Difference between revisions of "ITI CPs 2016-17-Agenda and Minutes from past CP calls"

From IHE Wiki
Jump to navigation Jump to search
 
(10 intermediate revisions by 2 users not shown)
Line 6: Line 6:
  
 
  __TOC__
 
  __TOC__
 +
 +
== June 22, 2017 ==
 +
 +
'''Attendees:''' Elliott Lavy (Harris Computer), Gregorio Canal (Arsenal.IT), Joe Lamy (Aegis/SSA), John Moehrke (ByLight), Elliot Silver (Change HC), Karen Witting (Ready Computing), Tarik Idris (ICW), Lynn Felhofer
 +
 +
--> '''ITI CP Tracking Spreadsheet''' is [https://docs.google.com/spreadsheets/d/1gdr_Y8xZBvbb326J4z67cqprxOexFgtkPj_VlD3rB9E/edit?usp=sharing here].
 +
 +
'''(1) Consultation on a couple of updates to the XDS-MU Supplement to be published in 2017'''
 +
* The committee gave guidance on updates to text to solve a couple of CP integration mysteries in preparing the updates to the XDS-MU Supplement for publication in late July.
 +
 +
'''(2) :Review Incoming CPs''' ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/0_Incoming/
 +
* CP-ITI-XDW_fix_&_improvements.docx - Accepted and assigned to Mauro as CP 1054.  Could be moved to Completed when Mauro & Gregario confirm that the proposed change does not 'break' any existing WD profiles based on XDW
 +
* CP-ITI-LF-MissingODColumnsinXDS-MUtables.doc - Assigned to Karen as CP 1055, discussed, updated and accepted Completed as CP 1055
 +
* CP-ITI-LF-updateITI-20forBetterReuse.doc - discussed at tentatively accepted.  Needs further discussion when Rob Horn is available to understand how ITI-20 is re-used in the SOLE profile and why SOLE needs the Role abstraction in the transaction.  Assigned for now to Lynn as CP 1056
 +
 +
'''(3) Next in CPs'''
 +
* Ballot 43 - Lynn will be compiling and sending out Ballot 43 next week.  This will be the first ballot of the next publication cycle.
 +
* Transition to 2017-18 CP & publication cycle - Lynn will be working on the infrastructure to start a new CP publication cycle (updates to FTP site, wiki, CP tracking sheet),  There will be an email sent to ititech with details with that work is done.
 +
 +
== June 15, 2017 ==
 +
 +
'''Attendees:''' Elliot Silver (Change HC), Elliott Lavy (Harris Computer), Joe Lamy (Aegis/SSA), John Moehrke (By Light), Karen Witting (Ready Computing), Gregorio Canal (Arsenàl.IT), Lynn Felhofer
 +
 +
--> '''ITI CP Tracking Spreadsheet''' is [https://docs.google.com/spreadsheets/d/1gdr_Y8xZBvbb326J4z67cqprxOexFgtkPj_VlD3rB9E/edit?usp=sharing here].
 +
 +
'''(1) : Review Incoming CPs''' ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/0_Incoming/
 +
* CP-ITI-ELS-Doc-Sharing-Cardinality.doc - assigned for now to Elliot Silver as CP 1052
 +
* CP-ITI-updateBPPCvol1perTemplate.docx - assigned to Lynn as CP 1051; need to investigate consistency w/ other ITI profiles w/ Content Creator/Consumer
 +
* CP-ITI-PCC-Metadata.doc - reviewed, updated and accepted as Completed for future ballot - CP 1053
 +
 +
'''(2) Assigned CPs ready for discussion''' ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/1_Assigned/
 +
* 1043-00 - Refactor ITI-18 to enable easier re-use by non-XDS actors (Lynn) - discussed; received guidance; Lynn will continue work and bring back to a future call for review
 +
* Out of time for these; pushed to future agenda:
 +
** 938-01 - Audit messages for ITI-30 and 31(Lynn)
 +
** 1022-00 - Specification of ITI-30 as optional transaction in PIX is incomplete (Lynn)
 +
 +
'''(3) Next in CPs'''
 +
* Seeking input on focus for 4 CP calls prior to F2F --  June 22 -  July 13
 +
** Regular CP call participants admitted that their time to work on CPs in the near-term is limited, so there was no momentum in one specific area to be able to target a call on one ttechnical area.  We considered canceling some of the upcoming calls, but the consensus was to keep the one-hour-per week CP calls to keep momentum.  Lynn will seek agenda items prior to each call.
 +
 +
== June 8, 2017 ==
 +
 +
'''Attendees:''' Gregorio Canal (Arsenàl.IT), Rob Horn (Agfa), John Moehrke (By Light), Ken Meyer (Merge/IBM), Elliott Lavy (Harris), Elliot Silver (McKesson), Karen Witting (Ready Computing), Bill Majurski (NIST), Lynn Felhofer, Erika
 +
 +
--> '''ITI CP Tracking Spreadsheet''' is [https://docs.google.com/spreadsheets/d/1gdr_Y8xZBvbb326J4z67cqprxOexFgtkPj_VlD3rB9E/edit?usp=sharing here].
 +
 +
'''(1) Next steps for XDS Metadata Model''' -- Initial Discussion and Scope (Ken & Bill)  (30 min)
 +
* '''Problem statement:'''  When ITI Tech attempts to address individual Vol 2 and 3 CPs regarding the metadata model and document relationships, we have been struggling to resolve them and maintain consistency across TF documentation due to lack of a consistent view among TC members and in the documentation itself of use cases. Vol 1 documentation of the document relationship model is spread across the XDS Vol 1 sub-sections and in Appx K.
 +
* Bill & Ken propose to extract relevant Vol 1 material so that it can be reviewed and discussed with the goal of ensuring Vol 1 material accurately presents the model and use cases.
 +
* Tentative schedule:
 +
** For the next 1-2 week, Ken & Bill will work together to extract, review and provisionally update Vol 1 material that applis to the XDS metadata model, document relationships...
 +
** They will then send that material to the ititech email list to seek TC member review in preparation for a discussion at the July F2F. 
 +
** Co-chairs & Ken/Bill assess the input and determine how much time can be allocated to this during the F2F.
 +
** Discuss during the July F2F.
 +
* After the July F2F, we will have a better consensus & general understanding.  Then, the existing Vol 2/3 content & open CPs can be examined in the light of the understanding gained in the discussion of Vol 1.
 +
'''(2) Assigned CPs ready for discussion''' ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/1_Assigned/
 +
* 1048-00 - Correct DSG Content Consumer guidance on extra signatures (John) - reviewed and slightly revised.  Version -01 is Completed and ready for future ballot
 +
* 1023-00 Volume 3 DocumentEntry.sourcePatientId (Ken) -- reviewed and determined that these proposed edits are not needed (but do give hints for future CPs).  This one will be cancelled.
 +
* We also spent time revising DocumentEntry.sourcePatientInfo in Vol 3 to be published in August to resolve overlapping Final Text CPs 997 and 787.  Bravo!
 +
* Out of time for these; deferred to June 15
 +
** 1043-00 - Need an actor that supports only ITI-18 as a client (Lynn) - should we move this forward; if so, it needs to be Assigned to an editor.
 +
** 938-01 - Audit messages for ITI-30 and 31(Lynn)
 +
** 1022-00 - Specification of ITI-30 as optional transaction in PIX is incomplete (Lynn)
 +
 +
'''(3) Out of time; deferred to June 15: Review Incoming CPs''' ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/0_Incoming/
 +
* CP-ITI-ELS-Doc-Sharing-Cardinality.doc
 +
 +
'''(4) Next in CPs'''
 +
* Input on focus for upcoming CP calls:
 +
** June 15
 +
** June 22
 +
** June 29
 +
 +
== Tues June 6, 2017 - Ballot 42 resolution -- call 3 ==
 +
 +
'''(1) CP Ballot 42 resolution
 +
* Ballot 42 contents: ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/Ballots/2017/Ballot_42/
 +
* Ballot 42 consolidated comments are [https://docs.google.com/spreadsheets/d/1yxJa2Ti33QQ2xe3j3K_Dn-oeDqc6o_YrNpRvg4pGN4A/edit?usp=sharing here].  Editors have added resolution notes to the comments.
 +
* Some comments were submitted using Word markup.  Those are gathered [ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/Ballots/2017/Ballot_42/BallotCommentsWithWordMarkUps/ here]
 +
* Discussion of Elliot Silver's comments:
 +
** MHD
 +
** PDQm
 +
 +
'''(2) Next in CPs'''
 +
* Thur June 8, 10-11 CDT - We resume regular CP calls
 +
 +
== Thurs June 1, 2017 - Ballot 42 resolution -- call 2 ==
 +
 +
'''Attendees:'''  Christian Ohr (ICW), Elliott Lavy (Harris), Gregorio Canal (Arsenàl.IT), Daniel Berezeanu (Ready Computing), Joe Lamy (SSA/Aegis), John Moehrke (By Light), Ken Meyer (Merge/IBM), Rob Horn (Agfa), Luke Duncan (IntraHealth), Lynn Felhofer
 +
 +
'''(1) CP Ballot 42 resolution
 +
* Ballot 42 contents: ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/Ballots/2017/Ballot_42/
 +
* Ballot 42 consolidated comments are [https://docs.google.com/spreadsheets/d/1yxJa2Ti33QQ2xe3j3K_Dn-oeDqc6o_YrNpRvg4pGN4A/edit?usp=sharing here].  Editors have added resolution notes to the comments.
 +
* Some comments were submitted using Word markup.  Those are gathered [ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/Ballots/2017/Ballot_42/BallotCommentsWithWordMarkUps/ here]
 +
* Discussion:
 +
** MHD - John led the discussion & resolution of non-editorial comments.  A few remaining comments from Elliot Silver will be discussed at a separate call next Tues June 6, 11-noon CDT.
 +
** PIXm - Daniel led the discussion on one issue needing resolution; agreed to make the proposed change to Case 3.  All comments are resolved.
 +
** Common '''FMM''' text on cover page and in the Introduction to each supplement - the group agreed to the content proposed by Elliot Silver.  Lynn will send ensure mACM and PIXm follows this format.
 +
'''(2) Next in CPs'''
 +
* Tues June 6, 11-noon CDT -  Final review of Elliot Silver's comments on FHIR-based supplements
 +
* Thur June 8, 10-11 CDT - We resume regular CP calls
 +
 +
== Tues May 30, 2017 - Ballot 42 resolution -- call 1 ==
 +
 +
'''Attendees:''' Gregorio Canal & Mauro Zanardini (Arsenàl.IT), Charles Parisot (GE), Christian Ohr (ICW), Elliott Lavy (Harris), Loe Lamy (Aegis/SSA), John Moehrke (By Light), Ken Meyer (Merge/IBM), Luke Duncan (IntraHealth), Rob Horn (Agfa),  Lynn Felhofer, Jeremiah Myers (HIMSS)
 +
 +
--> '''ITI CP Tracking Spreadsheet''' is [https://docs.google.com/spreadsheets/d/1gdr_Y8xZBvbb326J4z67cqprxOexFgtkPj_VlD3rB9E/edit?usp=sharing here].
 +
 +
'''(1) CP Ballot 42 resolution
 +
* Ballot 42 contents: ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/Ballots/2017/Ballot_42/
 +
* Ballot 42 consolidated comments are [https://docs.google.com/spreadsheets/d/1yxJa2Ti33QQ2xe3j3K_Dn-oeDqc6o_YrNpRvg4pGN4A/edit?usp=sharing here].  Editors have added some resolution notes.
 +
* Some comments were submitted using Word markup.  Those are gathered [ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/Ballots/2017/Ballot_42/BallotCommentsWithWordMarkUps/ here]
 +
* We will discuss comments in this order:
 +
** RESTful ATNA - Mauro made edits based on editorial comments, and led the group through comments needing discussion.  All comments were resolved.
 +
** mACM -  Luke led the group through comments needing discussion.  All comments were resolved.
 +
** PDQm - John led the group through comments needing discussion.  All comments were resolved.
 +
* Appx Z - John led the group through comments needing discussion.  Most comments were resolved.  A few from Elliot Silver were deferred until Thursday.  John will present some updated text for review on Thursday's call.
 +
 +
'''(2) Next in CPs'''
 +
* We resume our discussion on Thur June 1, 10-noon CDT:
 +
** MHD
 +
** Appx Z - a few comments from Elliot Silver
 +
** PIXm
  
