stakeholder Survey
 
 
|}
 
 
=== Wednesday Joint PC&TC Summary ===
 
 
:{|border="2"
 
|-
 
! width="5%"  align="center" |Item
 
! width="25%"  align="left"  |Topic
 
!              align="left"  |Discussion
 
|
 
 
|-
 
| align="center" | 1
 
| '''Introductions & Agenda Review''' <br>- Chair
 
| '''Status/Discussion:'''
 
|
 
  
 
'''Decisions/Issues:'''
 
'''Decisions/Issues:'''
  
: Introductions
 
: Reviewed the IHE IP Management Process
 
: Reviewed & approve Agenda (10 minutes)
 
: Reviewed and approve PC/TC Meeting discussion summary
 
: Reviewed PCD Calendar and Update  "PCD ftp site [[ftp://ftp.ihe.net/Patient_Care_Devices/]]"
 
  
 
'''Action(s):'''
 
'''Action(s):'''
  
|-
+
: Close existing PC Action items and roll them into a DEV Tiger Team Action Item
| align="center" | 2
+
: Create DEV Action Item on creating a process to add a sponsor to a Domain.
| '''Discussion Summary or Approval of Minutes''' <br>- Chair
 
| '''Status/Discussion:'''
 
|
 
 
'''Decisions/Issues:'''
 
 
 
'''Action(s):'''
 
: September 18 PC/TC summary approved
 
 
 
|-
 
| align="center" | 3
 
| '''Agenda Items''' <br>-
 
| '''Status/Discussion:'''
 
|
 
 
 
 
 
:* 3:40 > Joint PC/TC meeting
 
 
 
:* Introduction
 
::- [[Patent_Disclosure_Process | IHE IP Management Process]] (5 minutes)(Kurt)
 
::- Review & Approve Joint PC&TC Agenda (Kurt)
 
:* ''' IHE DEV - DPI Subdomain Launch''' (Todd)
 
:: Slides are on ftp site.
 
:: DPI Subdomain Overview
 
::- Overview today, technical details tomorrow. Most items covered by slides, additional notes are below.
 
::: Devices prototyped, some in use in Europe.
 
:::- Action Item – Identify organizations actively using this and the modalities they are using it in.
 
::: Discussed OpenICE/MedPnP and possible integration into SPDi.  It’s not provided many results yet, the DoD may be interested in our work.  EEG may be a good use case.  Addressed core standards.
 
::: Good to have an example for tomorrow to discuss and help understand process.
 
:* FHIR Upload TI (Brian R and Thom)
 
::  Brian described the transaction model and data flow.  Using FHIR data model instead of PCD-01 per request of some designers.  Does this support a containment tree?  No.  Is there a way to communicate this? No.  Re-used some existing transactions.  Testing – Group actors?  There are some, need to group a consumer and creator.  When registering at a test event, how would they register it?  It passed through Steve Moore, he created the name, so they conform with the testing process.  Extensive message and transaction discussion.detail
 
 
 
Adjourn PCD Joint Planning & Technical Committee (PC & TC) for the evening.
 
:- Resume 8:30 AM Thursday.
 
 
 
'''Decisions/Issues:'''
 
 
 
 
 
'''Action(s):'''
 
  
  
Line 773: Line 711:
 
| '''Status/Discussion:'''
 
| '''Status/Discussion:'''
 
|
 
|
 
: 08:30 > Resumed Joint PC&TC Meeting
 
  
 
:* '''IHE International Board - Update & Feedback''' (Todd)
 
:* '''IHE International Board - Update & Feedback''' (Todd)
:: Continue to add members, Scott CareSteady membership, ~ 150OR.net will join and sponsor SPDiSome discussion on PCHA on business logisticsChallenges between IHE and HL7Should have a formal HL7, IHE and HIMSS agreement soon. Our impact?  Get a better Int’l platform to share our workCASC moving along, taking over Gazelle. Concert is mothballedFurther certification discussion, unsure what its value is to us and our customersNext F2F and CASC at RSNA
+
:: Good handle on the programs.  Unsure is to know how IHE supports member organizations.
:* ''' IHE DEV - DPI Subdomain Launch''' (Cont. from Wed Q4)(Todd)  
+
:: Membership – about 180, steady and growing a bitThe paid membership seems to be working.
::Published WP in mid-August. Completed public comments in SepFDA had a lot of them. Will change title of on chapter. Some other comments, mostly internationalNext – finalize and publishThen execute roadmapWill have five basic profilesHave a three year plan, Stefan, Todd and Ken will work on Vol 1, hope to have it done by the end of the yearWill propose plug/Connectathons.  Could have three CNS by next year – could go to FT.  Where will the Compendium document liveDiscussed the 3 year roadmapDev days are next activity.  Hope for a 2020 plug-a-thon.  Displayed timeline.
+
:: Funding – Down a bitAffects document staff.
::- Motion – Publish White Paper:  9 in favor, 2 abstain, passed
+
:: Global ehealth Consortium – Started in January, expected announcement at HIMSSGoal is to clarify interoperabilityStill very early in the processReal world impact; For us, pretty clear, outside of IHE, still needs fleshing out.
::- Motion – Approve developing SDPi supplement as proposed in white paper:  9 in favor, 2 abstain, passed
+
:: Covid-19 – Have a page and press release stating what we’ve been doing.
 +
:: Global support – WHO deployment, World summit, deployment committees
 +
:: Testing and Tools – Connectathon, Connectathon seal, certificationAlso looks at tools, especially looking at virtualizing Connectathons and consistent testing.
 +
::- Question – See these announcements, but customers may not see valueIt takes many years, and they don’t see the long viewHow do we keep them interested?  Trying to get the message out to those that decide to implement or purchase systems.
 +
::- Membership Value/Challenges – Transitioned from Steve Moore for CN support to IHE EuropeHow to effectively manage virtualization.
 +
::- Is the message getting out well enough? Generally, so farIs the Product Registry valuable? Somewhat, but not hugelyGood to point to for reference,  But it’s not comprehensive and accurateOur Commercially Available list is more usefulThe Connectathon Results page helpsDon’t know how to increase viability of the RegistryExtensive discussion of how to make it more useful.  Where do customers come up with requirementsUnsureDefinite uptick in IHE requirements by customers.
  
:* '''TF Organization per Reorganization Plan'''
+
(left 8:50 for IDCO help)
:: How to address a single TF that incorporates DEV general + DPI / PCD / PCH subdomain-specific content
 
:: Better use of Word to manage a broader set of developers
 
:: Process for TF & profile & testing coordination across domain (from proposing to balloting to publishing to testing)
 
::  Can use ITI doc as a model.  IHE is familiar with this.  How do we label our transactions?  Answering this will address the ‘carved in stone’ contingent.  Will smooth Vol2.  Questions – Transaction labels and Transaction numbers?  How to address this.  Have transactions that are domain wide and used in all sub-domains.  Will also have sub-domain specific transactions. 
 
  
:* '''Prepare 2020 IHE Milestones'''
+
::- (back 9:07) Tiger Team  - Reviewed Domain Page, discussed framework and internal operations. Other big pieces for our ‘top 10’ list.
:: Review 2019 Milestones - [http://wiki.ihe.net/index.php?title=Domain_Milestone_Dates]
 
::* Determine 2020 Milestone dates
 
:: Table for DEV Joint Planning Committee
 
  
:* '''POU Supplement''' - Review & Determination of plan for public comment => TI => CAT testing
+
:* Review 2019 Milestones - [http://wiki.ihe.net/index.php?title=Domain_Milestone_Dates]
:: Motion to accept the POU Supplement for Public Comment ) in favor, 7 against 5 abstain.
+
:: Ken – Seems compressedDiscussed timelines, resolved concerns.
::* Motion fails
 
::* Comments –
 
::: Profile is not sufficiently mature for public comment.
 
::: Our intent is to work to achieve a viable document in the coming weeks.
 
::: Our recommendation is to target a NA Plug-a-thon in January and Connectathon in June. 
 
::: Need to take the same approach for SPDi and PHD, as a full Domain methodThis should be pursued in DEV Domain wide context, especially harmonizing PHD and POCD devices.
 
