Difference between revisions of "Connectathon Using Gazelle Test Tools"

From IHE Wiki
Jump to navigation Jump to search
(Created page with "The Gazelle Test Tools cover a number of different areas. The Kereval team describes the tools and uses on [https://gazelle.ihe.net/content/gazelle-user-guides this page].")
 
Line 1: Line 1:
 
The Gazelle Test Tools cover a number of different areas. The Kereval team describes the tools and uses on [https://gazelle.ihe.net/content/gazelle-user-guides this page].
 
The Gazelle Test Tools cover a number of different areas. The Kereval team describes the tools and uses on [https://gazelle.ihe.net/content/gazelle-user-guides this page].
 +
 +
This page summarizes the tools one would actually use during a Connectathon. The page referenced above describes the full suite of tools, and some of those tools are not used directly at a testing event.
 +
 +
{| style="width:100%" border="1" cellpadding="3"
 +
! Tool
 +
! Comment
 +
|-
 +
| Gazelle Test Management
 +
|
 +
* Sometimes just referred to as 'Gazelle'
 +
* TM is the application used to manage the connectathon process, from registration through pre-Connectathon & Connectathon testing, until the generation of the test report
 +
* More description on this wiki: [[Connectathon Using Gazelle Test Management Only]]
 +
|-
 +
| Gazelle Proxy
 +
|
 +
* "Man in the middle": captures the messages exchanged between two systems and forwards them to the validation service front-end
 +
* More description on this wiki: [[Connectathon Using the Gazelle Proxy]]
 +
 +
|}

Revision as of 15:16, 14 February 2020

The Gazelle Test Tools cover a number of different areas. The Kereval team describes the tools and uses on this page.

This page summarizes the tools one would actually use during a Connectathon. The page referenced above describes the full suite of tools, and some of those tools are not used directly at a testing event.

Tool Comment
Gazelle Test Management
  • Sometimes just referred to as 'Gazelle'
  • TM is the application used to manage the connectathon process, from registration through pre-Connectathon & Connectathon testing, until the generation of the test report
  • More description on this wiki: Connectathon Using Gazelle Test Management Only
Gazelle Proxy
  • "Man in the middle": captures the messages exchanged between two systems and forwards them to the validation service front-end
  • More description on this wiki: Connectathon Using the Gazelle Proxy