 
== May 25, 2017 ==  
 
== May 25, 2017 ==  
Line 16: Line 139:
 
* CP-ITI-JKV_MISSING_PREFIX.doc - reviewed and accepted as Completed CP 1046; ready for future Ballot 43
 
* CP-ITI-JKV_MISSING_PREFIX.doc - reviewed and accepted as Completed CP 1046; ready for future Ballot 43
 
* CP-ITI-LF-RemoveUserAuthRqmtfromITI-19.doc - reviewed and Assigned to Rob as CP 1047 who will propose text
 
* CP-ITI-LF-RemoveUserAuthRqmtfromITI-19.doc - reviewed and Assigned to Rob as CP 1047 who will propose text
* CP-ITI-ExtraSigHandling.doc- reviewed and Assigned to John as CP 1048; proposed text needs a bit more review; will add to agenda for future CP call
+
* CP-ITI-ExtraSigHandling.doc- reviewed and Assigned to John as CP 1048; proposed text needs a bit more review; will add to agenda for June 8 CP call
 
* CP-ITI-CP-PIXvsPDQ.doc - reviewed and Assigned to Ben Levy as CP 1049; Ben's proposed wording needs further committee review and need to propose where to insert it into the TF
 
* CP-ITI-CP-PIXvsPDQ.doc - reviewed and Assigned to Ben Levy as CP 1049; Ben's proposed wording needs further committee review and need to propose where to insert it into the TF
* CP-ITI-ESL_Appendix_B_Cleanup.doc  - reviewed and Assigned to Elliott L as CP 1050;  Elliott will review the remainder of Appx Z text to see if more document-specific text can be genericized.
+
* CP-ITI-ESL_Appendix_B_Cleanup.doc  - reviewed and Assigned to Elliott L as CP 1050;  Elliott will review the remainder of Appx B text to see if more document-specific text can be genericized.
  
 
'''(2) Assigned CPs ready for discussion''' ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/1_Assigned/
 
'''(2) Assigned CPs ready for discussion''' ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/1_Assigned/
* 1044-00 - Update Vol. 1, and Vol 2 Appendices to reflect RMD (Elliot S)
+
* 1044-00 - Update Vol. 1, and Vol 2 Appendices to reflect RMD (Elliot S) - reviewed and identified that the changes need to be split between updates to RMD & XDS-TI; reassigned to Ken for add'l work
 
* 989-03 - Clarify Required Query Parameter Error Codes (Ken) -reviewed as slightly updated; -04 accepted as Completed; ready for future Ballot 43
 
* 989-03 - Clarify Required Query Parameter Error Codes (Ken) -reviewed as slightly updated; -04 accepted as Completed; ready for future Ballot 43
* Out of time for these:
+
* Out of time for these; deferred to June 8 call:
 
** 1023-00 - Correct Volume 3 DocumentEntry.sourcePatientId (Ken)
 
** 1023-00 - Correct Volume 3 DocumentEntry.sourcePatientId (Ken)
 
** 1043-00 - Need an actor that supports only ITI-18 as a client (Lynn)
 
** 1043-00 - Need an actor that supports only ITI-18 as a client (Lynn)

Latest revision as of 17:35, 23 June 2017

ITI domain CPs for 2016-2017 are managed here: ITI Change Proposals 2017

This page contains the minutes from past CP review calls during the 2016-17 publication cycle.

Current ITI CP status spreadsheet is here

June 22, 2017

Attendees: Elliott Lavy (Harris Computer), Gregorio Canal (Arsenal.IT), Joe Lamy (Aegis/SSA), John Moehrke (ByLight), Elliot Silver (Change HC), Karen Witting (Ready Computing), Tarik Idris (ICW), Lynn Felhofer

--> ITI CP Tracking Spreadsheet is here.

(1) Consultation on a couple of updates to the XDS-MU Supplement to be published in 2017

  • The committee gave guidance on updates to text to solve a couple of CP integration mysteries in preparing the updates to the XDS-MU Supplement for publication in late July.

(2) :Review Incoming CPs ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/0_Incoming/

  • CP-ITI-XDW_fix_&_improvements.docx - Accepted and assigned to Mauro as CP 1054. Could be moved to Completed when Mauro & Gregario confirm that the proposed change does not 'break' any existing WD profiles based on XDW
  • CP-ITI-LF-MissingODColumnsinXDS-MUtables.doc - Assigned to Karen as CP 1055, discussed, updated and accepted Completed as CP 1055
  • CP-ITI-LF-updateITI-20forBetterReuse.doc - discussed at tentatively accepted. Needs further discussion when Rob Horn is available to understand how ITI-20 is re-used in the SOLE profile and why SOLE needs the Role abstraction in the transaction. Assigned for now to Lynn as CP 1056

(3) Next in CPs

  • Ballot 43 - Lynn will be compiling and sending out Ballot 43 next week. This will be the first ballot of the next publication cycle.
  • Transition to 2017-18 CP & publication cycle - Lynn will be working on the infrastructure to start a new CP publication cycle (updates to FTP site, wiki, CP tracking sheet), There will be an email sent to ititech with details with that work is done.

June 15, 2017

Attendees: Elliot Silver (Change HC), Elliott Lavy (Harris Computer), Joe Lamy (Aegis/SSA), John Moehrke (By Light), Karen Witting (Ready Computing), Gregorio Canal (Arsenàl.IT), Lynn Felhofer

--> ITI CP Tracking Spreadsheet is here.

(1) : Review Incoming CPs ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/0_Incoming/

  • CP-ITI-ELS-Doc-Sharing-Cardinality.doc - assigned for now to Elliot Silver as CP 1052
  • CP-ITI-updateBPPCvol1perTemplate.docx - assigned to Lynn as CP 1051; need to investigate consistency w/ other ITI profiles w/ Content Creator/Consumer
  • CP-ITI-PCC-Metadata.doc - reviewed, updated and accepted as Completed for future ballot - CP 1053

(2) Assigned CPs ready for discussion ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/1_Assigned/

  • 1043-00 - Refactor ITI-18 to enable easier re-use by non-XDS actors (Lynn) - discussed; received guidance; Lynn will continue work and bring back to a future call for review
  • Out of time for these; pushed to future agenda:
    • 938-01 - Audit messages for ITI-30 and 31(Lynn)
    • 1022-00 - Specification of ITI-30 as optional transaction in PIX is incomplete (Lynn)

(3) Next in CPs

  • Seeking input on focus for 4 CP calls prior to F2F -- June 22 - July 13
    • Regular CP call participants admitted that their time to work on CPs in the near-term is limited, so there was no momentum in one specific area to be able to target a call on one ttechnical area. We considered canceling some of the upcoming calls, but the consensus was to keep the one-hour-per week CP calls to keep momentum. Lynn will seek agenda items prior to each call.

June 8, 2017

Attendees: Gregorio Canal (Arsenàl.IT), Rob Horn (Agfa), John Moehrke (By Light), Ken Meyer (Merge/IBM), Elliott Lavy (Harris), Elliot Silver (McKesson), Karen Witting (Ready Computing), Bill Majurski (NIST), Lynn Felhofer, Erika

--> ITI CP Tracking Spreadsheet is here.

(1) Next steps for XDS Metadata Model -- Initial Discussion and Scope (Ken & Bill) (30 min)

  • Problem statement: When ITI Tech attempts to address individual Vol 2 and 3 CPs regarding the metadata model and document relationships, we have been struggling to resolve them and maintain consistency across TF documentation due to lack of a consistent view among TC members and in the documentation itself of use cases. Vol 1 documentation of the document relationship model is spread across the XDS Vol 1 sub-sections and in Appx K.
  • Bill & Ken propose to extract relevant Vol 1 material so that it can be reviewed and discussed with the goal of ensuring Vol 1 material accurately presents the model and use cases.
  • Tentative schedule:
    • For the next 1-2 week, Ken & Bill will work together to extract, review and provisionally update Vol 1 material that applis to the XDS metadata model, document relationships...
    • They will then send that material to the ititech email list to seek TC member review in preparation for a discussion at the July F2F.
    • Co-chairs & Ken/Bill assess the input and determine how much time can be allocated to this during the F2F.
    • Discuss during the July F2F.
  • After the July F2F, we will have a better consensus & general understanding. Then, the existing Vol 2/3 content & open CPs can be examined in the light of the understanding gained in the discussion of Vol 1.

(2) Assigned CPs ready for discussion ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/1_Assigned/

  • 1048-00 - Correct DSG Content Consumer guidance on extra signatures (John) - reviewed and slightly revised. Version -01 is Completed and ready for future ballot
  • 1023-00 Volume 3 DocumentEntry.sourcePatientId (Ken) -- reviewed and determined that these proposed edits are not needed (but do give hints for future CPs). This one will be cancelled.
  • We also spent time revising DocumentEntry.sourcePatientInfo in Vol 3 to be published in August to resolve overlapping Final Text CPs 997 and 787. Bravo!
  • Out of time for these; deferred to June 15
    • 1043-00 - Need an actor that supports only ITI-18 as a client (Lynn) - should we move this forward; if so, it needs to be Assigned to an editor.
    • 938-01 - Audit messages for ITI-30 and 31(Lynn)
    • 1022-00 - Specification of ITI-30 as optional transaction in PIX is incomplete (Lynn)

(3) Out of time; deferred to June 15: Review Incoming CPs ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/0_Incoming/

  • CP-ITI-ELS-Doc-Sharing-Cardinality.doc

(4) Next in CPs

  • Input on focus for upcoming CP calls:
    • June 15
    • June 22
    • June 29

Tues June 6, 2017 - Ballot 42 resolution -- call 3

(1) CP Ballot 42 resolution

(2) Next in CPs

  • Thur June 8, 10-11 CDT - We resume regular CP calls

Thurs June 1, 2017 - Ballot 42 resolution -- call 2

Attendees: Christian Ohr (ICW), Elliott Lavy (Harris), Gregorio Canal (Arsenàl.IT), Daniel Berezeanu (Ready Computing), Joe Lamy (SSA/Aegis), John Moehrke (By Light), Ken Meyer (Merge/IBM), Rob Horn (Agfa), Luke Duncan (IntraHealth), Lynn Felhofer

(1) CP Ballot 42 resolution

  • Ballot 42 contents: ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/Ballots/2017/Ballot_42/
  • Ballot 42 consolidated comments are here. Editors have added resolution notes to the comments.
  • Some comments were submitted using Word markup. Those are gathered here
  • Discussion:
    • MHD - John led the discussion & resolution of non-editorial comments. A few remaining comments from Elliot Silver will be discussed at a separate call next Tues June 6, 11-noon CDT.
    • PIXm - Daniel led the discussion on one issue needing resolution; agreed to make the proposed change to Case 3. All comments are resolved.
    • Common FMM text on cover page and in the Introduction to each supplement - the group agreed to the content proposed by Elliot Silver. Lynn will send ensure mACM and PIXm follows this format.

