Difference between revisions of "Card Plan Minutes 2011.04.02"
Jump to navigation
Jump to search
Line 57: | Line 57: | ||
#**TC core organizations need to “pre-commit” to attend in August | #**TC core organizations need to “pre-commit” to attend in August | ||
#**ACC will have to use the unspent allocation ($15K) from 2010 plus 2011's budget ($40K) and increase it to cover the CIRC (2011) profile test-cases | #**ACC will have to use the unspent allocation ($15K) from 2010 plus 2011's budget ($40K) and increase it to cover the CIRC (2011) profile test-cases | ||
− | |||
− | |||
#Proposed Calendar for Next Year | #Proposed Calendar for Next Year | ||
− | #*Potential work | + | #*April 22 - Public comment period opens |
+ | #*May 24-25 - Public comment processing face-to-face | ||
+ | #*June 20 - 3D Echo and EP white papers, TF maintenance - Vol2/Stress/REWF | ||
+ | #*August 1 - Submit proposals Open | ||
+ | #*Septembter 1 - Submit proposals Close | ||
+ | #*September 15 - Draft short list of proposals | ||
+ | #*October 15 - Complete technical analysis of short list | ||
+ | #*November 1 - PC selects final proposals | ||
+ | #*November 1 - Domain board report - due to Co-chairs on December 8 | ||
+ | #*November 15 - TC profile development kick-off meeting | ||
+ | #*January 5 - Provide board report to Steering Committee | ||
+ | #*January 12 - 2012 Connectathon | ||
+ | #*Potential Work Items | ||
+ | #**Extention of CIRC | ||
+ | #**Build on EP white paper to make full profile | ||
+ | #**MU Phase 2 profile | ||
+ | #**Radiology is looking to change the eligibility and authorization process that requires 3rd party approval of tests | ||
+ | #***Similar to ACC AUC efforts | ||
+ | #***ITI should build framework | ||
+ | #***Rad and Card should build content | ||
+ | #***This type of profile development would require interaction with payors and is new territory for IHE. There has been discussion of creating an Administrative Domain. | ||
+ | #***Tom to discuss on Co-Chairs call (Tuesday mornings) | ||
+ | #**Keller/Katz AHRQ proposal to share images on EDGE server | ||
+ | #***Would help reduce number of studies | ||
+ | #***Possible profile work for 2012 | ||
+ | #*Call for HIMSS profiles for 2012 is in May | ||
#IHE Cardiology Marketing and Promotion | #IHE Cardiology Marketing and Promotion | ||
− | #*EP | + | #*EP Promotion |
− | #*IHE- | + | #**Very good meeting with IHE and HRS/EP leaders organized by Bryan Jennings @ HIMSS |
− | #*Promotion | + | #**Very positive engagement with leading EP Physician group |
+ | #**Speaker and poster exposure @ HRS annual meeting with networked EP lab | ||
+ | #**IHE-Cardio-HRS physician meeting presentation by Dr. Katz/Bryan Jennings @ ACC | ||
+ | #*IHE-Outreach @ NCDR Users Meeting | ||
+ | #**Reachout to NCDR user/vendor community to promote RFD and CIRC CDA-based profiles to standardize data-collection interfacing, and leverage point-of-care data collection for pre-populating registry submission forms | ||
+ | #**Poster and presentation sponsored by NCDR @ Data managers meeting March 31-April 1 | ||
+ | #**ftp://ftp.ihe.net/Cardio/NCDR.11/ | ||
+ | #**Awareness raised with purchasing and vendor community | ||
+ | #**About 30 hospital registry managers were briefed and took IHE material | ||
+ | #*Promotion Focus 2011 – Report from TC F2F March 21 | ||
+ | #**Discussion with Chris Carr and IHE-RAD group during TC F2F meeting March 21-23 2011 | ||
+ | #**HIMSS is the primary show for IHE-Cardiology demonstration – not sufficient IT-attendance @ ACC/HRS | ||
+ | #***Need to create cardiology demo/track | ||