  
:* '''Survey of device condition and operation messaging''' (Manny/Paul)
+
:* '''Five year plan'''  
::  Paul will send to TC members next week.
+
:: No current plan
 
 
:* '''Five year plan review'''  
 
:: All Paul could find is:
 
 
::- [ftp://ftp.ihe.net/Patient_Care_Devices/Roadmap_and_Calendar/IHE-PCD_Roadmap_F2F_2017-04-04.xls 2017 Roadmap]
 
::- [ftp://ftp.ihe.net/Patient_Care_Devices/Roadmap_and_Calendar/IHE-PCD_Roadmap_F2F_2017-04-04.xls 2017 Roadmap]
 
::- and [ftp://ftp.ihe.net/Patient_Care_Devices/Roadmap_and_Calendar/IHE_PCD_PlanNotes2011-11-16.doc 2011 Plan Notes]
 
::- and [ftp://ftp.ihe.net/Patient_Care_Devices/Roadmap_and_Calendar/IHE_PCD_PlanNotes2011-11-16.doc 2011 Plan Notes]
:: Table for Joint PC
+
 
 +
:: Architecture – Revamp Vol 1 to reflect new structure of Devices.
 +
:: DEC – Tested PCD-05 at 2020 CN.  Add FHIR option (Todd). 
 +
:: ACM – add PCD-07 (Tom K).  Is PCD-06 affected at all?  Anyone remember the ePHI ?  Smart Alarms – Leave for now, but is likely will be absorbed into Quiet Hospital.
 +
:: Device Context Management – PCIM will be addressed in Dpi
 +
:: Point of Care – Should this move into DPi?  Likely, will need to triage.
 +
:: Quality – Will be a proposal coming soon from DPi White Paper this cycle.  SESMDI – Safe, Effective and Secure Medical Device Interoperability.
 +
:: IEC 60601
  
 
:* Cochair Action item - 106 - Activities Promoting PCD.
 
:* Cochair Action item - 106 - Activities Promoting PCD.
:: Tabled for next Cochair meeting.
+
:: Close, refer to Tiger Team and start as a DEV Action Item.
  
:* '''Location, Dates of the DEV PCD 2020 Spring F2F'''
+
:* '''Location, Dates of the DEV PCD 2020 Fall F2F'''
:: Mayo looks good for POCD, Rob will check for combined.
+
:: Unlikely to get to a hospital by the next meeting.
:: Schedule discussion Use 4 daysTuesday AM for Pump, PC 2nd half of Tues, Joint PC/TC and part of TC on WedFinish TC Thurs. Full DEV Friday AM
+
:: Hotels may be desperate for our business.
:: Dates – Either week of April 13th or 20th. Rob will check.
+
:: Dates Oct 6, Sept 29, Sept 16
 +
:: HIMSS event Sept 16-19 in San Francisco.   
 +
:: Could set up close to a provider at a hotel.
 +
:: September may be challenging for international members.
 +
:: Bring up with Tiger Team.
 +
::  We have enough to start.
  
  
Line 826: Line 763:
 
'''Decisions/Issues:'''
 
'''Decisions/Issues:'''
  
 +
'''Action(s):'''
  
|-
+
:* Cochair Action item - 106 - Activities Promoting PCD.
 +
:: Close, refer to Tiger Team and start as a DEV Action Item.
 +
 
 +
:* Fall F2F
 +
:: DEV decision refer to Tiger Team
  
'''Action(s):'''
 
  
  
 +
 +
|-
  
  
 
|}
 
|}
  
=== Thursday TC Meeting Summary ===
+
=== Thursday/Friday TC Meeting Summary ===
  
  
Line 880: Line 823:
 
|
 
|
  
 +
PCD Program review:
 +
 +
: ACM (Rob W for Monroe P)
 +
:- Many CPs last cycle and some term clarification for SDC/ACM
 +
:- Three CPs in queue for this cycle, including one to support Quiet Hospital
 +
:- Working with other Domains on some Quiet Hospital actions.
 +
:- Pushed out – Add documentation for PCD-06 WCTP XML element.
 +
:- Concerns about test consistency at Connectathons, esp with XML and WCTP.
 +
:- Keep-alive – Applies to all Profiles, achieved via optional transactions.  Discussion over managing the noise level; creating a new transaction vs. leaving it.  The concern is adding ‘noise’ to the network.  Explained how the process works.
 +
: MEM DMC (Rob W for Monroe P)
 +
:- CMI did some ACK work, will incorporate. 
 +
:- NEED non-PID/PV1 message templates.
 +
: MEM LS (Rob W for Monroe P)
 +
:- Need additional PL data type clarifications.  Need some codes – pretty much done.  MDS and VMD also in Paul Schluter’s list.  Pretty much done, Paul will send list to Dalibor.
 +
: DEC (John R)
 +
:- Pretty mature, well used.  Can discuss MDC/VMD structure later.
 +
: EC (John R)
 +
:- Somewhat Proto-Profile, could address more than IPEC.  Alarm/Alert closely related.  Slides highlight this process and use.  Can build on mature work done for IPEC.  Discussed how to generalize.  There is an event professional group with useful information we could incorporate.  What’s a good path forward.  Unsure, but if we do, we need to be careful to use common processes.  Can be a form of clinical decision support.  The equipment is pretty sophisticated, it can do a lot of it, a challenge would be getting clinicians to support this vs. using what they have.  Is there a client for this? 
 +
: IPEC (Al E, Tom)
 +
:- In FT, depending on terms updates.
 +
: PIV (Brian WAl E)
 +
:- Progress on programming a bolus and syringe pumps.
 +
: Pump (Al E, Jeff R.)
 +
:-  Trying to get the new terms and visual representation of contianment model.  In a good spot to get things done before the next F2F
 +
: DPI  (John R)
 +
:- Brand new world.  Meetings going on for a long time.  Now have a new set of DPI and SDC standards, will hear a lot more.  Stay tuned at relevant meetings.
 +
: Physio monitor (John R)
 +
:- What to do with Volume 3 in Profiles.  It’s been dormant for a while.  Good time to look at Vol. 3 again and what we want it to do for us.  Basic maps are in there for basic models, could be a lot more.  A good item to discuss at the DEV Domain level.  What do implementers want?  Thoughts?  Can use Michael Faughn’s work to move forward (MS Word document not useful), let implementers to focus on what’s important to them, especially a computational document to build a model.  Michael is about to send out a document for this type of a model.  Is this Vol 3 only or does it affect the other volumes?  Vol 1 is very public facing, not detailed.  Vol 2 needs to be improved as a learning tool, grown a bit haphazardly, takes a lot of work to find specific content.  Instead of V 2a, 2b, 2c, have them separated into DPi, PCD and PCD.  Word can be used, with proper templates (legal uses them).  Would need instructions to do this.  A good item for the Tiger Team.
 +
: PCIM (John R)
 +
:- 80001 has some templates to manage the risk.  Have found we can’t rely on patient data admin packages.  Need human verification.  HL7 v2 isn’t great at patient queries.  Ready to be implemented, but there are very limited resources to do so.  FHIR may be better suited to this, we may want to move it there.  Are there any real customers for this yet?  VA is using Ioana’s work to manage implantables.  Not a lot of interest from CMI members yet, just higher priorities for now.
  
: 10:45 > Open PCD Technical Committee (TC)
+
: Vent (Paul Schluter)
:: TC Welcome and Agenda Review (Tom Kowalczyk)
+
: IDCO (Paul Schluter)
:: Announcement – Decision Making meeting (TC Co-Chairs)
+
: RTM (Paul Schluter)  
  
:: Proposal Updates -
 
::- Sterilizer (Paul)
 
:::  a bit more interest, some slow progress.
 
  
:* PCD Program review:
+
:- Standards Coordination, RTM and IEEE P11073-10101b draft standard  (Paul Schluter)
 +
:: Overview of where we are and process to begin “ballot group formation” for IEEE P11073-10101b
 +
:: IEEE 11073 SC & PARs & EMBS SC (mobile, IoT, AI/ML)
 +
::- Very good progress on 10101b.  Have captured a lot of what implementers want.  Infusion pumps was a big contributor.  Plan is to have rigorous models for everyone to build on.  Excellent progress with Dialysis terms as well.  New groups prefer tightly defined documents.  Could add a lot of bed terms if the vendors are interested.  Dialysis has asked for two items, he will drafted Cps to support it.  Need to provided status updates, Monroe found a term to add for data logging.  Want to add event codes in a PCD-01 message, mostly notifications (not alerts).  Will send out a ballot review group this August.  If you join, your input will matter a lot. 
 +
::- IDCO making excellent progress.  They hope for Jan 2020 NA CN, but definitely for the 2021 CN.
  