(2) Next in CPs

  • Tues June 6, 11-noon CDT - Final review of Elliot Silver's comments on FHIR-based supplements
  • Thur June 8, 10-11 CDT - We resume regular CP calls

Tues May 30, 2017 - Ballot 42 resolution -- call 1

Attendees: Gregorio Canal & Mauro Zanardini (Arsenàl.IT), Charles Parisot (GE), Christian Ohr (ICW), Elliott Lavy (Harris), Loe Lamy (Aegis/SSA), John Moehrke (By Light), Ken Meyer (Merge/IBM), Luke Duncan (IntraHealth), Rob Horn (Agfa), Lynn Felhofer, Jeremiah Myers (HIMSS)

--> ITI CP Tracking Spreadsheet is here.

(1) CP Ballot 42 resolution

  • Ballot 42 contents: ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/Ballots/2017/Ballot_42/
  • Ballot 42 consolidated comments are here. Editors have added some resolution notes.
  • Some comments were submitted using Word markup. Those are gathered here
  • We will discuss comments in this order:
    • RESTful ATNA - Mauro made edits based on editorial comments, and led the group through comments needing discussion. All comments were resolved.
    • mACM - Luke led the group through comments needing discussion. All comments were resolved.
    • PDQm - John led the group through comments needing discussion. All comments were resolved.
  • Appx Z - John led the group through comments needing discussion. Most comments were resolved. A few from Elliot Silver were deferred until Thursday. John will present some updated text for review on Thursday's call.

(2) Next in CPs

  • We resume our discussion on Thur June 1, 10-noon CDT:
    • MHD
    • Appx Z - a few comments from Elliot Silver
    • PIXm

May 25, 2017

Attendees: Joe Lamy (SSA/Aegis), Ken Meyer (Merge/IBM), Rob Horn (Agfa), Elliot Silver (Change HC), Elliott Lavy (Harris), Karen Witting (Ready Computing), Lynn Felhofer

--> ITI CP Tracking Spreadsheet is here.

(1) Review Incoming CPs ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/0_Incoming/

  • CP-ITI-JKV_MISSING_PREFIX.doc - reviewed and accepted as Completed CP 1046; ready for future Ballot 43
  • CP-ITI-LF-RemoveUserAuthRqmtfromITI-19.doc - reviewed and Assigned to Rob as CP 1047 who will propose text
  • CP-ITI-ExtraSigHandling.doc- reviewed and Assigned to John as CP 1048; proposed text needs a bit more review; will add to agenda for June 8 CP call
  • CP-ITI-CP-PIXvsPDQ.doc - reviewed and Assigned to Ben Levy as CP 1049; Ben's proposed wording needs further committee review and need to propose where to insert it into the TF
  • CP-ITI-ESL_Appendix_B_Cleanup.doc - reviewed and Assigned to Elliott L as CP 1050; Elliott will review the remainder of Appx B text to see if more document-specific text can be genericized.

(2) Assigned CPs ready for discussion ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/1_Assigned/

  • 1044-00 - Update Vol. 1, and Vol 2 Appendices to reflect RMD (Elliot S) - reviewed and identified that the changes need to be split between updates to RMD & XDS-TI; reassigned to Ken for add'l work
  • 989-03 - Clarify Required Query Parameter Error Codes (Ken) -reviewed as slightly updated; -04 accepted as Completed; ready for future Ballot 43
  • Out of time for these; deferred to June 8 call:
    • 1023-00 - Correct Volume 3 DocumentEntry.sourcePatientId (Ken)
    • 1043-00 - Need an actor that supports only ITI-18 as a client (Lynn)
    • 938-01 - Audit messages for ITI-30 and 31(Lynn)
    • 1022-00 - Specification of ITI-30 as optional transaction in PIX is incomplete (Lynn)

(3) Next in CPs

  • Comments/votes on CP Ballot 42 (FHIR-based Supps) due tomorrow
  • Two ballot 42 comment resolution calls next week:
    • Tues May 30 9-11 CDT
    • Thur June 1 10-noon CDT
  • Update from Lynn on moving to Jira to track ITI CPs

May 18, 2017 - Ballot 41 resolution

Attendees: Ben Levy (Corepoint Health), Elliott Lavy (Harris Healthcare), Gregorio Canal (arsenal.IT), Joe Lamy (Aegis/SSA), John Moehrke (By Light), Karen Witting (Ready Computing), Ken Meyer (Merge/IBM), Tarik Idris (ICW), Elliot Silver (Change HC), Jeremiah Myers, Lynn Felhofer

--> ITI CP Tracking Spreadsheet is here.

(1) CP Ballot 41 resolution

(2) Next in CPs

  • Next Thurs - regular CP call -- Assigned (focus on XD* CPs) and Incoming
  • Fri May 26 - votes/comments due on CP Ballot 42 (updates to FHIR-based supplements)

May 11, 2017

--> ITI CP Tracking Spreadsheet is here.

(1) Review Incoming CPs ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/0_Incoming/

  • CP-ITI-TI-APPC-add-OtherProviderIdentifiers.doc - reviewed & accepted as Completed CP 1042 for future CP ballot 43
  • CP-ITI-TI-APPC-ReferenceIDList-example-fixed.doc - reviewed & accepted as Completed CP 1041 for future CP ballot 43
  • CP-ITI-Add-ITI-18-onlyClientToXDS.doc - accepted (for now) as CP 1043 with TBD assignee. Notes below added to the Rationale for discussion on a future call:
    • Some discussion on this CP including a lot of questions. Attendees questioned whether this was really helpful, did it go far enough, feels weird to put an actor in XDS which would only be useful for other profiles.
    • Discussion ended with the thought that instead of adding a new actor it might be better to make it easier to add actors to the ITI-18 transaction. Noticed that this CP included adding the Actor Roles table to ITI-18, which would be the approach for making it easier to add actors to a transaction. So, it was the opinion of the attendees that this CP should be used to improve ITI-18 by adding the Actor Roles table which would make it easier to add new actors to the transaction, therefore making it easier for new profiles to use this transaction. (ie perhaps the initially-suggested changes to XDS are not necessary)
    • We did not discuss having someone assigned to work on it but felt the next step should be a follow-on discussion when Lynn is present.
  • CP-ITI-ELS-RMD-Vol-1-appendices.doc - Trying to understand whether this is presenting problems to be solved or a solution. concluded it is presenting problems to be solved. Deferred discussion of this until when Eliot S. is present. Assigned, for now, to Elliot Silver as CP 1044
  • Out of time; deferred to a future agenda:
    • CP-ITI-ESL_Appendix_B*
    • CP-ITI-CP-PIXvsPDQ.doc

(2) Assigned CPs ready for discussion ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/1_Assigned/

  • 985-07 - Relationship Assn Target in SubmSet (Elliott L) - briefly reviewed. The survey on implementers list indicates some enforce, some allow and johns conclusion was we don't need to have the new named option but can put in text getting away from option stuff. Agreed that Ken will look again at the feedback he has received but those on the call felt that moving forward without an option was the right thing to do and we would assess the impact of that during connectathon next season.
  • 1021-01 - Clarify ITI-42 Expected Actions For Folders During RPLC/XFRM_RPLC (Ken) - Reviewed proposed changes. Bill will do a detailed review and let Ken know about any recommended updates.
  • Out of time; deferred to a future agenda:
    • 989-01 - Clarify Required Query Parameter Error Codes (Ken)
    • 938-01 - Audit messages for ITI-30 and 31(Lynn)
    • 1022-00 - Specification of ITI-30 as optional transaction in PIX is incomplete (Lynn)

(3) Next in CPs

  • Wed May 17 - votes/comments due on CP Ballot 41
  • Thur May 18 - 10:00-noon - Ballot 41 resolution
  • Fri May 26 - votes/comments due on CP Ballot 42 (updates to FHIR-based supplements)

May 4, 2017

Attendees: Dmytro Rud (OeHF), Elliot Silver (Change HC), Joe Lamy (SSA), Karen Witting (Ready Computing), Ken Meyer (Merge/IBM), Tarik Idris, (ICW), Elliott Lavy (Harris/QuadraMed), Lynn Felhofer

--> ITI CP Tracking Spreadsheet is here.

(1) Finalize CP 1018 (Remove ITI-62 from XDS Metadata Update TI Supplement) from CP Ballot 40

(2) Discuss alternatives for publishing RMD and XDS-MU (together / separate)

  • The committee discussed several alternatives for making the changes to the XDS-MU-TI Supplement associated with 1018/RMD visible to the implementer community. We considered re-balloting CP-1018 containing a detailed summary of deltas to XDS-MU. We decided to:
    • Complete updates to CP-1018 so it accurately reflects/describes updates to XDS-MU due to RMD. (Ken)
    • Complete final (final!!) updates to RMD (Ken & ITI TC)
    • Ask Mary whether RMD can be published for TI along with all of the Final Text Volumes at TI Suppls that are updated by CPs this cycle. Those will be published on ihe.net at the end of July (Lynn)
    • If Mary says, yes, dot all of the "i"s and cross all of the "t"s with regard to publication steps (Lynn)
    • Coordinate an announcement to the implementer community that explains RMD and XDS-MU as they will be published this year. (Lynn)

(3) Next in CPs

  • Thu May 11 - Karen will chair next week's call. We will tackle the backlog of Assigned CPs ready for discussion, and Incoming
  • Wed May 17 - votes/comments due on CP Ballot 41
  • Fri May 26 - votes/comments due on CP Ballot 42 (updates to FHIR-based supplements)

Apr 24-28 2017 CPs during ITI TC F2F in Oak Brook

See notes on TF Maintenance topics during the ITI F2F meeting in Oak Brook here.

Apr-20-2017

Attendees: Dmytro Rud (OeHF), Elliot Silver (Change HC), Rob Horn (Agfa), Joe Lamy (SSA), Elliott Lavy (Harris Computing), Tarik Idris (ICW), Karen Witting (Ready Computing), John Moehrke, Lynn Felhofer

--> ITI CP Tracking Spreadsheet is here.

