ITI CPs 2014-03-20
ITI domain CPs for 2013-2014 are managed here: http://wiki.ihe.net/index.php?title=ITI_Change_Proposals_2014
This page contains the agenda and minutes for the Mar 20, 2014 meeting.
Mar-20-2014
Thu, 9-11am Central US
Agenda
(1) Discuss assigned CPs ready for review: ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance-2014/CPs/1_Assigned/
- CP-ITI-458-02 - Multi-Document Retrieve (Bill)
- CP-ITI-588-00 - XDSAssociationStatus default not consistent with other query parameters (Bill)
- CP-ITI-721-01 - Clarify associations in different submission sets (Bill)
- CP-ITI-684-02 - No error code for errors in document content (Mark S)
- CP-ITI-692-01 - Character String Matching Ambiguous (Mark S)
- CP-ITI-746-01 - Correct example language from en-us to en-US (Walco)
- CP-ITI-740-01 - Vol 3 update of Metadata Update Supplement (Karen)
- CP-ITI-762-00 - Integrate gen'l purpose content from MU Supplement (Karen)
- CP-ITI-761-01 - Use of MemberOf(1), (2), (3), (4) lacks needed clarity (Karen)
- CP-ITI-551-03 - DSG URN Clarification (Rob)
- CP-ITI-617-01 - Update to Provider Info Directory audit msg in HPD (Lynn)
(2) Ballot 21 planning
- Currently completed CPs are here: ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance-2014/CPs/2_Completed/
- Timeline PROPOSAL:
- 03/25/2014 -- ballot content & spreadsheet sent to IHE USA staff (Lynn)
- 03/27/2014 -- ballot sent to ITI Tech email list (Nancy)
- 04/25/2014 -- ballot comments due (ITI Tech)
- mm/dd/2014 -- ballot comments consolidated (Lynn)
- mm/dd/2014 -- CP call for ballot 21 review (ITI Tech)
(3) Incoming CP review: ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance-2014/CPs/0_Incoming/
- CP-ITI-LF_HPD-attribute-typos.doc
- CP-ITI-LF_HPD-clarify-semantics-of-R-R2.doc
(4) Strategies for addressing backlog of assigned CPs (cont.)
- For reference, see the "ForAnalysis" tab in the status spreadsheet, and the "ITI-CPs-Low_Hanging_Fruit.xlsx in ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance-2014/CPs/Status/
(5) Planning for Fri Apr 4 CP call
- Lynn cannot chair this one due to travel to EU Connectathon.
Minutes
Attendees: Karen Witting, Bill Majurski, Eliot Silver, Elliott Lavy, Gil Levi, Gila Pyke, John Moehrke, Mark Sinke, Mauro Zanardini, Rob Horn, Lynn Felhofer
Status: an updated status spreadsheet, dated 2014-03-20, with the results of this call is here: ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance-2014/CPs/Status/
(1) Discuss assigned CPs ready for review: ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance-2014/CPs/1_Assigned/
- CP-ITI-458-02 - Multi-Document Retrieve (Bill) - accepted for ballot 21
- CP-ITI-588-00 - XDSAssociationStatus default not consistent with other query parameters (Bill) - accepted for ballot 21
- CP-ITI-721-01 - Clarify associations in different submission sets (Bill) - accepted for ballot 21
- CP-ITI-684-02 - No error code for errors in document content (Mark S) - accepted for ballot 21
- CP-ITI-692-01 - Character String Matching Ambiguous (Mark S) - accepted for ballot 21
- CP-ITI-746-01 - Correct example language from en-us to en-US (Walco) - discussed & accepted for ballot 21
- CP-ITI-740-01 - Vol 3 update of Metadata Update Supplement (Karen) - accepted for ballot 21
- CP-ITI-762-00 - Integrate gen'l purpose content from MU Supplement (Karen) - review of changes by the group; work will continue
- CP-ITI-761-01 - Use of MemberOf(1), (2), (3), (4) lacks needed clarity (Karen) - accepted for ballot 21, figures will be updated after ballot as part of integration into Final Text
- CP-ITI-551-03 - DSG URN Clarification (Rob) - will need additional work; removed from low-hanging-fruit list
- CP-ITI-617-01 - Update to Provider Info Directory audit msg in HPD (Lynn)
- CP-ITI-694 - This referenceIdList CP is already in final text. Change status to cancelled.
(2) Ballot 21 planning
- Currently completed CPs are here: http://wiki.ihe.net/index.php?title=ITI_Change_Proposals_2014#Ballot_21
- Timeline for Ballot 21:
- 03/25/2014 -- ballot content & spreadsheet sent to IHE USA staff (Lynn)
- 03/26/2014 -- ballot sent to ITI Tech email list (Nancy)
- 04/25/2014 -- ballot comments due (ITI Tech)
- 04/28/2014 -- ballot comments consolidated (Lynn)
- during the Apr 28 ITI Tech F2F -- CP call for ballot 21 review (ITI Tech)
(3) Incoming CP review: ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance-2014/CPs/0_Incoming/
- CP-ITI-LF_HPD-attribute-typos.doc - remains in Incoming. Some doubt as to whether it is needed; Lynn to track down HPD connectathon participant who identified the problem.
- CP-ITI-LF_HPD-clarify-semantics-of-R-R2.doc - accepted as ITI-CP-766. Gila to find an editor for this CP.
(4) Strategies for addressing backlog of assigned CPs (cont.)
- For reference, see the "ForAnalysis" and "LowHangingFruit" tabs in the status spreadsheet inin ftp://ftp.ihe.net/IT_Infrastructure/TF_Maintenance-2014/CPs/Status/
- Mark, Walco and Karen will take a look at the CPs categorized as "XDS-Vol3"
- 9 CPs on the 'low hanging fruit' list were completed for ballot 21; one is cancelled!
- further discussion on ways to attack this list during the May F2F
(5) Planning for Fri Apr 4 CP call
- Karen will chair this call. Lynn will do the prep.