:: ACM (Rob W for Monroe P)
+
::- Should we have Technical Alert ‘severity’ codes? Some examples on the slideMonroe – not fan of ‘severity’
::- Slides will be on ftp site
 
::- CP to allow AR to provide supporting/alternate info. Quiet hospital work going well, no comment on this work, CP went to ballot.  ACM been on fatigue work sideline, recent work is addressing that.  Will add to glossary. Some work on ‘keep-alive’, needs moreDeprecating PCD-07 polling – not used, not really viable.  Worked with PALM for lab alerts.  Working on a message to pass LS info to other devices.  Reiterated need to auto test AC actors.  John will talk to Nicholas, also Michael Faughn may be able to put something together. 
 
::- Extensive discussion of the ‘keep-alive’ option.  Source of the message will be adjustable to fit the situation.  Need ability to ID and map equipment requirements to implementation and testing across whole domain.  What is train to ensure the whole path works and the message stays viable.  They’re still working on that, will likely involve ACM actor to focus message delivery.  Idea is that concept needs to be consistent, but may not need a new transaction.  Should not be ACM specific.  Could benefit as a HL7 wide message.  Will warrant further discussion.  This covers all discussion of ‘keep alive’ scheduled for later.  Tabled for now.
 
:: MEM DMC (Rob W for Monroe P)
 
::- Slides will be on ftp site
 
::- John G will send Hans a message in HL7 O&O to provide a unique trigger for PCD-16. 
 
:: MEM LS (Rob W for Monroe P)
 
::- Slides will be on ftp site
 
:: MEM RDC (Rob and Monroe)
 
::- Slides will be on ftp site
 
:: DEC (John R)
 
::-  Opportunity to provide new requests.
 
:: EC (John R)
 
::- Tabled, remove from list
 
:: IPEC (Al E, Jeff R)
 
::- No additional info.
 
:: PIV (Al E)
 
::- Two CPs underway.  Christophe;  What is required to get them ready to vote?  Complete them and send to Paul Sherman.  Won’t be ready for a vote today.
 
:: Pump (Al E, Jeff R.)
 
::- Remove from list.
 
:: DPI  (John R)
 
::-  Have a live example up as a subdomain.
 
:: Physio monitor (John R)
 
::- No update
 
:: PCIM (John R)
 
:- Needs an update
 
:: Vent, IDCO, RTM (Paul Schluter)
 
::- Slides will be on ftp site
 
::- Work on these topics handles terminology.  10101 work is going well.  Captured many devices and terms, vendors continue to contribute terms.  Cleaning up some synonyms.  Working on clinical procedure driven alert suppression.  Next steps – cleanup at RTM T-cons.  Have about 1100 event terms.  Able to set up method to access terms as needed.  Adding Several new parameters.
 
::  Quiet Hospital
 
::- What else to discuss?  Nothing.
 
  
:- Standards Coordination
+
:- Standards Coordination (Cont.)
:: IEEE 11073 SC & PARs & EMBS SC (mobile, IoT, AI/ML)
+
: : Dalibor - IEEE P1847 (RTLS) standard moving along, incorporated MEMLS info.
 
:: HL7
 
:: HL7
 +
::- Canceled May meetings, working on virtual meetings.  IEEE POC group may also meet virtually.
 
:: Devices on FHIR  
 
:: Devices on FHIR  
::- Is there any more to say on this?  Project to create next iteration with guidance info and SDC.  Related to collaborative HIH and FHIR grantMay help pay for tooling upgrades.
+
::- Two successfully implemented guides, PHD and POC.  PHD is close to publication.  Meet every week. Working to incorporate SDC into Point of Care documentation.  Adjusting POC Device to reflect tech advancesRecognizing HL7/IHE skirmishes, the Gemini projects hope to address it.  Todd pitched Devices on FHIR and POC as a project, was well received.
 +
 
 +
:* PCD Program review (cont):
 +
::  Quiet Hospital   Note – Check recording until 8:13)
 +
 
 +
::- Tom … Logistics for demo is a bit challenging.  It’s VERY well staged with back story, etc.  Rob – it would be good to use this year’s use cases for next year’s HIMSS.
  
:: The IHE-PCD Test Tools, IEEE-11073 Nomenclature (-10101), Domain Information Model (-10201), and HL7 message validation – an overview and discussion on NIST’s integration efforts and everything in between.  (John Garguilo, Michael Faughn)
 
::- Status update, slides are on ftp site. 
 
::- Extensive review ‘’(Check recording from 15-35 mins)’’
 
::- Michael Faughn updated on tooling.  If we have any questions, contact John, Michael or Nich.
 
:: - This link contains most info you’d want to look at for this topic:
 
::: https://confluence.hl7.org/display/HCD/Health+Care+Devices
 
  
 
: TC Action item review
 
: TC Action item review
 +
 
:* [[http://wiki.ihe.net/index.php?title=PCD_Technical_Committee_Action_Items TC Action items]]  
 
:* [[http://wiki.ihe.net/index.php?title=PCD_Technical_Committee_Action_Items TC Action items]]  
 +
 
:: 196  Add PCD specific values to HL7 table 78
 
:: 196  Add PCD specific values to HL7 table 78
::- John needs to formally request this, a rigid processSet to February 2020.
+
::- Not much of an update right now.  Ted Klein and John’s group hope to submit changesMove to end of May
 
:: 200  MDS and VMD Requirements  
 
:: 200  MDS and VMD Requirements  
::- Mostly done, Michael talked about a lot of it todayIn process.   Review next F2F.
+
::- Containment modeling important, can resolve problems, especially during Connectathon.  Asking those that need terms to create containment models.  This limits the need for inspecting messages by hand, as computers are much better at it.  He, Michael, and Brian are working on consistent output data as well.  NIST is working with CDC on a similar issues regarding COVID-19 tracking.  Inconsistent data quality is an issue for them as wellJohn G – Nicholas will have some info that will help later during F2F. Move to next F2F.
 
:: 201  Pump utilization – publicizing
 
:: 201  Pump utilization – publicizing
::- No new info, move to joint PC/TC in January
+
::- IEEE 1847 will help this effort.  Due to schedule conflict, Paul didn’t submit to MDExpo April.  Move to May TC.
 
:: 202  MEMDMC CP to make PID and PV1 segments optional
 
:: 202  MEMDMC CP to make PID and PV1 segments optional
::- Covered earlier, in process, awaiting reply from O&O.  Review in December.
+
::- Once triggers are officially committed by HL7, they can implement it.  Monroe isn’t sure should be actually owner of this.  John Rhoads talks to O&O a lotThey have a lot to do with limited resourcesHe will take ownership.  Move to next F2F.
:: 204 Gazelle and Proxy and NIST Tool improvements
 
::- How do we get Eric’s attention? If no luck by December, close and repeat.  Move to December.
 
  
: ACM profile mapping of PCD-04/PCD-07 content into PCD-05 content (Monroe)
+
:* 10:45 > Containment modeling  (Paul Schluter)
:* 05 in for a long time, removed for FTMember wanted it back in, CP re-inserted it.  Produced a gap document, ACM will be working addressing those gapsA couple of AMs are implementing it, need three to validate it at CNWant to get a minimal version for CN/ShowcaseNot in NIST tool, work with notes for this cycle, then look at getting it into the toolsWith 2 AMs and no tools, will be a hodgepodge, will it get past Phil and Bronwen for the Showcase.
+
:: Containment models play an essential role for our work, want to emulate physical devices as much as possible.  Models device subsystems very well.  Not fully embraced for rigorous validation.  Need solid models.  PCD is a leader, but we still have a ways to go.
 +
:: Key items needed for more rigorous message definition and validation, focusing on containment trees and essential next steps to improve IHE PCD DEC HL7 V2 message conformance testing.
 +
:: He worked with a group that hadn’t heard of IHE, but are a good fit with what we do. 
 +
::  The group worked on an easily shareable model (Engineers, clinicians, even marketing).  Though simple, it’s unambiguous.  Helps drive NIST test tools.  Showed and described containment model, the Dialysis group found it very usefulPaul reviewed how the Dialysis group used the model.  Messages are insensitive to sibling node order.  Order doesn’t matter, this helps speed up testingMany of the fields and models are used in other devices, which makes this process very portable.  Discussed event models they used, able to consider all events at the same timeThe group plans to adopt the HL7v2 ‘Batch’ term to consolidate all events in a sessionMany ways to ‘skin this cat’, this was one that worked very wellWant to adopt 1-2 models, make sure we don’t splinter our efforts.  Will delve into more issues, such as cardinality and containment.
  