(1) Review Incoming CPs ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/0_Incoming/

  • CP-ITI-Moore-Move-FHIR-Security-Considerations.doc - accepted and Assigned to John M as CP 1036; actual resolution of this CP will be decided at next week's F2F
  • CP-ITI-ESL_Length_Enforcement.doc - accepted and Assigned to Elliott L as CP 1037
  • CP-ITI-TS-ITI-40doubleQuotes.docx - accepted and Assigned to John M as CP 1038
  • CP-ITI-ESL_Appendix_B_Cleanup.doc - out of time; remains in Incoming

(2) Assigned CPs ready for discussion ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/1_Assigned/

  • 985-07 - Relationship Association Target in SubmissionSet (Elliott L) - this CP addresses a use case brought forward by France and is driven by existing text in DSG. The current CP proposes adding an option on the Registry. We are deferring further discussion to the F2F when we will have representation from France, John M (DSG editor) and fuller committee representation.
  • 1026-01 - Correct ITI-18 references to missing TF-3 sections (Elliott L) - reviewed; changes scaled back to fixing the section references, acknowledging that further changes are needed in ITI-18 overall (redoc effort) that are out of scope for this CP. Approved as Completed and ready for ballot
  • 624-03 - Appendix V needs update to reference recent standards (Elliott L) - reviewed and accepted as Completed and ready-for-ballot
  • 974-01 - TLS version update (Rob) - briefly discussed; will be added to next week's F2F agenda for further consideration
  • Out of time to discuss these:
    • 1022-00 - Specification of ITI-30 as optional transaction in PIX is incomplete (Lynn)
    • 938-01 - Audit messages for ITI-30 and 31 (Lynn)

(3) Next in CPs

  • Apr 21- May 17 - CP Ballot 41 with all Completed CPs will go out tomorrow
  • Apr 24-28 - TF Maintenance time during the ITI Tech Cmte face-to-face in Oak Brook
  • Ballot with changes to FHIR-based supplements will go out in early May after the F2F.

Apr-13-2017 - Ballot 40 resolution

Attendees: Bill Majurski (NIST), Elliot Silver (Change HC/McKesson), Elliott Lavy (Harris/QuadraMed), Joe Lamy (SSA), John Moehrke, Karen Witting (Ready Computing), Ken Meyer (Merge/IBM), Lynn Felhofer

--> ITI CP Tracking Spreadsheet is here.

(1) Ballot 40 contents & comments

(2) Review Incoming CPs ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/0_Incoming/

  • CP-ITI-ESL_UniqueId_In_Relationships.doc - reviewed and accepted as Completed - CP 1034 is ready for future ballot 41
  • CP-ITI-KM_Volume_3_Correct_Submission_Request.doc - reviewed and accepted as Completed - CP 1035 is ready for future ballot 41

(3) Assigned CPs ready for discussion ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/1_Assigned/

  • 923-09 - Redoc aggressive validation specification (Elliott L) - reviewed and accepted as Completed; ready for future ballot 41

(4) Next in CPs

  • Apr-17 - 10am CDT - next call to continue work on updating FHIR-based profiles to STU3
  • Apr-20 - regular CP call
  • Apr 24-28 - TF Maintenance time during the ITI Tech Cmte face-to-face in Oak Brook

Apr-6-2017 - No CP call - EU Connectathon

Mar-30-2017 - Mobile bundle

--> ITI CP Tracking Spreadsheet is here.

(1) Moving forward on DSTU2-->STU3 updates to ITI profiles

Mar-23-2017 - Mobile bundle

Attendees: Elliot Silver (Change HC/McKesson), Joe Lamy (SSA), Dmytro Rud (OeHF), Ken Meyer (Merge/IBM), John Moehrke (By Light), Ben Levy, (Corepoint Health), Elliott Lavy, (Harris/QuadraMed), Daniel Toropila, Lynn Felhofer

--> ITI CP Tracking Spreadsheet is here.

(1) Moving forward on DSTU2-->STU3 updates to ITI profiles

(2) (If time...) Assigned CPs ready for discussion ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/1_Assigned/

  • Non-mobile Assigned CPs ready for discussion
    • 1019-01 - Clarify Repository action required on duplicate uniqueId (Elliot S) -- discussion was deferred; Elliott Lavy has suggested changes in email and we will review them in a future CP call
    • 937-10 - DSUB - corrections for audit messages (Ken M) - Ken has received input from John and Rob on a few remaining open items; there is one more revision coming, and we will review at a future call and anticipate that this will then be ready for ballot
    • Deferred to a future call:
      • 1022-00 - Specification of ITI-30 as optional transaction in PIX is incomplete (Lynn)
      • 938-01 - Audit messages for ITI-30 and 31 (Lynn)

(3) (If time...) Process Incoming CPs ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/0_Incoming/

  • CP-ITI-KM-Update_Creating_Coded_Attributes.doc - reviewed and accepted as CP 1032 - Completed & ready for ballot
  • CP-ITI-TPA_correct_atna_for_dsub.doc (already in 937) -- rejected; change is already included in CP 937 which will soon be ready for ballot
  • CP-ITI-LF-AddGroupingSectionToOldProfiles.doc -- assigned to Lynn as CP 1033. She will investigate what is feasible and come back to the Tech Cmte with a recommendataion

(4) Next in CPs

  • On the March 30 call, we plan to review John's updates to MHD and PDQm.
  • If updates to other FHIR-based supplements are ready, they will be added to the agenda

Mar-16-2017 - Ballot 39 resolution and Incoming

Attendees: Bill Majurski (NIST), Ben Levy (Corepoint Health), Elliott Lavy (Harris/QuadraMed), Elliott Silver (Change HC/McKesson), Gregario Canal (Arsenal IT), Loe Lamy (SSA), Karen Witting (Ready Computing), Ken Meyer (IBM/Merge), Nader Cheaib (ASIP Sante), Rob Horn (Agfa), Tarik Idris (ICW), Daniel Toropila, Dmytro Rud (OeHF), John Moehrke (By Light), Lynn Felhofer

--> Updated ITI CP Tracking Spreadsheet is here.

(1) Ballot 39 contents & comments

  • Comments and No votes were discussed. Eight of nine CPs were moved to Final Text status and are stored here.
  • Resolution for each CP and associated comments are recorded here.

(2) Process Incoming CPs ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/0_Incoming/

  • Incoming Vol 2a, 2b CPs:
    • CP-ITI-ELS-XDS Repository-action-on-duplicate-uniqueID.doc --> Assigned to Elliot S as CP 1019; added to queue of Assigned CPs ready for discussion (wording was close but needed further refinement at a future call w/ more time)
    • CP-ITI-ELS-Remove-temporary-XCA-restriction.doc --> accepted as CP 1020; Completed and ready for future ballot. The committee agreed that expanding support on the query request to support more than one homeCommunityId is bigger than a CP and would need to be a future work item.
    • CP-ITI-DT-Reference-to-non-existing-sections-4 1 7-9.doc --> editorial fix; assigned to Elliott Lavy as CP 1026
    • CP-ITI-DF-ITI-18-ITI-51auditMsg.doc --> rejected as duplicate of CP 999 which is currently assigned to Ken M
    • CP-ITI-KM-Clarify-ITI-42-RPLC-Folder_Actions.doc --> Assigned to Ken as CP 1021
    • CP-ITI-LF-FixITI-30SspecificationInPIX.doc --> Assigned to Lynn as CP 1022; added to queue of Assigned CPs ready for discussion
    • CP-ITI-KM-Guidance_for_ParticipantObjectType.doc -- CP was discussed and rejected guidanance to Ken is to use long form as proposed for RMD; general guidance will come from Rob’s CP 806
  • Incoming Vol 3 CPs:
    • CP-ITI-KM-Correct_Vol3-sourcePatientId.doc --> Assigned to Ken as CP 1023
    • CP-ITI-KM-Vol3_Navigation_Cleanup.doc --> this is an editorial fix to be attended to during publication; will not be balloted; assigned to Lynn as CP 1024; Instant Final Text to ensure this is corrected when Vol 3 is repoublished
    • CP-ITI-BM-OneSubmissionSetPerITI-41.doc --> CP is withdrawn; Bill agrees the change is not needed (ref in ITI-42 to Vol 3 is sufficient)
  • Incoming Vol 2x CPs:
    • CP-ITI-ELS-Charset-support.doc --> Assigned to Elliot Silver as CP 1025
    • CP-ITI-JV_XDSReposWSDL.doc --> not accepted as a CP because we don't CP wsdl. Ken agreed to make the suggested fix to the WSDL on the ftp site
  • Incoming Metadata Update CPs:
    • CP-ITI-ELS-MU-Remove-OnDemand.doc --> editorial fix; no need to ballot; CP 1027 Instant Final Text
    • CP-ITI-KM-MU_Add_Requirements_For_Propagating_SS-HM...doc --> assigned to Ken as CP 1028 (in consultation w/ Bill)
    • CP-ITI-KM-MU-Clarify_Association_Operation_Requirements.doc --> assigned to Ken as CP 1029
    • CP-ITI-KM-MU-Clarify_Propagating_Relationship_Associations.doc--> assigned to Ken as CP 1030
    • CP-ITI-KM-Reconcile XPID and MU Language.doc--> assigned to Ken as CP 1031

(3) Next in CPs

  • For the next two weeks, we will focus on review of updates to the mobile profiles

Mar-9-2017 - XDS bundle

Attendees: Elliott Lavy (Harris/QuadraMed), Bill Majurski (NIST), Ken Meyer (IBM/Merge), Dmytro Rud (OeHF), Karen Witting (Ready Computing), Daniel Toropila, Elliot Silver (Change HC/McKesson), John Moehrke (By Light), Mark Sinke (Forcare), Tarik Idris (ICW), Joe Lamy (SSA), Lynn Felhofer

--> ITI CP Tracking Spreadsheet is here.

(1) Assigned CPs ready for discussion ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/1_Assigned/

  • CP-ITI-1018-02 and IHE-ITI-Supp_XDS_Metadata...RMD-Ver02.docx - Remove ITI-62 from XDS Metadata Update TI Supplement (Ken) - The rationale needs to be updated to include a list of technical changes and an explanation of using word change tracking to represent changes, and an explanation of how this is dependent on publishing RMD for TI. After Karen reviews Ken's updates, Lynn will construct Ballot 40 and send it out so it can be reviewed in parallel with RMD public comment.
  • CP-ITI-1017-03 - Fix ambiguity in Vol 3 Sec 4.2.3.1.1 'Attribute Value Length' (Ken) - this was discussed and informative text was crafted. The CP is now Completed and ready for ballot. Ken will write a separate CP as a spin-off.
  • CP-ITI-1010-00 - Align supplementary info for InvalidDocumentContent error (Elliot S) - this change was reviewed and accepted as Completed and ready for ballot. A new CP addressing a broader issue will be submitted to Incoming

(2) Process Incoming CPs ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/0_Incoming/

  • Out of time to discuss these; deferred to next week if we have time after ballot resolution
    • CP-ITI-KM-Correct_Vol-sourcePatientId.doc (Ken)
    • CP-ITI-KM-Clarify-ITI-42-RPLC-Folder_Actions,doc (Ken)
    • CP-ITI-KM-Vol3_Navigation_Cleanup.doc
    • CP-ITI-BM-OneSubmissionSetPerITI-41.doc
    • CP-ITI-JV_XDSReposWSDL.doc
    • CP-ITI-LF-FixITI-30SspecificationInPIX.doc
    • CP-ITI-ELS-MU-Remove-OnDemand.doc
    • CP-ITI-ELS-Remove-temporary-XCA-restriction.doc
    • CP-ITI-ELS-XDS Repository-action-on-duplicate-uniqueID.doc
    • CP-ITI-DT-Reference-to-non-existing-sections-4 1 7-9.doc

(3) Next in CPs

  • Ballot 39 comments due March 14
  • Next week's call will be two hours to ensure enough time for Ballot 39 resolution.
  • After that, we switch to the Mobile bundle; Lynn needs to follow-up with John M.

