Difference between revisions of "2009 sponsor review"
Jump to navigation
Jump to search
Line 99: | Line 99: | ||
<td>Manuel</td> | <td>Manuel</td> | ||
<td>Reviewed</td> | <td>Reviewed</td> | ||
− | <td> | + | <td><li>Pg 1: in the title change 2008-2009 to 2009-2010 to be consistent with the other supplements updated this year.<li>Pg 7, line 169: change "ITI TF-2a:18.4.1.2.3.8.1" to "ITI TF-2a:3.18.4.1.2.3.8.1" <li>Pg 10, line 278: Add "Volume 3" in title format before the editor box.<li>Pg 10, line 304-312: move this section to line 206 before section 3.16.4.1.2 so that the editorial changes are in the right order (be sure to take the editorial box with the moved text).</td> |
</tr> | </tr> | ||
<tr> | <tr> |
Latest revision as of 09:31, 7 August 2009
This page tracks the progress on reviewing ITI documents returned from the sponsor prior to Aug 2009 publication.
Document | Reviewer | Status | Comments |
Vol 1 | Karen |
Done |
|
Vol 2a | Lynn | Reviewed |
|
2b | Lynn | Reviewed |
|
2x |
Lynn | Reviewed |
|
Vol 3 | Karen | Done | Multiple concerns with tables 4.1-5, 4.1-6 - added bullets that were lost, changed examples to be different format, changed width of last column to better fit the contents. Also TOC needed regeneration. R |
Async | Karen | Done | Title page says Final Text - should say Trial Implementation |
PDO | Lynn | Reviewed | No changes needed. |
XCA | Karen | Done | Section 3.38.4.1.3 had errors in use of bullets, lines 1107-1108 are indented too far - should be a continuation of the top bullet list not the secondar bullet list. |
XDR | Lynn | Reviewed |
|
DRR | Karen | Done | One little nit line 304 the editor box says "Add Section 3.Y" and should say "Add Section 3.49 and 3.50.". |
MPQ | Lynn | Reviewed | Version with very minor table resizing returned to Lisa. Unresolved extra line on pg. 13....can live with it. |
NAV | Lynn | Reviewed |
|
RFD | Lynn | Reviewed |
|
SVS | Lynn | Reviewed | On line 78, in the box about submitting comments, change “200-2009” to “2009-2010” |
Pat Merge | Manuel | Reviewed | |
DSG | Manuel | Reviewed | |
XCPD | Karen | Done | No issues found. |
PIX/PDQ HL7 V3 | Lynn | Reviewed | Pg 6, end of Closed Issues section: Change HIMSS 2008 to HIMSS2010 and August 2008 to May 2010 |
DSUB | Manuel | Vassil has not yet turned doc over to sponsors |