: '''F2F Action Review (from this week)'''
+
Continued topic discussions
  
:: ''' Joint POCD/ PHD '''
+
:: RTMMS update given by NIST contractor Michael Faughn
::- Create Joint domain-wide coordination committees: Joint Planning Committee, Joint Technical Committee, Domain Coordination Committee
+
::- Building out Ver. 2.  Migrating existing terms into new framework, then other terms from Word docs into the framework.  Will then ask us to ‘test drive’ the new framework.  He demonstrated the framework, searching terms, units, etc.  Want feedback – what other things do we want out of the web application?  Please let him know.  Plan to build up to be more useful.  Will generalize Brian’s pump work for other devices.
::- PHC and SDPi appoint joint PC and TC representatives
+
::- Can you tag a metric in a search?  Yes, just not exposed right now.  Would take an hour or so if the tags are applied.
 +
::- Hope to get to the Profiling tool by this fall.
 +
::- One nice extension – show enumerated values and units.  It does that now, just not pretty right now.
 +
 
 +
::Conformance Tools/IGAMT (John G and Nicholas)
 +
::- John showed their Resource Portal.  Wanted to show look and feel of tools.  IGAMT lets subject matter experts create the messages and Profiles.  IGAMT is at the forefront of this.  Nicholas has incorporated our Profiles into IGAMT.  Working on IGAMT2, has some power users, they’ll recruit some more soon (Al E?). 
 +
::- Nicholas demonstrated IGAMT.  Not populated with PCD yet. More powerful, should be tool used in the future.  If interested in being a beta user, let them know.  Suggest a lead from each working group.  Open registration right now.  It has most of the existing message structure.  Has built in structure for Implementation Guides.  HL7 is looking at adopting this and requiring their users to follow this process.  Can mix and match from different HL7v2 versions.  We will be able add some segments ourselves.  Now able to generate TF ready performance requirement documentation. 
 +
::- There’s a lot more functionality, gives the SME a thorough toolbox.  Nicholas will create first version of our Profiles, we can then come in and modify as desired.  Can develop sophisticated test cases, even down to make and model to help with development.
 +
::- How do you overlay this onto a containment tree?  Can build it into the conformance rules. 
 +
 
 +
 
 +
: F2F Action Review (from this week)
  
 
:: '''PC'''
 
:: '''PC'''
::- Quiet Hospital
+
 
::: Marketing – Prep marketing documentation and Showcase speaking points.
+
: Close existing PC Action items and roll them into a DEV Tiger Team Action Item
::: HIMSS session approved (Todd), AAMI session proposed (Paul Sherman)
+
: Create DEV Action Item on creating a process to add a sponsor to a Domain.
::- Motion:  Start a DEC CP to include an option for HL7 FHIR transport.  John Rhoads seconds.  Discussion – Another appendix, make sure they are not interoperable.  10 approve, 5 abstain.  Passes.
 
::- Determine 2020 Milestone dates -  DEV Joint Planning Committee
 
::- Five year plan review and update - -  DEV Joint Planning Committee
 
  
  
 
:: '''PC&TC'''
 
:: '''PC&TC'''
:: IHE DEV - DPI Subdomain Launch
+
::
::- Motion – Publish White Paper:  9 in favor, 2 abstain, passed
+
:* Cochair Action item - 106 - Activities Promoting PCD.
::- Motion – Approve developing SDPi supplement as proposed in white paper:  9 in favor, 2 abstain, passed
+
:: Close, refer to Tiger Team and start as a DEV Action Item.
:::  SPDi Sub-Domain will work on these.
+
 
:: Confirm availability of Mayo Jacksonville for DEV F2F meetings in April – Rob
+
:* Fall F2F
::- Check with PCH on their availability the week of April 13 or April 20.
+
:: DEV decision refer to Tiger Team
:: POU Supplement
 
::- Need to take the same approach for SPDi and PHD, as a full Domain method.  This should be pursued in DEV Domain wide context, especially harmonizing PHD and POCD devices.  POCD volunteers will work with PHD group to finalize this.
 
::- Officially add OR.net as an IHE Devices domain co-sponsor (Todd)
 
::- SDPi profile development (Todd / Ken / Stefan to lead)
 
  
  
 
:: '''TC'''
 
:: '''TC'''
::  Pump CPs from Chistophe to Paul to prep for vote.
+
::
 +
::  No Follow-up action for TC, most relevant are at DEV level.
  
:: '''POCD Cochairs'''
 
::-  Cochair Action item - 106 - Activities Promoting PCD.
 
  
 
+
TC Meeting Wrap up and Adjournment (Kowalczyk)
:* Joint POCD/PCH wrap up.
 
:: Thom Erickson will arrange a meeting to review this week's discussions.
 
 
 
 
 
:* > TC Meeting Wrap up and Adjournment (Kowalczyk)
 
  
  
Line 1,013: Line 957:
 
The Action Items that follow and approved in subsequent committee meetings will be added to the committee Action Item page.
 
The Action Items that follow and approved in subsequent committee meetings will be added to the committee Action Item page.
  
: No new Action Items
+
:
  
 
== Action Items - TC and WGs ==
 
== Action Items - TC and WGs ==
 
The Action Items that follow and approved in subsequent committee meetings will be added to the committee Action Item page.
 
The Action Items that follow and approved in subsequent committee meetings will be added to the committee Action Item page.
  
:  MEMDMC profile to change via CP to use a message template of ORU_R(as allocated by ONO) which affords it the ability to make the usage of the PID and PV1 segments as optional for MEMDMC use cases.  If PID and/or PV1 segments are present they should be populated per the IHE PCD TF.  We did this with ACM, so should be able to do so in MEM.
+
== Next Meetings ==
 
 
:  Validation tool error related to CWE-23.
 
 
 
:  Gazelle and Proxy and NIST Tool improvements.
 
  
== Next Meetings ==
+
Technical Committee: [[PCD TC 2020-05-06 Webex]]
  
Technical Committee: [[PCD TC 2019-11-06 Webex]]
+
Planning Committee: [[PCD PC 2020-05-13 Webex]]
  
Planning Committee: [[PCD PC 2019-11-13 Webex]]
+
Joint Planning and Technical Committee: [[PCD PC&TC 2020-04-29 Webex]]
  
Joint Planning and Technical Committee: [[PCD PC&TC 2019-10-23 Webex]], [[PCD PC&TC 2019-11-20 Webex]]
 
  
<!--
 
 
[[Patient Care Device | PCD Home]]
 
[[Patient Care Device | PCD Home]]
  
[[Category:PCD Meeting]]
+
[[Category:DEV Meeting Archive 2020]]
 +
[[Category:PCD Meeting Archive 2020]]

Latest revision as of 17:01, 18 October 2021

PCD Home


Please NOTE: Agenda created March 16 - still being edited.

Michael J. Kirwan, DEV TPM

Meeting Objectives

These face-to-face meetings have a number of objectives depending on the committees involved:
  • Planning Committee: Review, plan and initiate PCD activities; contribute to planning of the HIMSS Interoperability Showcase and other Showcases and events; recruit vendors and users.
  • Technical Committee: Review and adopt brief profile proposals; Adjourn Joint PC&TC meeting. contribute to Connectathon test tools, tests, and procedures.


Location & General Schedule

Location:
- Virtual via Webex


Dates
- To assist European participants, all meetings will be morning meetings, with a meeting on Friday.
the times will be 9AM EDT - 1PM EDT
Tuesday April 21: Pump Working Group
Wednesday April 22: Joint PCD/PCHA meeting, PCD Planning Committee, PCH Meeting
Thursday, April 23: PCD Planning and Technical Committees, PCH Meeting
Friday, April 24: PCD Technical Committee
The schedule is proposed; actual meeting times may change during the week.
Daily Schedule - All times Eastern Daylight Time (US)
  • 09:00 - 11:15 Session #1
  • 11:30 - 14:00 Session #2

Agenda Suggestions

Please submit suggestions for agenda topics here or through emails to the committee co-chairs.

From the PC Action Items PCD Planning Committee Action Items:

172 DEV Domain Implementation
173 Update TF for DEV Domain

From the TC Action Items: PCD Technical Committee Action Items:

196 Add PCD specific values to HL7 table 78
200 MDS and VMD Requirements
201 Pump utilization - publicizing
202 MEMDMC CP to make PID and PV1 segments optional

Webex Support

Because of COVID-19, these meetings will be held via Webex. The links will are provided below.

Reminders: the IP agreement is in force, and participation counts toward voting rights.