Mar-2-2017 - XDS Vol 2/3 bundle

Attendees: Elliott Lavy (Harris/QuadraMed), Karen WItting (Ready Computing), Ken Meyer (Merge/IBM), Dmytro Rud (Open eHealth Foundation--OeHF), Joe Lamy (SSA), Gregorio Canal (Arsenal IT), Ben Levy (Corepoint Health), Elliot Silver (McKesson), Tarik Idris (ICW), Lynn Felhofer

--> ITI CP Tracking Spreadsheet is here.

(1) Assigned CPs ready for discussion ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/1_Assigned/

  • CP-ITI-1018 - Remove ITI-62 from XDS Metadata Update TI Supplement
    • Ken will prepare changes for this CP for review on next week's call
    • The goal is to get this CP out for ballot ASAP after that call so that the CP can be reviewed in parallel with the Public Comment for the RMD profile
    • The committee agreed that it is desirable to publish both the new RMD TI Supplement and the updated version of XDS Metadata Update (XDS-MU) TI Supplement (updated by CPs) at the same time. This might mean publishing both RMD and XDS-MU with integrated CPs after the July F2F. We would have to ask Mary to defer repub of XDS-MU until Aug/Sep (rather than end of July), but we don't anticipate a problem with this.
    • The ITI TC will determine the precise timing of the 1016 ballot and its affect on RMD public comment and publication at a later date (after we know when 1016 will be balloted)
  • CP-ITI-1017-01 - Fix ambiguity in Vol 3 Sec 4.2.3.1.1 'Attribute Value Length' (Ken)
    • The committee discussed alternatives for resolving this CP. The committee determined that this section heading should be changed to 'intentionally left blank' and the contents of the section deleted ie the equivalent of deleting the section. Will also need to review sourcePatientInfo to determine if a parallel update is needed.
  • CP-ITI-1016 - Clarify Extra Metadata Attributes Section
    • This CP was discussed.
  • CP-ITI-1010-00 - Align supplementary info for InvalidDocumentContent error (Elliot S)
    • Out of time for this CP; deferred until March 9

(2) Process Incoming CPs ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/0_Incoming/

  • Out of time for these; deferred to March 9 call
    • CP-ITI-KM-Clarify-ITI-42-RPLC-Folder_Actions,doc (Ken)
    • CP-ITI-BM-OneSubmissionSetPerITI-41.doc
    • CP-ITI-JV_XDSReposWSDL.doc
    • CP-ITI-LF-FixITI-30SspecificationInPIX.doc
    • CP-ITI-KM-Vol3_Navigation_Cleanup.doc

(3) Next in CPs

  • Ballot 39 comments are due March 14
  • Next Thursday's call is targeted at Security, but there were many topics deferred from this call
  • We will first discuss CP 1018 (Remove ITI-62 from XDS Metadata Update TI Supplement). Need Security CPs to be submitted for discussion; otherwise, we will entertain other topics.

Feb-23-2017

Attendees: Dmytro Rud Open eHealth Foundation--OeHF), Elliot Silver (McKesson), Elliott Lavy (QuadraMed/Harris), Michael Hager, Gregario Canal (Arsenal.IT), Joe Lamy (SSA), John Moehrke, Karen Witting (Ready Computing), Ken Meyer (Merge/IBM), Tarik Idris (ICW), Lynn Felhofer

--> ITI CP Tracking Spreadsheet is here.

(1) Assigned CPs ready for discussion ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/1_Assigned/

  • CP-ITI-997-01 - Allow multiple entries for each PID field in sourcePatientInfo (Dmytro)
    • reviewed; slightly updated to create -02. Lynn to send to Bill for review; if he approves, then this CP is Completed, ready for ballot 40 (future)
    • review of this CP revealed ambiguity in Vol 3 section 4.2.3.1.1. This will be addressed in a separate CP 1017 assigned to Ken
  • CP-ITI-1016-00 - Clarify Extra Metadata Attributes Section (Ken)
    • the group reviewed/updated the content to produce version -01 of the CP. Lynn to send to Bill for review; if he is happy with the text, this CP can be marked 'Completed'.
  • Out of time to discuss this one. Moved to Mar 2 CP call.
    • CP-ITI-1010-00 - Align supplementary info for InvalidDocumentContent error (Elliot S)

(2) Process Incoming CPs ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/0_Incoming/

  • Out of time to discuss these. Moved to Mar 2 CP call.
    • CP-ITI-KM-Clarify-ITI-42-RPLC-Folder_Actions,doc (Ken)
    • CP-ITI-JV_XDSReposWSDL.doc
    • CP-ITI-LF-FixITI-30SspecificationInPIX.doc

(3) Next in CPs

  • March 2 - focus is on XDS Vol 2/3 bundle
  • March 9 - focus is on Security & Security Audit bundle
  • March 14 - Ballot 39 votes/comments due

Feb-16-2017 Process Incoming & Misc Assigned

Attendees: Elliott Lavy (Harris/QuadraMed), Gregorio Canal (Arsenal IT), Dolph Chaney, John Moehrke (Moehrke Research), Karen Witting (Ready Computing), Ken Meyer (Merge IBM), Mark Sinke (Forcare), Robert Horn (Agfa), Bill Majurski (NIST)

--> ITI CP Tracking Spreadsheet is here.

(1) Assigned CPs ready for discussion ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/1_Assigned/

  • CP-ITI-1001-01 - Document the XML namespace and prefix for XCDR (Elliott L) - reviewed; updated; -02 approved as Completed
  • CP-ITI-839-04 - Clarify XPID audit messages (Ken) - Mark will review the extensive changes in this CP and coordinate any recommended updates with Ken; then, the CP will be Completed and ready for ballot
  • CP-ITI-999-01 - Make ITI-51 audit scheme conformant with DICOM (Ken) - reviewed; updates identified; -02 approved as Completed pending edits identified
  • CP-ITI-1010-00 - Align supplementary info for InvalidDocumentContent error (Elliot S) - out of time; deferred to next week.

(2) Process Incoming CPs ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/0_Incoming/

  • CP-ITI-KM-Clarify-ITI-42-RPLC-Folder_Actions,doc (Ken) - out of time; deferred to next week.
  • CP-ITI-KM-ClarifyExtraMetadata.doc (Ken) - Assigned to Ken Meyer as CP 1016; will be reviewed in detail next week
  • CP-ITI-Forcare-XCDR-Auditing-of-homeCommunityID.doc - Assigned to Mark SInke as CP 1014
  • CP-ITI-DR-XCN-in-LDAP.doc - reviewed and accepted as Completed CP 1015
  • CP-ITI-JV_XDSReposWSDL.doc - out of time; deferred to next week.

(3) Next in CPs

Focus of future CP calls:

  • Feb 23 - if needed Incoming/Assigned else XDS Vol 2/3
  • Mar 2 - XDS Vol 2 & 3
  • Mar 9 - Security & Security Audit
  • Mar 16 - Ballot 39 resolution
  • Mar 23 - mobile
  • Mar 30 - mobile
  • Apr 6 - no call - EU Connectathon

Ballot 39 dates:

  • Feb 12 - Ballot 39 announcement
  • Mar 14 - Votes/comments due
  • Mar 16 - Ballot 39 resolution t-conn

Feb-F2F-2017

CP topics during the Naples F2F, notes, etc are here: http://wiki.ihe.net/index.php/ITI_Agenda_2016-2017#February_2017_F2F_.E2.80.93_Volume_One_Finalization_Meeting_6-10_February_2017

Feb-2-2017 - Ballot 38 resolution

Attendees: Bill Majurski (NIST), Ken Meyer (Merge/IBM), Joe Lamy (SSA), John Moehrke (Moehrke Research), George Varghese, Elliott Lavy (Harris/QuadraMed), Uwe Meyer (MT2IT), Mark Sinke (Forcare), Karen Witting (Ready Computing), Lynn Felhofer

--> ITI CP Tracking Spreadsheet is here.

(1) Ballot 38 details

(2) (out of time; deferred to F2F) Review Incoming CPs ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/0_Incoming/

  • CP-ITI-TI-clarify-NPI-in-XUA.doc
  • CP-ITI-RS-ITI-10-PIDsegment
  • CP-ITI-Forcare-XCDR-Auditing-of-homeCommunityID.doc
  • CP-ITI-JV_XDSReposWSDL.doc
  • CP-ITI-JM-TooMany.doc
  • CP-ITI-LF-PDQmCase3ReturnCode.doc

(3) Next in CPs

  • CPs are on the agenda for the F2F. Lynn has prepared input to 'blitz' activities. If there are non-blitz CP topics that you'd like addressed, send them to Lynn so they can be added to the CP-specific agenda.
  • After the F2F, Lynn will compile all Completed CPs into ballot 39, likely the last one prior to the EU Connectathon.

Jan-26-2017 - NO CP CALL - NA Connectathon

Jan-19-2017 - XDS Bundle

Chaired by: Karen Witting

--> ITI CP Tracking Spreadsheet is here.

(1) Review Assigned XDS-related CPs ready for discussion ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/1_Assigned/

  • 973-03 - Association Names (Elliott L) -reviewed the tables and consistency across the tables. Made another minor editorial changes. Version from review is ready for ballot. -05 version is in assigned and ready for ballot

(2) Process Incoming CPs ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/0_Incoming/

  • CP-ITI-Repeatable_PID-3_in_sourcePatientINfo-DmytroRud.doc - discussion of the proposal and concern that consumers may be confused by multiple PID-3 values. Suggest more text in the PID-3 bullet point. Discussion of which entitites allow for multiple elements. Decided to accept the CP. recommending some changes to the text. Dmytro will make changes suggested. Assigned as CP 997 to Dmytro
  • CP-ITI-JV_XDSReposWSDL.doc - requesting a fix to content in the ftp site. Jens will provide an update version of the wsdl to Lynn who will enable it being updated in the ftp site. (Karen can help if needed). Reject this CP as a CP is not needed to update the ftp site.
  • (if time) CP-ITI-LF-EVNsegment.docx - Assigned to Ben Levy as CP 1000
  • CP-ITI-PP-ITI51_audit_scheme.doc- Assigned to Ken as CP 999 who will make a small change and plan to review on next security call.
  • CP-ITI-JE-UpdateITI-8AuditMsg.docx - changed the M to a U. Accepted as Completed CP-998 is ready for ballot
  • Out of time -- deferred to a future CP call
    • CP-ITI-TI-clarify-NPI-in-XUA.doc

(3) Next in CPs

  • No call next week Thurs 26 due to NA Connectathon.
  • Ballot 38 comments due Jan 30.
  • Ballot 38 resolution call on Feb 2 will be 2 hours long.

Jan-12-2017 - XDS Bundle

Attendees: Ben Levy (Corepoint Health), Bill Majurski (NIST), Dmytro Rud (OeHF), Elliot Silver (McKesson), Elliott Lavy (QuadraMed/Harris), Karen Witting (Ready Computing), Ken Meyer (Merge/IBM), Nick Radov (Optum), Tarik Idris (ICW), Lynn Felhofer

--> ITI CP Tracking Spreadsheet is here.