+ | #**ACC show 2011 – get PC Physicians to go to EHR-pavillion area and request those companies to participate in IHE. | ||
+ | #**ACC show 2012 – Small mini HRS/SIIM like demo to reinforce (reuse HIMSS demo) each year and get in Annual meeting press, via ACC | ||
+ | #**Get more IHE-C in Cardiology trade-press – publish our white-papers, | ||
+ | #**Include IHE interoperability based on RAD document in ACC EHR buying guide: http://www.cardiosource.org/Advocacy/Issues/Health-Information-Technology.aspx | ||
+ | #**Could also possibly link to the IHE product registry on the ACC site | ||
+ | #EP Whitepaper Update | ||
+ | #*This paper will get as close to a full profile as possible to enable future development | ||
+ | #*3 Workflow Cases | ||
+ | #**Finalize data for EP lab - CDA | ||
+ | #**Review by nurse monthly - adds to CDA | ||
+ | #**Submit structured results | ||
+ | #*April 13 - 2nd draft to TC | ||
+ | #*July 20 - Publish | ||
+ | #*Continuing to raise vendor interst/engagement |
Latest revision as of 17:11, 21 April 2011
Attendees
- Alan Katz
- David Slotwiner
- Gerald Serwer
- Andrew Keller
- James Tcheng
- William Weintraub
- Peter Tilkemeier
- John Donnelly
- Tom Dolan
- Bryan Jennings
- Harry Solomon
- Elliot Ostrow
- Nick Steblay
- Nick Gawrit
- Ken Hoyme
- Dan Roman
Minutes
- Technical Committee Report
- CIRC
- Public comment ready
- Needs review by ACC Informatics Committee
- Integration of non-invasive imaging procedure discrete data, including ACC/AHA Key data elements into the EMR
- Structures key data elements in CDA, maps to codified SNOMED/LOINC terms
- Applicable to other domains
- Basis for extension to invasive procedures as 2011-12 work item
- The TC will need a face-to-face meeting on May 24/25 - potentially at Heart House
- 3D Echo whitepaper (http://wiki.ihe.net/index.php?title=Cardiology_Technical_Committee#3D.2F4D_Echo_Workflow_Whitepaper)
- Phase 2 clinician review
- Draft updated with initial feedback from Drs. Keller/Katz/Serwer on Feb 15th
- Phase 2 clinician review requested on:
- Tissue Doppler Imaging use case
- Future use-cases
- Timeline
- April 24: Receive comments from Planning Committee (Drs. Katz, Keller and Serwer)
- May 8: Updated document with comments from Planning committee addressed to Technical Committee for review
- June: Detailed review by the Technical committee
- July 12: Submission to RSNA
- July 20 : PUBLISH
- Technical Framework Maintenance (ftp://ftp.ihe.net/Cardio/TF_Maintenance/2.Assigned_CPs/)
- CP001: Add PCC relevant content. No text yet, not relevant for connectathon testing
- CP007: Clarification for Card-2: This profile could be reviewed and sent out for ballot. It would trigger a new release of the TF-Vol2
- CP008: Clarifications in STRESS supplement needed. There is no text yet. One of the issues is the clarification of supported SOP Classes. If we want this to go in for #**Connectathon testing we should start to look into this. This might trigger a republishing of a Supplement
- CP009: IDCO HL7 profiling conventions. Maybe handled through PCD. Not essential for Connectathon testing
- CP010: HL7 Profiling conventions. Candidate to postpone until Rad CP213 is ready. The Rad CP majorly changes this section. Not relevant for Connectathon testing.
- Newly Submitted: Clarification on Actor Grouping in REWF. There is text yet, that could be reviewed. Could be nice to clarify before connectathon. Would trigger re-publishing of REWF Supplement
- IHE Cardiology Connectathon
- 2011 Connectathon
- Very low vendor sign-up
- No cardiology test-cases tested
- 2010-new profile (REWF/IEO/DRPT)test-scripts have NOT been developed.
