Difference between revisions of "Rad TF Maintenance 2014-15"

From IHE Wiki
Jump to navigation Jump to search
(Created page with "Target: :* Publish CP Ballot in early-Jan 2015 (for CPs needed for IHE-Europe Connectathon in April 2015) :** Allow adequate time at the Nov F2F Meeting to prep for this :* Publ...")
 
Line 8: Line 8:
 
Number of outstanding CPs:
 
Number of outstanding CPs:
 
:* XX '''Assigned''' CPs to work on  
 
:* XX '''Assigned''' CPs to work on  
::* For specifics refer to [ftp://iheyr2:interop@ftp.ihe.net/Radiology/TF_Maintenance/IHE_Radiology_CP_Tracking-2013-08-23.xls Tracking Doc] and sort by Status
+
::* For specifics refer to [ftp://iheyr2:interop@ftp.ihe.net/Radiology/TF_Maintenance/IHE_Radiology_CP_Tracking-2014-06-04.xls Tracking Doc] and sort by Status
 
::* (about 2/3 are stagnant) Should do a review/triage of dormant CPs and cancel or re-start
 
::* (about 2/3 are stagnant) Should do a review/triage of dormant CPs and cancel or re-start
  
Line 26: Line 26:
  
 
List of other maintenance tasks:
 
List of other maintenance tasks:
 +
:* IHE-J is preparing a National Extension document for submission (focus on SWF.b)
 +
:* Add 2 (estimated) FT Supplements to TF
 
:* Cleanup of Cross-Referencing to ITI (they renumbered their sections)
 
:* Cleanup of Cross-Referencing to ITI (they renumbered their sections)
 
:* Adoption of new IHE Templates for Tech Framework
 
:* Adoption of new IHE Templates for Tech Framework
 
:** An upcoming forcing function will be when we make Final Text any of the new supplements that have used the new supplement template which is intended to align with the new TF Template.
 
:** An upcoming forcing function will be when we make Final Text any of the new supplements that have used the new supplement template which is intended to align with the new TF Template.
:* Add 2 FT Supplements to TF (and any made FT next year)
 
:* R2/RE Harmonization?
 
  
 
==7. Risks==
 
==7. Risks==
Line 38: Line 38:
  
 
Effort Evaluation (as a % of Tech Cmte Bandwidth):
 
Effort Evaluation (as a % of Tech Cmte Bandwidth):
:* ''40% - based on allowing time to delve into clearing the stagnant CP backlog, and look into aligning the TF with the new TF Template (assuming we can get a primary editor for that task)''
+
:* ''e.g. 40% - based on allowing time to delve into clearing the stagnant CP backlog, and look into aligning the TF with the new TF Template (assuming we can get a primary editor for that task)''
  
 
Responses to Issues:
 
Responses to Issues:

Revision as of 17:07, 3 September 2014

Target:

  • Publish CP Ballot in early-Jan 2015 (for CPs needed for IHE-Europe Connectathon in April 2015)
    • Allow adequate time at the Nov F2F Meeting to prep for this
  • Publish CP Ballot at end-of-April 2015
  • Incorporate FT CPs into updated TF released July 2015


Number of outstanding CPs:

  • XX Assigned CPs to work on
  • For specifics refer to Tracking Doc and sort by Status
  • (about 2/3 are stagnant) Should do a review/triage of dormant CPs and cancel or re-start
  • X Completed CPs that failed ballot and need to be reworked
  • X Submitted CPs to review/assign (as of Oct 8 when this was due)
  • X Final Text CPs to confirm have been incorporated into TF

List of "non-trivial" CPs:

  • CP-xxx :


List of outstanding items not yet submitted as CPs:

List of other maintenance tasks:

  • IHE-J is preparing a National Extension document for submission (focus on SWF.b)
  • Add 2 (estimated) FT Supplements to TF
  • Cleanup of Cross-Referencing to ITI (they renumbered their sections)
  • Adoption of new IHE Templates for Tech Framework
    • An upcoming forcing function will be when we make Final Text any of the new supplements that have used the new supplement template which is intended to align with the new TF Template.

7. Risks

  • Risk of effort spent on updating existing Supplements and TF to match new templates being low return-on-investment.

9. Tech Cmte Evaluation

Effort Evaluation (as a % of Tech Cmte Bandwidth):

  • e.g. 40% - based on allowing time to delve into clearing the stagnant CP backlog, and look into aligning the TF with the new TF Template (assuming we can get a primary editor for that task)

Responses to Issues:

See italics in Risk and Open Issue sections

Candidate Editor:

Kevin O'Donnell