(1) Process Incoming CPs ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/0_Incoming/

  • CP-ITI-KM-Clarify Required Query Parameter Error Codes.doc - accepted and assigned to Ken as CP-ITI-989
  • CP-ITI-KM-GetFoldersCleanup.doc - accepted as Completed -- CP-ITI-990
  • CP-ITI-ESL_SubmissionSet_UniqueId.doc - accepted as Completed -- CP-ITI-991
  • CP-ITI-ESL_DEN_XDM.doc - Elliott proposed textual changes that may be complete, but they need John's review as the DEN editor. For now, this CP), with proposed edits, is assigned to John M as CP-ITI-992. If he agrees with the changes, it can be moved to status Completed.
  • CP-ITI-XCF_Parameters_AND_OR_Semantics_DmytroRud.doc - accepted as Completed -- CP-ITI-993
  • CP-ITI-NOR_increase_DocumentEntry_uniqueId_length.doc - assigned to Nick Radov as CP-ITI-994. This is related to another Assigned CP and both should be resolved/balloted together. Elliot Silver volunteered to find that CP so they can cross-reference each other.
  • CP-ITI-TI-align entryUUID-descriptions.doc - discussed; suggestions for a few changes; assigned to Tarik as 995
  • CP-ITI-KM-Table V.2.4.1...doc - accepted as Completed -- CP-ITI-996
  • Out of time for these: deferred to a next week's agenda
    • (if time) CP-ITI-LF-EVNsegment.docx
    • (if time) CP-ITI-PP-ITI51_audit_scheme.doc
    • (if time) CP-ITI-TI-clarify-NPI-in-XUA.doc

(2) Review Assigned XDS-related CPs ready for discussion ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/1_Assigned/

  • 985-00 - Signature with Signed Document (Elliott L) - discussed; direction received from the committee and Bill; remains assigned to Elliott
  • 986-00 - Removal of profiling on error codes (Bill) - discussed; direction received from the committee; remains assigned to Bill
  • 973-03 - Association Names (Elliott L)

(3) Next in CPs

  • We continue with XDS-related CPs next Thurs
  • CP Ballot 38 comments due Jan 30

Jan-5-2017 - XDS Bundle

Attendees: Elliot Silver (McKesson), Bill Majurski (NIST), Karen Witting (Ready Computing), Dmytro Rud (Open eHealth Foundation--OeHF), Joe Lamy (SSA), Elliott Lavy (Harris/Quadramed), Ken Meyer (Merge/IBM), Rob Horn, (Agfa), Lynn Felhofer

--> ITI CP Tracking Spreadsheet is here.

(1) Review Assigned XDS-related CPs ready for discussion ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/1_Assigned/

  • 923-04 - Redoc aggressive validation specification (Ken, Bill) - this CP was the topic of the entire discussion. Updates were made reflected in -05. Additional edits coming to version -05 Sec 4.2.3.1.6 to simplify the currently-proposed updates.
  • Out of time to discuss these; moved to Jan 12 agenda

(2) Next in CPs

  • We continue our focus on the XDS bundle for the next two Thursdays
  • Ballot 38 comments due Jan 30

Dec-29-2016 Incoming & Misc Assigned

Attendees: Tarik Idris (ICW), Dmytro Rud (Open eHealth Foundation (OeHF)), Elliott Lavy (Harris/QuadraMed), Ken Meyer (Merge/IBM), Karen Witting (Ready Computing), Bill Majurski (NIST), Lynn Felhofer

--> ITI CP Tracking Spreadsheet is here.

(1) Review Assigned CPs ready for discussion ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/1_Assigned/

  • These were reviewed:
    • 794-02 - Update DICOM hyperlinks for audit message specification (Elliott L) - version -03 approved for ballot 38
    • 765-14 - Metadata Update Queries with MU level not set/set to 1 (Ken) - reviewed & updated new advisory text about Consumers supporting $MetadataLevel=1. Version -15 approved for ballot 38.
    • 402-07 - ATNA Encoding of Local Process Identifier not consistent (Elliott L) - Elliott proposes that this CP be cancelled and has updated the Rationale accordingly. Lynn will send this CP with the Rationale to Mark Sinke to get confirmation that Canceling is ok.
    • 973-02 - Association Names (Elliott L) - this was reviewed and updated; discussion not complete so will be continued at a January CP call
  • Out of time for these; deferred to future CP calls
    • 968-02 - Fix optionality for AlternativeUserId field in SeR audit messages - revisit this CP that was approved last week.
    • 975-00 - Add reference to HL7v3 feed in description merge for Registry (Lynn)
    • 978-00 - MHD Documents encoding in XDW task output/input (Mauro)

(2) Process Incoming CPs ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/0_Incoming/

  • These were reviewed:
    • CP-ITI-Bill-no_restrictions_on_error_codes.doc - assigned to Bill as CP 986, will be discussed at a Jan CP call.
    • CP-ITI-LF-PDQm-RemoveUnneededSentence.docx - CP 987 approved for ballot 38
    • CP-ITI-LF-PDQmTwoDiffErrorCodesForSameCondition.docx - CP 988 approved for ballot 38
  • Out of time to discuss these. Deferred to Jan 5.
    • CP-ITI-ESL_SubmissionSet_UniqueId.doc
    • CP-ITI-ESL_DEN_XDM.doc
    • CP-ITI-KM-Clarify Required Query Parameter Error Codes.doc
    • CP-ITI-KM-GetFoldersCleanup.doc
    • CP-ITI-EVNsegment.docx

(3) Next in CPs

Dec-15-2016 - Security Bundle

Attendees: Elliott L (QuadraMed/Harris) John M (Moehrke Research), Elliot S (McKesson), Ken M (Merge/IBM), Lynn F

--> ITI CP Tracking Spreadsheet is here.

(1) Review Assigned Security CPs ready for discussion ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/1_Assigned/

  • 824-01 - Display name for audit event 110114 borrowed from DICOM is inconsistent with DICOM display name (Lynn, was Rob) - changes reviewed; approved for future Ballot 38
  • 968-00 - Fix optionality for AlternativeUserId field in SeR audit messages (Rob) - discussed, updated, and approved for future Ballot 38
  • 356-05 - XDM - Metadata file digitally signed - discussed and agreed to moved to Cancelled!!
    • Rationale for Cancel: IHE has subsequently provided 2 solutions to address this problem. The DEN profile updates ITI-32 and the updated DSG profile is also applicable.
  • 794-00 - Update DICOM hyperlinks for audit message specification (Rob) -- We discussed whether we should do this. The group said 'yes' and identified the scope of the changes needed. Re-assigned to Elliott Lavy who will bring an updated CP to a future call for final blessing before balloting.
  • 402-05 - ATNA Encoding of Local Process Identifier not consistent (Rob) -- We reviewed this old CP. Elliott Lavy agreed to update the rationale and scope section. These are editorial changes so this CP is a good candidate to be re-assigned to someone else on the committee....there may be a Connectathon security monitor interested in helping with CPs.
  • 839 - Clarify XPID audit messages - Ken agreed to take this CP from Rob and update it based on recent email exchange w/ John
  • 938-01 - Audit message for ITI-30 and ITI-31 (Lynn) - discussion on this one is deferred to a future CP call when there is an HL7v2 expert that John can consult with

(2) Review new Incoming Security-related CPs ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/0_Incoming/

  • CP-ITI-ESL-_Signature_with_Signed_document.doc - assigned to Elliott L as CP 985; will need direction from Bill to determine the direction to go with this one. Added to the agenda for the Jan 5 call focused on the XDS bundle

(3) Next in CPs

  • Dec 22 - no CP call
  • Dec 29 - Process Miscellaneous and Incoming; CPs completed as of this call will go into January ballot 38
  • The CP calls for first three Thursdays in January are focused on CPs in the XDS bundle.

Dec-8-2016 - Security Bundle

Attendees: Tarik I (ICW), Elliott L (Harris/QuadraMed), Elliot S (McKesson), John M (Moehrke Research), Ken M (Merge/IBM), Massi M (Tiani Spirit), George Varghese, Lynn

--> ITI CP Tracking Spreadsheet is here.

(1) Review Assigned Security CPs ready for discussion ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/1_Assigned/

  • 907-02 - IUA Maintenance and alignment with FHIR initiatives (Massi & John)
    • this CP was discussed, Massi will do another pass through the profile to make a few updates discussed and to remove word comments; the CP needs to be reviewed to ensure that the markup follows CP conventions. After that, this CP can be marked Completed for Ballot 38 (future)
    • We discussed convening IUA-interested developers prior to the EU Connectathon to discuss further discuss the specification of client_id w/in IUA and in conjunction with Connectathon testing. Lynn will facilitate this in Feb 2017.
  • 937-07 - DSUB - Corrections for audit messages (Ken)
    • reviewed, updated per comments, approved as Completed for Ballot 38 (future)
  • 920-00 - Fix Section Ref in Audit Event table in ITI-20 (Rob)
    • reviewed, updated, Lynn will update the rationale based on today's discussion; approved as Completed for Ballot 38 (future)

(2) Review new Incoming Security-related CPs ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/0_Incoming/

  • CP-ITI-DR-Updates-to-CP-ITI-810-MU-Security-Considerations.doc
    • We ran out of time to discuss this, but after the call Ken said he would take it, and we never turn down a volunteer!! It is assigned to Ken as CP-ITI-984

(3) Next in CPs

  • Dec 15 - We continue our focus on Security-related CPs next week. See agenda; additions encouraged.
  • Dec 22 - no CP call
  • Dec 29 - Process Miscellaneous and Incoming

Dec-1-2016 Incoming & Misc Assigned

Attendees: Elliott L (Harris/QuadraMed), John M (Moehrke Research), Karen W (Ready Computing), Ken M (Merge/IBM), Tarik I (ICW), Lynn F

(1) Review Assigned CPs ready for discussion ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/1_Assigned/

  • 969-01 - Allow Documentation on all Relationship Associations (Elliott L) - approved as Completed; ready for Ballot 38
  • 972-02 - Clarification of Chained Associations (Elliott L) - CP title and rationale updated; approved as Completed; ready for Ballot 38
  • 973-01 - Association names (Elliott L) - this was discussed; Elliott received guidance on changing references to the association to 'Signs'; Elliott will update the CP and bring it back for review at a future call
  • 971-01 - Clarify XDSResultsNotSinglePatient Error application (Ken) - approved as Completed; ready for Ballot 38
  • 949-01 - Clarify Folder.lastUpdateTime (Tarik) - approved as Completed; ready for Ballot 38
  • Out of time to discuss these; deferred to Dec 29 CP call
    • 765-13 - Metadata Update Queries with MU level not set/set to 1 (Ken)
    • 978-00 - MHD Documents encoding in XDW task output/input (Mauro)
    • 975-00 - Add reference to HL7v3 feed in description merge for Registry (Lynn)

(2) Process Incoming CPs ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/0_Incoming/

  • CP-ITI-MU_Dangling_Associations.doc - submitted by and assigned to Bill as CP-ITI-980
  • CP-ITI-MU_id_format.doc - submitted by and assigned to Bill as CP-ITI-981
  • CP-ITI-MU_trigger_documentation.doc - submitted by and assigned to Bill as CP-ITI-982
  • CP-ITI-KM-DataType-SourcePatientInfo.doc - reviewed and approved as Completed; ready for Ballot 38 as CP-ITI-983
  • Out of time to discuss these; deferred to Dec 29 CP call
    • CP-ITI-KM-Clarify Required Query Parameter Error Codes.doc
    • CP-ITI-KM-GetFoldersCleanup.doc

(3) Next in CPs

  • Focus on Security on Dec 8 and 15. Massi is available to participate these calls. TC members with assigned CPs are invited to propose CPs for discussion.