- Also means no testing possible @ European connectathon in May 2011
- 2012 Connectathon
- 2010 profile test case tooling still to be completed for January 2012
- Mallinkrodt will need some evidence of vendor interest
- TC core organizations need to “pre-commit” to attend in August
- ACC will have to use the unspent allocation ($15K) from 2010 plus 2011's budget ($40K) and increase it to cover the CIRC (2011) profile test-cases
- CIRC
- Proposed Calendar for Next Year
- April 22 - Public comment period opens
- May 24-25 - Public comment processing face-to-face
- June 20 - 3D Echo and EP white papers, TF maintenance - Vol2/Stress/REWF
- August 1 - Submit proposals Open
- Septembter 1 - Submit proposals Close
- September 15 - Draft short list of proposals
- October 15 - Complete technical analysis of short list
- November 1 - PC selects final proposals
- November 1 - Domain board report - due to Co-chairs on December 8
- November 15 - TC profile development kick-off meeting
- January 5 - Provide board report to Steering Committee
- January 12 - 2012 Connectathon
- Potential Work Items
- Extention of CIRC
- Build on EP white paper to make full profile
- MU Phase 2 profile
- Radiology is looking to change the eligibility and authorization process that requires 3rd party approval of tests
- Similar to ACC AUC efforts
- ITI should build framework
- Rad and Card should build content
- This type of profile development would require interaction with payors and is new territory for IHE. There has been discussion of creating an Administrative Domain.
- Tom to discuss on Co-Chairs call (Tuesday mornings)
- Keller/Katz AHRQ proposal to share images on EDGE server
- Would help reduce number of studies
- Possible profile work for 2012
- Call for HIMSS profiles for 2012 is in May
- IHE Cardiology Marketing and Promotion
- EP Promotion
- Very good meeting with IHE and HRS/EP leaders organized by Bryan Jennings @ HIMSS
- Very positive engagement with leading EP Physician group
- Speaker and poster exposure @ HRS annual meeting with networked EP lab
- IHE-Cardio-HRS physician meeting presentation by Dr. Katz/Bryan Jennings @ ACC
- IHE-Outreach @ NCDR Users Meeting
- Reachout to NCDR user/vendor community to promote RFD and CIRC CDA-based profiles to standardize data-collection interfacing, and leverage point-of-care data collection for pre-populating registry submission forms
- Poster and presentation sponsored by NCDR @ Data managers meeting March 31-April 1
- ftp://ftp.ihe.net/Cardio/NCDR.11/
- Awareness raised with purchasing and vendor community
- About 30 hospital registry managers were briefed and took IHE material
- Promotion Focus 2011 – Report from TC F2F March 21
- Discussion with Chris Carr and IHE-RAD group during TC F2F meeting March 21-23 2011
- HIMSS is the primary show for IHE-Cardiology demonstration – not sufficient IT-attendance @ ACC/HRS
- Need to create cardiology demo/track
- ACC show 2011 – get PC Physicians to go to EHR-pavillion area and request those companies to participate in IHE.
- ACC show 2012 – Small mini HRS/SIIM like demo to reinforce (reuse HIMSS demo) each year and get in Annual meeting press, via ACC
- Get more IHE-C in Cardiology trade-press – publish our white-papers,
- Include IHE interoperability based on RAD document in ACC EHR buying guide: http://www.cardiosource.org/Advocacy/Issues/Health-Information-Technology.aspx
- Could also possibly link to the IHE product registry on the ACC site
- EP Promotion
- EP Whitepaper Update
- This paper will get as close to a full profile as possible to enable future development
- 3 Workflow Cases
- Finalize data for EP lab - CDA
- Review by nurse monthly - adds to CDA
- Submit structured results
- April 13 - 2nd draft to TC
- July 20 - Publish
- Continuing to raise vendor interst/engagement