Please note: the log in and phone number for each meeting is the same as for our WG meetings. The password is included in the email sent to participants. These are not provided here for security reasons (this is a public Wiki page).

The HIMSS Webex page is [HIMSS Webex]

PCD Meetings
- Tuesday, April 21: Pump WG: Meeting Number: 922 682 629
- Wednesday April 22: DEV joint and PC: Meeting Number: 922 036 096
- Thursday April 23: Joint PC&TC and TC: Meeting Number: 921 597 565
- Friday, April 24: TC: Meeting Number: 929 476 319
PCH Meetings:
- Wednesday morning, April 22: Meeting Number:
- Thursday morning April 23: Meeting Number:
- Friday morning, April 24: Meeting Number:

Attachments / Materials

Documents related to the meeting when available will be found at the [New Devices Google Drive] unless otherwise noted. Documents are available without a password.

Schedule/Deadlines: Patient Care Device and Domain Milestones

PCD PC Action Items PCD Planning Committee Action Items. Significant changes, other than dates, will be in bold.

PCD TC Action Items PCD Technical Committee Action Items. Significant changes, other than dates, will be in bold.

Detailed Schedule & Agenda

Tuesday, April 21 (Pump Workgroup)

Date Hours Committees Topics


Tuesday 09:00 - 2:00 Pump workgroup
  • Morning (09:00-2:00)
  • 9:15
MEMDMC terms for pumps - 30 min
2020-02-24.DMC.1d.2020-03-30T16.IPv4-IPv6.xls
https://drive.google.com/open?id=1DTGH766Q5dOoeL2kM3JRjbjkH9KE9Gup
MEMDMC Battery status - 30 min
2020-02-24.DMC.1d.2020-03-30T16.IPv4-IPv6.xls
https://drive.google.com/open?id=1DTGH766Q5dOoeL2kM3JRjbjkH9KE9Gup
Bolus from existing Infusion - 30 min
  • Break (10:55-11:05)
Pump Terms containment model update - 1.5hr
  • Break (12:10-12:30)
Pump alert/alarm events - 30 min
ACM state changes - 30 min
Mapping of detailed pump events to broader 11073 terms - 30 min
  • 2:00 > Meeting Adjournment

Wednesday April 22, 2020

Date Hours Committees Topics


Wednesday Pt. 1 09:00 - 11:15 Joint IHE Devices Meeting
  • 09:00 > IHE IP Management Process (Kurt)
  • 09:05 > Introductions and Agenda Review (Kurt and Thom)
  • 09:20 > Welcome (15 minutes)
  • 10:35 > Subdomain Reports (20 minutes each)
PCD
PCH
DPI
  • 10:35 > DEV Domain Guidance and AOB (15 minutes)
Feedback from Kevin O'Donnell
IEEE P2733 Overview
Move future DEV meeting to end of F2F?
  • 10:50 > Next steps and wrap up
  • 11:00 > Adjourn Joint DEV Meeting
Break 11:00 - 11:15 AM
Wednesday Pt. 2 11:15 AM - 2:00 PM PCD Planning Committee (PC)
  • 11:15 > Start PC meeting
  • Introduction
- IHE IP Management Process (5 minutes)(Kurt)
- Review & Approve PC Agenda (Kurt)
General PCD Work Program Review (statuses, plans only, details during TC sessions):
- ACM (Rob W for Monroe P)
- MEM DMC (Rob W for Monroe P)
- MEM LS (Rob W for Monroe P)
- WCM (Paul Schluter)
- IDCO (Paul Schluter)
- RTM (Paul Schluter)
- Vent (Paul Schluter)
- PIV (Jeff R)
- Pump (Kurt, Jeff R.)
- IPEC (Kurt)
- PCIM (John R)
- Physio monitor (John R)
- DEC
  • General update PCD TF) (John R)
  • DEC OPTION: FHIR (Todd C)
- EC (John R)
- DCM Pulse Oximetry
Currently waiting for someone to take it to FT.
- Review current Action Item: PCD Planning Committee Action Items:
172 DEV Domain Implementation
173 Update TF for DEV Domain
2:00 > Adjourn Planning Committee meeting


Thursday April 23, 2020

Quarter Time Lead Agenda Items
Thursday Pt. 1 09:00 - 11:15 AM
  • 09:00 > Joint PC/TC meeting
  • Introduction
- IHE IP Management Process (5 minutes)(Kurt)
- Review & Approve Joint PC&TC Agenda (Kurt)


  • IHE International Board - Update & Feedback (Todd)
  • Review 2020 Milestones - [1]
  • Five year plan
No current plan
- 2017 Roadmap
- and 2011 Plan Notes
  • Cochair Action item - 106 - Activities Promoting PCD.
  • Location, Dates of the DEV PCD 2020 Fall F2F

Adjourn Joint PC&TC meeting.

Break 11:15 - 11:30 AM
Thursday Pt. 2 11:30 AM - 2:00 PM PCD Technical Committee (TC)
11:30 > Open PCD Technical Committee (TC)
TC Welcome and Agenda Review (Tom Kowalczyk)
Announcement – Decision Making meeting (TC Co-Chairs)
Proposals -


  • PCD Program review:
ACM (Rob W for Monroe P)
MEM DMC (Rob W for Monroe P)
MEM LS (Rob W for Monroe P)
DEC (John R)
EC (John R)
IPEC (Al E, Jeff R)
PIV (Al E)
Pump (Al E, Jeff R.)
DPI (John R)
Physio monitor (John R)
PCIM (John R)
Vent (Paul Schluter)
IDCO (Paul Schluter)
RTM (Paul Schluter)
Quiet Hospital
- Standards Coordination
IEEE 11073 SC & PARs & EMBS SC (mobile, IoT, AI/ML)
HL7
Devices on FHIR


Friday, April 24, 2020

Quarter Time Lead Agenda Items
Friday Pt. 1 09:00 - 11:15 AM
  • 09:00 > Continue TC Meeting
TC Action item review
196 Add PCD specific values to HL7 table 78
200 MDS and VMD Requirements
201 Pump utilization - publicizing
202 MEMDMC CP to make PID and PV1 segments optional
  • 09:45 > RTM and IEEE P11073-10101b draft standard (Paul Schluter)
Overview of where we are and process to begin “ballot group formation” for IEEE P11073-10101b
  • 10:45 > Containment modeling (Paul Schluter)
Key items needed for more rigorous message definition and validation, focusing on containment trees and essential next steps to improve IHE PCD DEC HL7 V2 message conformance testing.


Break 11:15 - 11:30 AM
Friday, Pt. 2 11:30 AM - 2:00 PM PCD Technical Committee (TC)
  • 11:30 > Continued topic discussions
RTMMS update given by NIST contractor Michael Faughn
F2F Action Review (from this week)
- DEV
Proposed agendas for Fall F2F
- If Virtual
Tuesday AM Pump WG
Wed AM PC and Joint PC/TC
Thurs AM TC
Friday AM Joint DEV
- If Live
Tuesday Pump WG
Wed AM PC and Joint PC/TC
Wed PM and Thurs AM TC
Thurs PM Joint DEV
PC
PC&TC
TC


  • > TC Meeting Wrap up and Adjournment (Kowalczyk)



Note: Time slot TBD: IDCO

Participants

Tuesday, April 21

Kurt Elliason(Smiths Medical), Al Engelbert (BBraun), Andrea Robertson (Smiths Medical), Bill Haralson(Smiths Medical), Brian Witkowski (BBraun), Christophe Fournier (Fresenius), Jeff Rinda (ICU Medical), Marufur Rahmen (ICU), Nathan Berg (Smiths Medical), Paul Schluter (CMI), Tom Kowalczyk (BBraun), Michael Faughn(Prometheus), Dalibor Pokrajac(GuardRFID), John Krupka


Wednesday, April 22 Todd Cooper, Kurt Elliason, Al Engelbert, Thom Erickson, Javier Espina, Michael Faughn, Christophe Fournier, Ken Fuchs, John Garguilo, Bill Harrelson, Dan Kernan, Tom Kowalczyk, Monroe Pattillo, Marufur Rahman, John Rhoads, Paul Schluter, Paul Sherman, Kumi Terai, Rob Wilder, Brian Witkowski


Thursday, April 23 Todd Cooper, Kurt Elliason, Al Engelbert, Thom Erickson, Javier Espina, Michael Faughn, Christophe Fournier, Ken Fuchs, John Garguilo, Bill Harrelson, Dan Kernan, Tom Kowalczyk, Monroe Pattillo, Marufur Rahman, John Rhoads, Paul Schluter, Paul Sherman, Kumi Terai, Rob Wilder, Brian Witkowski

Friday, April 24 Nicholas Crouzier, Kurt Elliason, Javier Espina, Michael Faughn, Christophe Fournier, Ken Fuchs, John Garguilo, Bill Harrelson, Dan Kernan, Tom Kowalczyk, Monroe Pattillo, Dalibor Pokrajac, Marufur Rahman, John Rhoads, Paul Schluter, Paul Sherman, Rob Wilder, Brian Witkowski

Discussion

Discussion Summaries do not require formal approval, while minutes of meetings where votes are taken do. Participants are encouraged to review and bring up significant issues with discussion summaries of previous meetings. Votes will be taken to approve meetings where votes took place; these may be email ballots.