Nov-4 and Nov-9 2016 (MU Ballot resolution)

Nov 4 Attendees: Bill M (NIST), Elliott L (Harris/QuadraMed), Karen W (Ready Computing), Tarik I (ICW), John M (By Light), Elliot S (McKesson), Joe Lamy, Lynn F

Nov 9 Attendees: Ken M (Merge/IBM), Karen W (Ready Computing), Bill M (NIST), Elliott L (Harris/QuadraMed), Gregorio Canal (Arsenal-IT), John Moehrke , Lynn F

(1) Resolve CP Ballot 37 comments/votes

  • Find Ballot 37 CPs here: ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/Ballots/2017/Ballot_37/
  • Consolidated comments/votes are gathered: https://docs.google.com/spreadsheets/d/1ReN0t3cQ9AwfI8m0xkFtu1S3IWjuaVcksgSWvCokOAw/edit
    • Discussed on Nov 4:
      • 559 - text was updated based on submitted comments. After the meeting, Elliot Silver's confirmed that the new wording addresses his comments adequately and he withdrew his no vote.. version -05 is approved for Final Text.
      • 765 - discussion resulted in significant updates to Sec 3.18.4.1.2.3.5.1.1 "MetadataLevel parameter"; before Nov 9 Lynn will be making editorial updates to address footnote numbering under Stored Query tables, and Elliott L will investigate the proper home for a note currently in Sec 3.18.4.1.2.3.5.1.1
      • 810 - CP was updated based on Elliot's comments, with approval from John. version -06 is approved for Final Text
    • Discussed on Nov 9:
      • 939 - updated per ballot comments; discussed some opportunities to improve text that this CP moves from Vol 3 to Vol 2, but decided against doing so. There are many opportunities for this kind of redocumentation throughout the MU Supplement, and that is outside of the scope of this CP. Version -06 approved for Final Text.
      • 962 - updated per ballot comments; version 01 approved for Final Text
      • 965 - minor update, but some comments of an editorial nature were rejected. Clean-up type issues are not being done in the context of this CP. They are deferred to a yet-to-be planned (or decided on) redoc effort for XDS-MU content
      • 966 - No discussion needed. version -00 is approved for Final Text
      • 967 - diagram fixed per comment; version -01 is approved for Final Text
      • 765 - content was updated per ballot comments. The updates included one change that the group agreed needs to be re-ballot. In addition, there are many editorially fussy/complex changes associated with updates to tables and footnotes in the ITI-18 transaction. The group agreed to re-ballot an updated version of this CP.

(3) Next step for MU CPs

  • All CPs in this ballot except for 765 are approved for Final Text. See summary here: http://wiki.ihe.net/index.php/ITI_Change_Proposals_2017#Ballot_37
  • Elliott Lavy (hero volunteer and editor extraordinaire) agreed to produce a change-tracked version of the XDS MU TI supplement that starts with XDS MU Rev 1.8 published in Sep-2016. He will apply all CPs in ballot 37 ***including the changes agreed to in 765 (the CP to be re-balloted). This has three immediate benefits:
    • This produces a Word version with CP updates applied for the benefit of implementers for the Jan connectathon. Absent this, it is extremely difficult for implementers (or anyone) to start with the Final Text TF, apply the changes described in the MU Supplement v1.8, and then account for the deltas in the Final Text CPs from Ballot 37.
    • It get multiple implementers eyes on an interim version of the MU Supplement with changes inline to see if it is implementable and to determine whether we missed anything that can be CP'ed before we officially republish this later in 2017.
    • This version with changes integrated will be supplemental material to ITI-CP-765 when it is re-balloted.
* Lynn will create new CP-ITI-979 to account for the need to update Vol 3 Sec 4.1.4 to 4.1.5 within the MU Supplement, and update references as necessary.  This needed change was identified as a ballot 37 comment.  It will be an 'instant final text' CP because it is editorial, and this change will be part of Elliott's updates (previous bullet)

(4) Next in CPs

Oct-26-2016

Attendees: Bill Majurski, Elliot Silver, Karen Witting, Ken Meyer, Joe Lamy, Elliott Lavy, Tarik Idris, Lynn Felhofer

See current CP status spreadsheet here.

(1) Review of new Incoming CPs ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/0_Incoming

  • CP-ITI-AGB-FixOptionalitySeRAuditMsg.doc - assigned to Rob Horn as CP 968
  • CP-ITI-ELS-Clarify purpose of hash.doc - with minor edits; accepted as Completed: CP 970
  • CP-ITI-ELS-Clarify-XDSResultNotSinglePatient.doc - assigned to Ken M as CP 971. Ken will reach out to Rob and John to get guidance on the scope of the change (eg query, retrieve...) since this error is security related. Then he will propose changed text.
  • Two related incoming CPs:
    • CP-ITI-ELS-addSignsToListOfAssociations.doc - assigned to Elliott L as CP 969. Elliott will review again, taking into consideration changes he proposed in the CP listed below
    • CP-ITI-ESL_Documentation_On_Associations.doc - not accepted as a separate CP. Elliott may decide to move some of these changes into 969. This CP is moved into the Rejected directory on the ftp site.
  • CP-ITI-ESL-clarificationOfChainedAssociations.doc - assigned to Elliott L as CP 972
  • CP-ITI-ESL_Association_Names.doc- assigned to Elliott L as CP 973; the group agreed this is a good change (since the URN is not changed), but Elliott is going to search for other places in the Final Text TF volumes and in TI supplements that may also need to be updated
  • CP-ITI-GEC_tls_version_update.doc- assigned to Rob Horn as CP 974; Rob to assess and make a recommendation
  • CP-ITI-LFaddReferenceToLH7v3Feed.doc- assigned to Lynn as CP 975; needs rewording to improve the change
  • CP-ITI-TI-fix-folder-codeList-example.doc - assigned to Tarik as CP 976;
  • CP-ITI-TPA-XTN-phone-numbers.doc - assigned to Rob Horn as CP 977; Rob to assess and make a recommendation

(2) Assigned CPs ready for discussion ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/1_Assigned/

  • 956-01 - IsSnapshotOf association documentation clean up (Elliott L) - Karen agreed to review this off-line and provide feedback prior to this being marked Completed
  • 961-01 - XCDR Cleanup (Elliott L) - note: changes were reviewed in advance by Karen. Lynn confirmed that this version contains some updates recommended by Karen during her review. This CP is now Completed.
  • 964-01 - Clarify async wrt actors that support MU transactions (Ken) - discussed and moved to "Completed" Title of CP changed to more accurately reflect scope: Clarify XDS Async option with regard to transactions actors must support
  • 738 Revisited - Replace should deprecate other associations -- we agreed to Cancel this CP; rationale is documented in the CP; moved to the Cancelled directory on the ftp site
  • 949-01 - Clarify Folder.lastUpdateTime (Tarik) - ran out of time to review this CP. Deferred to a later CP call

(3) Next in CPs

  • Oct 31 - Ballot 37 comments due (contains Metadata Update CPs)
  • Nov 4, 9-11a, CDT - next CP call is to resolve CP Ballot 37 comments. Comments/CPs available here.
  • Suggestions for new CP call schedule.
    • For the TF Maintenance work item presented during the Planning Cmte Meeting, some members suggested changing the recurring CP schedule to be one-hour once-a-week. In addition, it was suggested to announce in advance that certain CP calls would be focused on certain topics so that the right people are motivated to attend
    • Karen also suggested a pattern to the topics, eg the call in the first week of the month is always Security, week 2 and 3 are always XD*, and week for is Incoming and miscellaneous assigned
    • We will discuss this further duirng the Nov ITI TC F2F meeting and come to agreement on the schedule and model for CP calls going forward.

Oct-7-2016

Attendees: Elliott Lavy, Ben Levy, Ken Meyer, Mark Sinke, John Moehrke, Lynn Felhofer

(1) Resolve CP Ballot 36 comments/votes

(2) Next in CPs

  • Third Thus CP call is supposed to be Oct 20, 9-11 CDT am. Does this need to be rescheduled due to the Planning Cmte F2F?
    • Lynn will create a doodle poll for CP call regulars to find a new date
  • John Moehrke will review open MHD CPs with changes proposed by Rick Riemer of Forcare. John will assess their readiness for committee review and the amount of work to prepare these for ballot so they can be available for Jan Connectathon testers.
  • Ballot 37 (MU CPs) votes/comments due Oct 31. Comments will be reviewed on the CP call on Fri Nov 4.

Sep-27-2016 (MU)

Attendees: Karen Witting, Elliott Lavy, Elliot Silver, John Moehrke, Ken Meyer, Robert Horn, Tarik Idris, Bill Majurski, Lynn Felhofer

See current CP status spreadsheet here.

(1) Assigned Metadata Update CPs ready for discussion ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/1_Assigned/

  • 939-03 - Update MU Supplement to adjust for redoc of ITI-41 and 42 - Karen led the discussion of the remaining open items; Karen will update the CP based on input received today and distribute to the ITI Tech mailing list. Any feedback on that version is due by noon Thurs so an updated version can be produced for ballot by COB Thurs Sep 29.
  • 962-01 - MU - Add parameters for SQ-FindDocumentsByReferenceId - discussed and approved as Completed pending Lynn's updates to the editor instructions.

(2) Incoming MU CPs for consideration ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/0_Incoming/

  • CP-ITI-ELS-UpdateXDS-MUforNewerXDRinVol1.docx - reviewed and accepted Completed -- CP-ITI-967

(3) Overall Summary of MU CPs

  • Our September efforts resulted in completing 8 CPs. See: http://wiki.ihe.net/index.php/ITI_Change_Proposals_2017#Ballot_37
  • Remaining MU CPs not balloted:
    • 533 - MU delete from Repository - on 9/23, Ken submitted a work-item proposal for ITI Planning Cmte consideration in the 2016-17 cycle
    • 785 - Patient ID Consistency in stored query responses wrt XDS metadata update - there was an extensive discussion of issues and alternatives
      • In the November timeframe, Bill will be writing MU test cases to expose current Registries' behavior for these queries
      • In parallel, Mark will write up use cases for an administration (not Doc Consumer) in the context of this CP
      • These two efforts will provide more detail from two perspectives and will inform how this CP will eventually be resolved; no textual changes will be proposed until these efforts make the path forward clearer.

(4) ...if time... discussion of Assigned CP: ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/1_Assigned/

  • 923-02 - Redoc aggressive validation specification (Bill & Ken) - this was discussed; Ken received input from the group as input to the next revision. This will be discussed in a future call.

(5) Next in CPs

  • CP Ballot 37 timing:
    • Sep-29-2016 - Completed (ready-for-ballot) CPs to Lynn
    • Sep-30-2016 -Lynn packages ballot & send to Jeremiah
    • Oct-03-2016 - Ballot announced by Jeremiah
    • Oct-31-2016 - Ballot closed
    • Nov-04-2016 - Comment resolution webex
  • CP Ballot 36 comments will be resolved at during our Oct 7 CP call.

