2009 sponsor review
Jump to navigation
Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
This page tracks the progress on reviewing ITI documents returned from the sponsor prior to Aug 2009 publication.
Document | Reviewer | Status | Comments |
Vol 1 | Karen |
Done |
|
Vol 2a | Lynn | Reviewed |
|
2b | Lynn | Reviewed |
|
2x |
Lynn | Reviewed |
|
Vol 3 | Karen | Done | Multiple concerns with tables 4.1-5, 4.1-6 - added bullets that were lost, changed examples to be different format, changed width of last column to better fit the contents. Also TOC needed regeneration. R |
Async | Karen | Done | Title page says Final Text - should say Trial Implementation |
PDO | Lynn | Reviewed | No changes needed. |
XCA | Karen | Done | Section 3.38.4.1.3 had errors in use of bullets, lines 1107-1108 are indented too far - should be a continuation of the top bullet list not the secondar bullet list. |
XDR | Lynn | Reviewed |
|
DRR | Karen | Done | One little nit line 304 the editor box says "Add Section 3.Y" and should say "Add Section 3.49 and 3.50.". |
MPQ | Lynn | Reviewed | Version with very minor table resizing returned to Lisa. Unresolved extra line on pg. 13....can live with it. |
NAV | Lynn | Reviewed |
|
RFD | Lynn | Reviewed |
|
SVS | Lynn | Reviewed | On line 78, in the box about submitting comments, change “200-2009” to “2009-2010” |
Pat Merge | Manuel | Reviewed | |
DSG | Manuel | Reviewed | |
XCPD | Karen | Done | No issues found. |
PIX/PDQ HL7 V3 | Lynn | Reviewed | Pg 6, end of Closed Issues section: Change HIMSS 2008 to HIMSS2010 and August 2008 to May 2010 |
DSUB | Manuel | Vassil has not yet turned doc over to sponsors |