Tuesday Pump WG Meeting

Item Topic Discussion
1 Introductions & Agenda Review
- Chair
Status/Discussion:
Reviewed IHE IP Management Process

Decisions/Issues:

Agenda approved

Action(s):

2 MEMDMC terms for pumps and MEMDMC Battery status
Status/Discussion:
Added MDS terms to VMD as optional if there multiple modules.
MDC_ATTR_ID_SOFT term needs to be checked. Looked in 10201 for definition.
From 10201 "Soft-Id. MDC_ATTR_ID_SOFT. OCTET STRING. Settable, e.g., hospital inventory number."
Discussion of battery terms, Dalibor expressed need for Low battery indication. We have terms for Battery charge level and time remaining. Also have events for battery low and depleted that could be used.


3 Bolus from existing Infusion
Status/Discussion:
Given Clinician Bolus (CH)
Need clarification on whether the ‘O’ on Bolus from existing infusion table should really be ‘X’
Should be 'O', since some EMR vendors always send TQ1.
Confirm: MDCX_INFUSION_PROGRAM_TYPE to be used to signify type, while RXG-15/16, TQ1, and MDC_FLOW_FLUID_PUMP to define values
Need clarification on what MDCX_INFUSION_PROGRAM_TYPE “continuous” is expected to be used for -- Need CP Should be OBX-3 with enumeration of "clinician dose"
Titration (XO)
Remove “not valid for PCA” means not valid for PCA device type, revisit in the future if it should be for PCA Basal rate only. Need input from EMR vendors. Typically a change to a PCA pump would be a new order.
Intermittent Bolus
Need these segments available for PCD-03
MDC_TIME_PD_DOSE_START_INTERVAL
MDCX_TIME_PROG_NEXT_DOSE
MDCX_TIME_REMAIN_NEXT_DOSE
Need clarification on whether “MDC_TIME_PD_PROG” is needed
defer to pump terms discussion later today


4 Pump Terms containment model update
Status/Discussion:
Brian working with a MongoDB. Created a pump MDS containment generator supports 01, 10, need to add 03. Could support others
could put it on a website so the group can review and comment


5 Pump alert/alarm events and Mapping of detailed pump events to broader 11073 terms
Status/Discussion:
Reviewed content of ListParSrcEvt.3o.x3u.2020-04-20T16.P3-expanded-displayText.xls
Targeting August to start ballot process
Would like description of infusion pump for standard. Dialysis has 8 page description
6 ACM state changes
Status/Discussion:
Need to make sure REFIDs work well with state machines


Action(s): See above

Wednesday Joint PCD/PCHA Meeting Summary

Item Topic Discussion
1 Introductions & Agenda Review
- Chair
Status/Discussion:
Kurt Elliason reviewed the IHE IP Management Process
Introductions and Agenda Review

Decisions/Issues:

Agenda approved

Action(s):

2 Discussion Summary or Approval of Minutes
- Chair
Status/Discussion:
DEV Domain Mar 25, 2020 DEV Joint 2020-03-25 Webex

Decisions/Issues:

Action(s):

3 Agenda Items
-
Status/Discussion:


  • 08:05 > Introductions and Agenda Review (Kurt and Thom)
  • Subdomain Reports
Presentations will be on the ftp site.
PCD -
- Many products using DEC profile. IPEC moved into FT. Provided summary of Profile’s progress. Discussing sterilizer Profile. 10101B – terms under review for update and balloting. Working a lot on Quiet Hospital, had planned demos at HIMSS2020. SDPi and Quiet Hospital groups merged, this is going very well. Looking for regulatory and clinical input. Discussed ECRI participation. MEM – looking at remote command/control. Will update our report for DEV – Need to meet and discuss how to proceed
PCH
- POU
TF published, wiki launched.
- Paul Sherman and Mary are working on DEV page redirects as needed.
- Working on Direct to Cloud operation, lightweight DIM.
- Reviewed Direct to Cloud; stack, simplified DIM and prototype protocol stack.
Simplified DIM: looking to simplify for personal health devices, could move beyond to D2C and Bluetooth LE. Hope to have best of both worlds. Currently under Board of Directors review. IEEE group discussed this on Monday, will want to review/change model title. Still looking at how to change it in official PAR. Will need to review and discuss further.
Mobile Health apps – Not yet launched and working on the charter. Looking to involve new participants (Apple, etc.)
- Test and Tools
Maintenance release in May, Gazelle integration complete. Some other items pending funding.
- Marcom review. Developed common message, feel free to use or share it. Wrote a number of blogs, ID markets, ID’d vendors to represent, collaborate with Global eHealth Consortium.. Discussed comms strategy. Discussed reporting this to Board.
DPI
- Rebranding HL7 to HL7 Device Workgroup. Balklot closes 4/26.
- Launched WP last April, finished Oct. Ken summarized history and flow. Question on using going forward, more of a living document.
- Reviewed ISO/IEEE 11073 SDC
- Reviewed/highlighted Use Cases. In process is Remote Monitoring during COVID-!9 response. (FDA initiated).
- SDPi Supplement – Developing 4 profiles, include TF 1, 2, and 3 material and testing at Korean CN. Profiles are Plug and Play, Repoorting, Alerting, External Control.
- Reviewed Supplement Developement. Will build on existing momentum, SDPi 1.0 foundation, work streams/teams, then white papers.
- Presented/recorded HIMSS presentation, will share link when it’s available.
- Proposed Joint Joint HL7-IHE Gemini Program. Deliverables – SDPi Supplement, HL7 DoF IG, and joint white papers. Goal – Leverage the resources to create deployable products that are regulatory compliant.
- Create a set of Collaboration Tooling.
- Question about Military/Disaster casualty care. How to decide where to evacuate to? That is part of this process, but not the main focus.
Link to [Saner Project] as discussed.
  • DEV Domain Guidance and AOB (15 minutes)
Feedback from Kevin O'Donnell
- He’s voiced some concerns on how we’re organizing,, but has no specific info on what we’re violating. Todd has asked for specifics, no response. He’ll ask again. Could be sour grapes or fear of change. We should proceed.
- Ballot – Create Tiger Team to address remaining items finalizing DEV structure. Passed unanimously. Todd will convene the group
IEEE P2733 Overview
- View unavailable, Ken reviewing verbally. Slides will be available. Group struggling to find its way forward.
Move future DEV meeting to end of F2F?
- Some discussion, will bear in mind
  • Next steps and wrap up
DEV Tiger Team – Todd will start that.

Adjourn Joint DEV Committee (PC)


Decisions/Issues:


Action(s):


Wednesday PC Meeting Summary

Item Topic Discussion
1 Introductions & Agenda Review
- Chair
Status/Discussion:
Kurt Elliason reviewed the IHE IP Management Process
Introductions and Agenda Review

Decisions/Issues:

Agenda approved

Action(s):

2 Discussion Summary or Approval of Minutes
- Chair
Status/Discussion:
Minutes approved

Decisions/Issues:

Action(s):