Sep-7-and-23-2016 (MU)

Attendees Sep 7: Ben Levy, Elliot Silver, Bill Majurski, Tarik Idris, Elliott Lavy, John Moehrke, Ken Meyer, Mark Hodgson, Mark Sinke, Karen Witting, Harsha (eMedical), Lynn Felhofer

Attendees Sep 23: Elliot Silver, Karen Witting, Ken Meyer, John Moehrke, Walco van Loon, Bill Majurski, Manuel Metz, Joe Lamy, Lynn Felhofer

(1) 2016 version of XDS Metadata Update TI Supplement and Final Text volumes

(2) Assigned Metadata Update CPs ready for discussion ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/1_Assigned/

  • Sep 23 results:
    • 765 - Metadata Update Queries with MU level not set/set to 1 - CP was reviewed and slightly revised. Lynn will verify the editorial changes vs the current-published MU supplement. Then this is ready for ballot.
    • 810 - Update ITI Security Considerations in MU Supplement - re-assigned to John. He will update the CP, then it is ready for ballot.
    • 939 - Update MU Supplement to adjust for redoc of ITI-41 and 42 - Karen led the discussion on this one. Further edits needed based on guidance from the call. Will be discussed again on Sep 27 CP call.
    • 962 - MU - Add parameters for SQ-FindDocumentsByReferenceId - assigned to Ken - out of time to discuss this one. Deferred to Sep 27 CP call.
  • Sep 7 results:
    • 559 - MPQ profile queries vs Metadata Update option - re-assigned to Mark who will updated both the rationale and the note added by the CP based on Sep 7 discussion. Version -04 of this CP is updated and now ready for ballot
    • 756 - MPQ fixes to ensure Metadata Update compatibility - this CP will be Cancelled; we will not accommodate MPQ queries in the context of MU. Since CP 559 is also MPQ-related and will be balloted, Mark will update 559 to include the rationale for not updating MPQ queries for MU.
    • 785 - Patient ID Consistency in stored query responses wrt XDS metadata update - there was an extensive discussion of issues and alternatives
      • In the November timeframe, Bill will be writing MU test cases to expose current Registries' behavior for these queries
      • In parallel, Mark will write up use cases for an administration (not Doc Consumer) in the context of this CP
      • These two efforts will provide more detail from two perspectives and will inform how this CP will eventually be resolved; no textual changes will be proposed until these efforts make the path forward clearer.

(3) Incoming MU CPs for consideration ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/0_Incoming/

  • Sep 23 results:
    • CP-ITI-KM_MU_Actor_Requirements.doc (updated to add Document Consumer-$MetadataLevel parameter) - this is CP-ITI-965. It is Completed and ready for ballot.
    • CP-ITI-KM_MU_ITI_57_Correct_ATNA_No_Async - assigned to John M as CP-ITI-966. When John reviews and updates the CP, it will be ready for ballot
    • CP-ITI-ELS-MU-additional-updates.doc - withdrawn. These changes have been incorporated into CP 939.
    • CP-ITI-ELS-UpdateXDS-MUforNewerXDRinVol1.docx - out of time to discuss this one. Deferred to Sep 27 CP call.
  • Sep 7 results:
    • CP-ITI-KM_MU_Asynchronous_Support.doc - accepted as CP 964 assigned to Ken, but scope was changed; we will not add async option to Doc Admin, but we will add a note to clarify the scope of transactions that must be supported, eg if a Registry supports async & MU, it does not have to support async on MU transactions. This CP will be moved out of the MU effort and discussed next on Sep 27

(4) Next in CPs

  • The Tues Sep 27 CP call has been repurposed to finish MU work. The regular CP agenda that was supposed to be covered in that call needs to be rescheduled for later in Oct. We will reschedule that call on Tues.
  • CP Ballot 36 comments will be resolved at during our Oct 7 CP call. See below.

Aug-18-2016

Attendees: Ken M (Merge/IBM), Bill M (NIST), John M (Moehrke Research), Karen W (Ready Computing), Elliott L (Harris Computing), Tarik I (InterComponentWare), Joe Lamy (SSA), Lynn F (ITI TPM)

See current CP status spreadsheet here.

(1) Review of new Incoming CPs

  • CP-ITI-ELS-Add-OnDemand-to-FindDocumentsByRefId.doc - accepted as CP 955; status is Completed
  • CP-ITI-ELS-IsSnapshotOf-redoc.doc - accepted and assigned to Elliott L as CP 956. Elliott agreed to finish proposed changes to the text based on today's discussion. The scope of this CP is also expanded to include the request for an informative UML diagram (other submitted CP below). Lynn will ask Sylvie if she can produce a diagram to accompany the improvements in text proposed by Elliot S and Elliott L.
  • CP-ITI-ELS-More-immutable-submission-set.doc - accepted as CP 957; status is Completed
  • CP-ITI-ESL_Effects_of_Merge_on_Relationship_Associates.doc - accepted as CP 958; status is Completed
  • CP-ITI-ESL_PDQ_PatientId_Audit.doc - accepted and assigned to John M as CP 959.
  • CP-ITI-ESL_SoapActionRequired_Mandatory.doc - accepted as CP 960; status is Completed
  • CP-ITI-ESL_XCDR-XDR_Cleanup.doc - accepted and assigned to Elliott L & Ken M as CP 961; Karen agreed to review the changes proposed by Elliott and Ken; if needed, will be discussed at a future CP call
  • CP-ITI-IsSnapshot-UML.doc - the request in this will be folded into the scope of CP 956 so that all 'Snapshot' changes can be reviewed together. See CP 956 in 2nd bullet above.
  • CP-ITI-KM_MU_AddMetadataParamFindDocsByRefId.doc- accepted and assigned to Ken CP 962; discussion of this CP is deferred to a future Sept CP calls focused on MU
  • CP-ITI-LF-AddPullPointRqmtsToITI-53inDSUBsupplement.doc - accepted as CP 963; status is Completed
  • CP-ITI-GEC_tls_version_update.doc -- not discussed (Lynn missed that George Cole had dropped this into "Incoming"). Will review at future CP call.

(2) Assigned CPs for discussion ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/1_Assigned/

  • 937-01 - DSUB Audit Msg - (Ken, Mauro) -- contents of the CP was discussed; Ken will share updated version with John via email to gain further input. CP remains Assigned.

(3) Next in CPs

  • The plan for MU CP resolution in Sep/Oct:
    • dedicate two CP calls in Sept to resolving 6 assigned MU CPs
      • Lynn will create a doodle poll to pick new dates. The regularly schedule Sept dates are problematic (Sept 2 - right before Labor Day weekend; Sept 15 - Lynn on vacation). Doodle poll will go out to key MU stakeholders (if you want to participate, send Lynn an email). Once the dates are set, the invitation to the calls will go out to ITI Tech to invite participation from all
    • MU CPs in scope for Sept discussion:
      • 559 - MPQ profile queries vs Metadata Update option - assigned to Bill
      • 756 - MPQ fixes to ensure Metadata Update compatibility - assigned to Walco
      • 765 - Metadata Update Queries with MU level not set/set to 1 - assigned to Bill
      • 785 - Patient ID Consistency in stored query responses wrt XDS metadata update - assigned to Mark Sinke
      • 939 - Update MU Supplement to adjust for redoc of ITI-41 and 42 - assigned to Karen
      • 962 - MU - Add parameters for SQ-FindDocumentsByReferenceId - assigned to Ken
    • Out of scope for Sept discussion:
      • 533 MU delete from Repository - this should be submitted as a new work item for 2016-17
    • ballot the newly-Complete MU CPs late Sep to late Oct
    • Nov 1-ish, the balloted/approved CPs are ready for the implementer community for the January connectathon.
  • Ballot 36 - Lynn will make a CP ballot out of the 8 CPs in Completed status as of the end of this meeting. Will go out in the coming few days.

Aug-5-2016

Attendees: Ken M, Lynn F, Bill M, Tarik I, Elliott L

(1) Revisit one Completed CP ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/2_Completed/

  • CP-ITI-756-03 - MPQ fixes to ensure Metadata Update compatibility
    • Comment from Ken M: While I agree with Bill's comments for the need to add the additional parameter and text, I don't agree that $AssociationStatus is valid parameter for either of these two queries.
    • Outcome 1: This CP was pulled back from "Completed" to "Assigned". Bill asked for a Use Case for adding MU capability to the MPQ query. There was no use case in the CP, just a request for the technical change. Lynn will follow up with the XDS implementors list to see whether one can be identified. Else this CP will Cancelled. Version -04 is placed back into the Assigned directory on the ftp site with these notes.
    • Outcome 2: CP-ITI-559 (MPQ profile queries vs MU option) passed ballot 29 and was about to be integrated into the 2016 revision of the MU supplement this conflict was discovered with CP-ITI-756, sot was set back to Assigned. When a response is received on the XDS implementer's list, we will have direction on these two CPs.

(2) Assigned CPs for discussion ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/1_Assigned/

  • CP-ITI-621 - Metadata Update and Deprecated Folders (Ken & Bill) - Cancel this CP. Cancellation rationale: Based on the OASIS standard rule that Registries shall ignore parameters they do not understand, the provisions of CP are not needed. version -02 is stored in ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/6_Cancelled/
  • CP-ITI-923-01 - Redoc aggressive validation specification (Ken M) - this CP remains assigned to Ken. He will continue work based on today's discussion.

(3) Review of new Incoming CPs ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/0_Incoming/

  • CP-ITI-KM_MU_AddMetadataParamFindSubmissionSets.doc - reviewed and discussed with attendees. Ken agreed to withdraw this CP (at least for now).
  • CP-ITI-TI-Clarify_Folger_lastUpdateTime.doc - Accepted and assigned to Tarik as CP-ITI-949. Input from Elliot S and from attendees on the call is added to the rationale for the CP.
  • CP-ITI-KM-External-Identifiers-Cleanup-Redundant-Text.doc - Ken is withdrawing this incoming CP. The changes are related to CP-ITI-923, and he will include these changes in that CP
  • These two CPs are for editorial changes to FT Volumes that have not yet gone to Mary. Lynn will make "instant FT" CPs out of these so this can get fixed in the 2016 TF Vol 2b and 3 (not yet submitted to Mary). CPs stored in ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance-2016/CPs/3_FinalText/
    • CP-ITI-ESL_AppendixV_Table_Reference.doc - accepted as CP-ITI-950
    • CP-ITI-ESL_Case_Correction.doc - accepted as CP-ITI-951
  • Out of time. Discussion of these CPs is deferred to the next CP call on Aug 18:
    • CP-ITI-ESL_Effects_of_Merge_on_Relationship_Associates.doc
    • CP-ITI-ESL_SoapActionRequired_Mandatory.doc
    • CP-ITI-ESL_XCDR-XDR_Cleanup.doc
    • CP-ITI-IsSnapshot-UML.doc
    • CP-ITI-KM_MU_AddMetadataParamFindDocsByRefId.doc

(4) Other....

  • Going forward, ITI CPs will be maintained here: ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance/CPs/
    • Annual directories for Balllots and Integrated CPs to match the publication cycle
    • Other directories reflect the current state (eg currently assigned CPs, currently incoming....)