3 Agenda Items
-
Status/Discussion:
General PCD Work Program Review (statuses, plans only, details during TC sessions):
- ACM (Rob W for Monroe P)
Current status; In FT, 19 vendors at Connectathon, Showcase cancelled.
Quiet Hospital and SPDi merged, 34 members 10 organizations.
Lab results and Rad Workflow pushed to 2021
- MEM DMC (Rob W for Monroe P)
TI, in Connectatrhons No updates planned this cycle
- MEM LS (Rob W for Monroe P)
TI, in Connectatrhons No updates planned this cycle
- RDC – still out there. Not much work, but white paper is available.
- WCM (Paul Schluter)
Not a lot of news, vendors have implemented. Nomenclature will be able to support vent info.
- IDCO (Paul Schluter)
Meeting each Friday and updating. Working with Heart Rhythm Society EMR vendors. Hope to be at Connectathon, will work with Paul Sherman to prep.
- RTM (Paul Schluter)
Summary, more detail at TC. Significant 10101b update, everything not in gray will have codes. Asked vendors to supply event strings. Three vendors contributed so far, helpful info. Working with Dialysis vendors to get terms into 10101b. Formalized MEM DMC terms. Nurse call and beds are moving along, but not ready to add to the list.
10101b – Talked to IEEE Steering Committee and staff. Hope to have ballot ready late August. Hope we can join and participate. An invitation will go out late summer, please join.
- Vent (Paul Schluter) – Keep adding terms, hoping to get more and add them to the terms.
- PIV (Kurt, for Jeff R) – Not a lot going on. Have some minor tweaks due. 1 or 2 CPs
- Pump (Kurt, Jeff R.) - A lot of MEMDMC terms, most not pump specific. Collecting a lot of alarm events, some specific ones.
- IPEC (Kurt) – Final Text, in Technical Framework. Can work on other Profiles.
- PCIM (John R) – On hold, limited resources right now. Discussing, possible that HL7 v2 won’t quite address needs. FHIR may be a better fit. Some work by Ioana, but doesn’t quite fit our needs.
- Physio monitor (John R) – Continual flow of input capabilities, managed in terminology management. Will want to look at it as we rethink TF organization. May want to enrich physio monitoring terms.
- DEC
  • General update PCD TF) (John R) – Pretty stable, new capabilities pretty well covered. Exercised well in Connectathons.
  • DEC OPTION: FHIR (Todd C) – A lot of advances, in good position to leverage that work into FHIR implementation. Planning Korean Connectathon, will work with them for a CP to implement it. Not a lot of work, will be able to claim FHIR implementation across whole Domain.
- EC (John R) - ‘Parent’ of IPEC.
- DCM Pulse Oximetry
Currently waiting for someone to take it to FT. Needs formatting. Developers don’t wish to move it into FT. John is willing to help when he has the time.
- Review current Action Item: PCD Planning Committee Action Items:
172 DEV Domain Implementation
- Close this and create an Action Item for PCD Coordination with the Tiger Team. Let Todd know of any questions. Report at next DEV meeting.
173 Update TF for DEV Domain
- Close this and create an Action Item for PCD Coordination with the Tiger Team. Let Todd know of any questions. Report at next DEV meeting.
Further topics Todd)
- Virtual Connectathons – Is the PC part of this discussion? We haven’t discussed it. Would be very challenging. Gazelle is the easiest parts. Theoretically could use a 4G router to divorce from corporate IT limitations. Epic has a HIMSS system separate from their own regular systems.
- How to officially add a sponsor to an existing Domain. IHE has no process separate from Domain creation. Domain management should have a way to vet sponsors. Make this a Domain Action Item.


Adjourn PCD Planning Committee (PC)


Decisions/Issues:


Action(s):

Close existing PC Action items and roll them into a DEV Tiger Team Action Item
Create DEV Action Item on creating a process to add a sponsor to a Domain.


Thursday Joint PC&TC Meeting Summary

Item Topic Discussion
1 Introductions & Agenda Review
- Chair
Status/Discussion:
IHE IP Management Process

Action(s):

2 Discussion Summary
- Chair
Status/Discussion:
-

Decisions/Issues:

Action(s):

3 Agenda Items
-
Status/Discussion:
  • IHE International Board - Update & Feedback (Todd)
Good handle on the programs. Unsure is to know how IHE supports member organizations.
Membership – about 180, steady and growing a bit. The paid membership seems to be working.
Funding – Down a bit. Affects document staff.
Global ehealth Consortium – Started in January, expected announcement at HIMSS. Goal is to clarify interoperability. Still very early in the process. Real world impact; For us, pretty clear, outside of IHE, still needs fleshing out.
Covid-19 – Have a page and press release stating what we’ve been doing.
Global support – WHO deployment, World summit, deployment committees
Testing and Tools – Connectathon, Connectathon seal, certification. Also looks at tools, especially looking at virtualizing Connectathons and consistent testing.
- Question – See these announcements, but customers may not see value. It takes many years, and they don’t see the long view. How do we keep them interested? Trying to get the message out to those that decide to implement or purchase systems.
- Membership Value/Challenges – Transitioned from Steve Moore for CN support to IHE Europe. How to effectively manage virtualization.
- Is the message getting out well enough? Generally, so far. Is the Product Registry valuable? Somewhat, but not hugely. Good to point to for reference, But it’s not comprehensive and accurate. Our Commercially Available list is more useful. The Connectathon Results page helps. Don’t know how to increase viability of the Registry. Extensive discussion of how to make it more useful. Where do customers come up with requirements? Unsure. Definite uptick in IHE requirements by customers.

(left 8:50 for IDCO help)

- (back 9:07) Tiger Team - Reviewed Domain Page, discussed framework and internal operations. Other big pieces for our ‘top 10’ list.
  • Review 2019 Milestones - [2]
Ken – Seems compressed. Discussed timelines, resolved concerns.
  • Five year plan
No current plan
- 2017 Roadmap
- and 2011 Plan Notes
Architecture – Revamp Vol 1 to reflect new structure of Devices.
DEC – Tested PCD-05 at 2020 CN. Add FHIR option (Todd).
ACM – add PCD-07 (Tom K). Is PCD-06 affected at all? Anyone remember the ePHI ? Smart Alarms – Leave for now, but is likely will be absorbed into Quiet Hospital.
Device Context Management – PCIM will be addressed in Dpi
Point of Care – Should this move into DPi? Likely, will need to triage.
Quality – Will be a proposal coming soon from DPi White Paper this cycle. SESMDI – Safe, Effective and Secure Medical Device Interoperability.
IEC 60601
  • Cochair Action item - 106 - Activities Promoting PCD.
Close, refer to Tiger Team and start as a DEV Action Item.
  • Location, Dates of the DEV PCD 2020 Fall F2F
Unlikely to get to a hospital by the next meeting.
Hotels may be desperate for our business.
Dates – Oct 6, Sept 29, Sept 16
HIMSS event Sept 16-19 in San Francisco.
Could set up close to a provider at a hotel.
September may be challenging for international members.
Bring up with Tiger Team.
We have enough to start.


Joint PC&TC Meeting Adjourned


Decisions/Issues:

Action(s):

  • Cochair Action item - 106 - Activities Promoting PCD.
Close, refer to Tiger Team and start as a DEV Action Item.
  • Fall F2F
DEV decision refer to Tiger Team



Thursday/Friday TC Meeting Summary

Action(s):
Item Topic Discussion
1 Introductions & Agenda Review
- Chair
Status/Discussion:

Decisions/Issues:

Agenda approved
IHE IP Management Process
Announcements –
- Decision Making meeting (TC Co-Chairs)


Action(s):

2 Discussion Summary
- Chair
Status/Discussion:
-

Decisions/Issues:

Action(s):

3 Agenda Items
-
Status/Discussion:

PCD Program review:

ACM (Rob W for Monroe P)
- Many CPs last cycle and some term clarification for SDC/ACM
- Three CPs in queue for this cycle, including one to support Quiet Hospital
- Working with other Domains on some Quiet Hospital actions.
- Pushed out – Add documentation for PCD-06 WCTP XML element.
- Concerns about test consistency at Connectathons, esp with XML and WCTP.
- Keep-alive – Applies to all Profiles, achieved via optional transactions. Discussion over managing the noise level; creating a new transaction vs. leaving it. The concern is adding ‘noise’ to the network. Explained how the process works.
MEM DMC (Rob W for Monroe P)
- CMI did some ACK work, will incorporate.
- NEED non-PID/PV1 message templates.
MEM LS (Rob W for Monroe P)
- Need additional PL data type clarifications. Need some codes – pretty much done. MDS and VMD also in Paul Schluter’s list. Pretty much done, Paul will send list to Dalibor.
DEC (John R)
- Pretty mature, well used. Can discuss MDC/VMD structure later.
EC (John R)
- Somewhat Proto-Profile, could address more than IPEC. Alarm/Alert closely related. Slides highlight this process and use. Can build on mature work done for IPEC. Discussed how to generalize. There is an event professional group with useful information we could incorporate. What’s a good path forward. Unsure, but if we do, we need to be careful to use common processes. Can be a form of clinical decision support. The equipment is pretty sophisticated, it can do a lot of it, a challenge would be getting clinicians to support this vs. using what they have. Is there a client for this?
IPEC (Al E, Tom)
- In FT, depending on terms updates.
PIV (Brian WAl E)
- Progress on programming a bolus and syringe pumps.
Pump (Al E, Jeff R.)
- Trying to get the new terms and visual representation of contianment model. In a good spot to get things done before the next F2F
DPI (John R)
- Brand new world. Meetings going on for a long time. Now have a new set of DPI and SDC standards, will hear a lot more. Stay tuned at relevant meetings.
Physio monitor (John R)
- What to do with Volume 3 in Profiles. It’s been dormant for a while. Good time to look at Vol. 3 again and what we want it to do for us. Basic maps are in there for basic models, could be a lot more. A good item to discuss at the DEV Domain level. What do implementers want? Thoughts? Can use Michael Faughn’s work to move forward (MS Word document not useful), let implementers to focus on what’s important to them, especially a computational document to build a model. Michael is about to send out a document for this type of a model. Is this Vol 3 only or does it affect the other volumes? Vol 1 is very public facing, not detailed. Vol 2 needs to be improved as a learning tool, grown a bit haphazardly, takes a lot of work to find specific content. Instead of V 2a, 2b, 2c, have them separated into DPi, PCD and PCD. Word can be used, with proper templates (legal uses them). Would need instructions to do this. A good item for the Tiger Team.
PCIM (John R)
- 80001 has some templates to manage the risk. Have found we can’t rely on patient data admin packages. Need human verification. HL7 v2 isn’t great at patient queries. Ready to be implemented, but there are very limited resources to do so. FHIR may be better suited to this, we may want to move it there. Are there any real customers for this yet? VA is using Ioana’s work to manage implantables. Not a lot of interest from CMI members yet, just higher priorities for now.
Vent (Paul Schluter)
IDCO (Paul Schluter)
RTM (Paul Schluter)


- Standards Coordination, RTM and IEEE P11073-10101b draft standard (Paul Schluter)
Overview of where we are and process to begin “ballot group formation” for IEEE P11073-10101b
IEEE 11073 SC & PARs & EMBS SC (mobile, IoT, AI/ML)
- Very good progress on 10101b. Have captured a lot of what implementers want. Infusion pumps was a big contributor. Plan is to have rigorous models for everyone to build on. Excellent progress with Dialysis terms as well. New groups prefer tightly defined documents. Could add a lot of bed terms if the vendors are interested. Dialysis has asked for two items, he will drafted Cps to support it. Need to provided status updates, Monroe found a term to add for data logging. Want to add event codes in a PCD-01 message, mostly notifications (not alerts). Will send out a ballot review group this August. If you join, your input will matter a lot.
- IDCO making excellent progress. They hope for Jan 2020 NA CN, but definitely for the 2021 CN.
- Should we have Technical Alert ‘severity’ codes? Some examples on the slide. Monroe – not fan of ‘severity’
- Standards Coordination (Cont.)
: Dalibor - IEEE P1847 (RTLS) standard moving along, incorporated MEMLS info.
HL7
- Canceled May meetings, working on virtual meetings. IEEE POC group may also meet virtually.
Devices on FHIR
- Two successfully implemented guides, PHD and POC. PHD is close to publication. Meet every week. Working to incorporate SDC into Point of Care documentation. Adjusting POC Device to reflect tech advances. Recognizing HL7/IHE skirmishes, the Gemini projects hope to address it. Todd pitched Devices on FHIR and POC as a project, was well received.
  • PCD Program review (cont):
Quiet Hospital Note – Check recording until 8:13)
- Tom … Logistics for demo is a bit challenging. It’s VERY well staged with back story, etc. Rob – it would be good to use this year’s use cases for next year’s HIMSS.


TC Action item review
196 Add PCD specific values to HL7 table 78
- Not much of an update right now. Ted Klein and John’s group hope to submit changes. Move to end of May
200 MDS and VMD Requirements
- Containment modeling important, can resolve problems, especially during Connectathon. Asking those that need terms to create containment models. This limits the need for inspecting messages by hand, as computers are much better at it. He, Michael, and Brian are working on consistent output data as well. NIST is working with CDC on a similar issues regarding COVID-19 tracking. Inconsistent data quality is an issue for them as well. John G – Nicholas will have some info that will help later during F2F. Move to next F2F.
201 Pump utilization – publicizing
- IEEE 1847 will help this effort. Due to schedule conflict, Paul didn’t submit to MDExpo April. Move to May TC.
202 MEMDMC CP to make PID and PV1 segments optional
- Once triggers are officially committed by HL7, they can implement it. Monroe isn’t sure should be actually owner of this. John Rhoads talks to O&O a lot. They have a lot to do with limited resources. He will take ownership. Move to next F2F.
  • 10:45 > Containment modeling (Paul Schluter)
Containment models play an essential role for our work, want to emulate physical devices as much as possible. Models device subsystems very well. Not fully embraced for rigorous validation. Need solid models. PCD is a leader, but we still have a ways to go.
Key items needed for more rigorous message definition and validation, focusing on containment trees and essential next steps to improve IHE PCD DEC HL7 V2 message conformance testing.
He worked with a group that hadn’t heard of IHE, but are a good fit with what we do.
The group worked on an easily shareable model (Engineers, clinicians, even marketing). Though simple, it’s unambiguous. Helps drive NIST test tools. Showed and described containment model, the Dialysis group found it very useful. Paul reviewed how the Dialysis group used the model. Messages are insensitive to sibling node order. Order doesn’t matter, this helps speed up testing. Many of the fields and models are used in other devices, which makes this process very portable. Discussed event models they used, able to consider all events at the same time. The group plans to adopt the HL7v2 ‘Batch’ term to consolidate all events in a session. Many ways to ‘skin this cat’, this was one that worked very well. Want to adopt 1-2 models, make sure we don’t splinter our efforts. Will delve into more issues, such as cardinality and containment.

Continued topic discussions

RTMMS update given by NIST contractor Michael Faughn
- Building out Ver. 2. Migrating existing terms into new framework, then other terms from Word docs into the framework. Will then ask us to ‘test drive’ the new framework. He demonstrated the framework, searching terms, units, etc. Want feedback – what other things do we want out of the web application? Please let him know. Plan to build up to be more useful. Will generalize Brian’s pump work for other devices.
- Can you tag a metric in a search? Yes, just not exposed right now. Would take an hour or so if the tags are applied.
- Hope to get to the Profiling tool by this fall.
- One nice extension – show enumerated values and units. It does that now, just not pretty right now.
Conformance Tools/IGAMT (John G and Nicholas)
- John showed their Resource Portal. Wanted to show look and feel of tools. IGAMT lets subject matter experts create the messages and Profiles. IGAMT is at the forefront of this. Nicholas has incorporated our Profiles into IGAMT. Working on IGAMT2, has some power users, they’ll recruit some more soon (Al E?).
- Nicholas demonstrated IGAMT. Not populated with PCD yet. More powerful, should be tool used in the future. If interested in being a beta user, let them know. Suggest a lead from each working group. Open registration right now. It has most of the existing message structure. Has built in structure for Implementation Guides. HL7 is looking at adopting this and requiring their users to follow this process. Can mix and match from different HL7v2 versions. We will be able add some segments ourselves. Now able to generate TF ready performance requirement documentation.
- There’s a lot more functionality, gives the SME a thorough toolbox. Nicholas will create first version of our Profiles, we can then come in and modify as desired. Can develop sophisticated test cases, even down to make and model to help with development.
- How do you overlay this onto a containment tree? Can build it into the conformance rules.


F2F Action Review (from this week)
PC
Close existing PC Action items and roll them into a DEV Tiger Team Action Item
Create DEV Action Item on creating a process to add a sponsor to a Domain.


PC&TC
  • Cochair Action item - 106 - Activities Promoting PCD.
Close, refer to Tiger Team and start as a DEV Action Item.
  • Fall F2F
DEV decision refer to Tiger Team


TC
No Follow-up action for TC, most relevant are at DEV level.


TC Meeting Wrap up and Adjournment (Kowalczyk)


TC Meeting Adjourned


Decisions/Issues:


Action Items - PC

The Action Items that follow and approved in subsequent committee meetings will be added to the committee Action Item page.

Action Items - TC and WGs

The Action Items that follow and approved in subsequent committee meetings will be added to the committee Action Item page.

Next Meetings

Technical Committee: PCD TC 2020-05-06 Webex

Planning Committee: PCD PC 2020-05-13 Webex

Joint Planning and Technical Committee: PCD PC&TC 2020-04-29 Webex


PCD Home